17869
CONDITIONALClare - Clare County Council
Proposed Development
to RETAIN extension to existing B&B accommodation consisting of ground floor dining/sunroom, two w.c. cubicles, and associated ancillary works at Berry Lodge.
View the full application file on the council's planning portal →Application Timeline
Application received
15 Nov 2017
Decision: CONDITIONAL
15 Jan 2018
Decision due
18 Jan 2018
Grant issued
15 Feb 2018
Application Details
- Location
- Annagh , Miltown Malbay , Co. Clare
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 15 November 2017
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 January 2018
- Grant Date
- 15 February 2018
- Permission Expires
- 14 February 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for development which will consist of (a) planning permission for a traditional/ contemporary style dwelling on a family landholding (b) conversion of existing cow shed to garage for domestic use, (c) installation of an on site effluent treatment system with percolation area and (d) all associated works
Caherrush , Quilty , Co. Clare
to demolish existing shed and construct a dwelling house, garage, garden/office, deck area, install proprietary wastewater treatment system, percolation area and associated ancillary works
Caherrush , Quilty , Co Clare
to construct a farm building used for the storage of machinery and hay, and not used for housing animals, with all associated site works
Caherrush , Quilty , Co. Clare
to Extend the Appropriate Period of Planning Permission P12-756 to construct a haybarn and machinery shed
Caherush , Quilty , Co. Clare
to construct a dwelling house and garage, including a wastewater treatment system, new road access and ancillary works
Annagh , Miltown Malbay , Co Clare
for development of 2 No. velux roof windows to front and rear of existing dwelling and to complete conservatory to side of same granted under P07-648 and a private garage
Annagh , Miltown Malbay , Co. Clare
the development will consist of construction of an agricultural shed with cubicles, underground slatted slurry and soiled water storage tanks, milking parlour, dairy and plant room and relocation of external feed bin and all associated site works.
Caherrush , Quilty , Co. Clare
to construct a new dwelling house, sewage treatment system and construct a new entrance onto public road and associated site works
Annagh , Miltown Malbay , Co. Clare
for development which will consist of the demolition of the existing domestic garage, and the construction of a raised roof with attic accommodation 79.5m2, and single story pitched roof porch extensions to the front 12m2, and a 70m2 flat roofed single storey extension to the rear, local stone to feature wall, replacement windows and doors, and new detached shed 7.3m2, with alterations to site works, upgrade of sewage treatment system and services
Caherush , Quilty , Co. Clare
for development of 1 no. primary wastewater pumping station at the Armada House and 1 no. secondary wastewater pumping station at the Armada Hotel, Spanish Point County Clare and for the development of a rising main wastewater pipe (c. 4.3kms in length) located within the public road carriageway (L6224, R482 and N67) in the townlands of Leagard South, Dough, Annagh, Caherrush, Emlagh and Quilty West, County Clare. The proposed development includes works within the curtilage of a protected structure, Armada House, formally Mother McCauley House (RPS No. 025) and works to the Bealaclugga Bridge which is a protected structure (RPS No. 185). The proposed development will consist of the following: 1. Provision of 1 no. primary wastewater pumping station at the Armada House, to service the existing Armada Hotel and the existing Armada House; 2. Provision of 1 no. secondary wastewater pumping station at the Armada Hotel, including 2 no. wastewater holding tanks; 3. Provision of a 110mm rising main pipe from the Armada Hotel to the Armada House (c. 240m in length), within the public road crossing the R482 and L6224; 4. Provision of 1 no. 110mm rising main pipe located within the public road (L6224, R482 and N67) from the proposed primary wastewater pumping station at the Armada House to the existing Irish Water foul sewer network at Quilty, which conveys flows to the existing Irish Water Kilmurry Ibrickane Wastewater Treatment Plant (Asset Number: D0536-02). The proposed rising main is c.4.3km in length and located entirely within the public road corridor; 5. Decommissioning and removal of 1 no. existing wastewater treatment plant, existing polishing filter, and existing percolation area at the Armada Hotel; 6. Decommissioning and removal of 1 no. existing wastewater treatment system and percolation area at the Armada House; 7. Provision of 1 no. temporary construction compound at the Armada House for the duration of the works; 8. All associated development and site enabling works and ancillary infrastructure including screening planting, scour valves, air valves,1 no. vent pipe, and 1 no. discharge manhole. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
Armada House and Hotel , Spanish Point , Co. Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.
Do I Need Permission?