Proposed Development

to erect a dwelling house, driveway and garage, install a septic tank and percolation area and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Nov 2017

  2. Decision: CONDITIONAL

    18 Dec 2017

  3. Decision due

    5 Jan 2018

  4. Grant issued

    26 Jan 2018

Application Details

Location
Springmount , Kilmore , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
258 sq m
Residential Units
1

Timeline

Registration Date
2 November 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 December 2017
Grant Date
26 January 2018
Permission Expires
25 January 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

115m
20373CONDITIONAL10 Jun 2020

to erect a dwelling house, garage, entrance and install an effluent treatment system and percolation area and all associated site works.

Springmount , Kilmore , Co. Clare

272m
2660053CONDITIONAL5 Feb 2026

to construct an Agricultural Shed and associated site works

Springmount , Kilmore , Co. Clare

372m
17863CONDITIONAL13 Nov 2017

to erect a dwelling house, driveway and garage, install a septic tank and percolation area and all associated site works

Springmount , Kilmore , Co. Clare

436m
2360083CONDITIONAL23 Mar 2023

to construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works

Springmount , Kilmore , County Clare

470m
221080N/A1 Dec 2022

to demolish existing derelict dwelling house and existing shed and for the construction of a new replacement dwelling house, wastewater treatment system and all ancillary site works

Springmount , Kilmore , Co Clare

653m
21182CONDITIONAL1 Mar 2021

the development will consist of construction of one new single storey dwelling house with wastewater treatment system, bored well, garage, entrance from public road and all associated works

Leitrim , O'Briensbridge , Co Clare

766m
23365CONDITIONAL23 Jun 2023

for the provision of a roofed structure for dry effluent storage (dugstead) and all associated site works

Leitrim , Kilmore , Co Clare

835m
24385N/A18 Nov 2024

to fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, utilising existing site entrance, including all ancillary site works

Ballyquin More Td , O'Briensbridge , Co Clare

1.1km
2560794CONDITIONAL12 Dec 2025

the proposed development, on an overall site of 3.58 hectares, will consist of: A co-located Battery Energy Storage System (BESS) Compound with associated internal access tracks; Access to the proposed BESS compound will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded as permitted as part of the Fahy Beg Wind Farm (under Clare County Council Ref: 23148 & ACP Ref 317227); Installation of grid code compliance equipment to facilitate an under-the-fence connection to the adjacent Fahy Beg 38kV substation. The grid code compliance equipment will include: Backup Generator, Neutral Earthing Resistor (NER), Auxiliary House Transformer, Marshalling Kiosks; 3 no. spare parts shipping containers (measuring 12.2 m (L) x 2.4 m (W) x 2.6 m (H)); and Associated ancillary development. Installation of 32 no. Battery Energy Storage Units comprising metal shipping containers housing batteries (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each), and associated ancillary control and ventilation units; Installation of 8 no. Medium Voltage (MV) Inverter Stations comprising metal shipping containers housing the inverter, MV transformer, and an MV-LV room (measuring 6 m (L) x 2.4 m (W) and 2.9 m (H) each); Installation of 1 no. water storage tank (measuring 5.15 m (L) x 4.15 m(W) x 2.58 m (H)); Construction of 250m of new access tracks; Provision of a crane hardstanding area to facilitate lifting operations on site (280m2); Provision of 10 no. car parking spaces (8 no. standard parking spaces, and 2 no. accessible parking spaces); Reprofiling of the existing cut slope embankment with the erection of a gabion basket retaining wall measuring 75m in length and 2.5m in height, and construction of a reinforced fill slope embankment; Underground electrical and communications cabling; Security lighting, CCTV and communications mast; Provision of 150m of Sound reflective barriers; Security fencing and gates; Drainage system including on-site surface water attenuation ponds; Tree felling of 0.19 Ha (1,890m2) to facilitate required clearance for BESS compound, associated earthworks and drainage infrastructure; Removal of 109m of hedgerow to facilitate development of the BESS compound, and replanting of 109m at perimeter locations; and All associated ancillary site development and vegetation clearance works including landscaping and hedgerow reinstatement. The Applicant requests that the development be

Within the townlands of Woodpark TD and Leitrim TD , near Bridgetown , Co. Clare

1.1km
2460603REFUSED29 Nov 2024

for development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.

Ballyquin More and Woodpark , Ballyquin , Co. Clare