177174

N/A

Westmeath - Westmeath County Council

Proposed Development

Planning Permission for the construction of a side extension to my parents dwelling house, connection to the existing septic tank with percolation area and existing water supply on their lands

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Sept 2017

  2. Further information requested

    10 Nov 2017

  3. Application withdrawn

    25 Jun 2019

Application Details

Location
Streamstown , Mullingar , Co Westmeath
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Westmeath County Council
Floor Area
167.55 sq m
Residential Units
1

Timeline

Registration Date
19 September 2017
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
25 June 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

278m
2443CONDITIONAL24 Jun 2024

RETENTION and completion of existing dormer dwelling as constructed on site (up to DPC level). Permission is also sought to install wastewater treatment system and percolation area and associated site works all as previously granted under planning ref 17/7173

Lisnagree , Streamstown , Co.Westmeath

282m
177173CONDITIONAL18 Sept 2017

The construction of a dormer bungalow type dwelling with waste water treatment system and ancillary site services

Streamstown , Mullingar , Co. Westmeath

393m
2460486CONDITIONAL18 Dec 2024

construction of a 4 bedroom dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage

Lisnagree , Streamstown Mullingar , Co. Westmeath

587m
2460184N/A30 May 2024

development which will consist of constructing a new dwelling, garage, waste water treatment system & percolating area and all associated site works

Lisnagree Streamstown , Mullingar , Co Westmeath

768m
2460009CONDITIONAL17 Jan 2024

construction of a 4 bedroom dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage

Lisnagree , Streamstown , Co. Westmeath

769m
197061CONDITIONAL13 Mar 2019

Bungalow-type dwelling house with waste water treatment system and ancillary services

Lisnagree , Streamstown , Co Westmeath

780m
2560138CONDITIONAL28 Mar 2025

constructing a new dwelling, garage, wastewater treatment system & percolating area, share existing entrance onto public road and all associated site works

Lisnagree Streamstown , Mullingar , Co Westmeath.

783m
2660208N/A24 Apr 2026

to install 1248 panels with a maximum output of 748.8 kw DC  25 degree fixed tilt solar panels on a ground mounted system not exceeding 1.9 metres in height. An ESB sub station and electrical switch room is also planned

Streamstown TD , Mullingar , Co. Westmeath

785m
2660286N/A29 May 2026

RED III - to install 1248 panels with a maximum output of 748.8 kw DC  25 degree fixed tilt solar panels on a ground mounted system not exceeding 1.9 metres in height. An ESB sub station and electrical switch room is also planned. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Streamstown TD , Mullingar , Co. Westmeath

943m
2236CONDITIONAL2 Feb 2022

a dwelling house and domestic garage with septic tank and percolation area and all associated site works

Lisnagree , Streamstown , Athlone

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?