17919

CONDITIONAL

Clare - Clare County Council

Proposed Development

on the Grant of Outline Permission (Ref 14-659 ) to construct a dwelling house and domestic garage including connections to public services together with associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Nov 2017

  2. Decision: CONDITIONAL

    25 Jan 2018

  3. Decision due

    31 Jan 2018

  4. Grant issued

    25 Feb 2018

Application Details

Location
Shanaway Road , Claureen , Ennis
Applicant
N/A
Application Type
PERMISSION CONSEQUENT
Planning Authority
Clare County Council
Floor Area
224.6 sq m
Residential Units
1

Timeline

Registration Date
28 November 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 January 2018
Grant Date
25 February 2018
Permission Expires
24 February 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

42m
20356CONDITIONAL4 Jun 2020

to construct a dwelling house and domestic garage including all associated site development works and services

Garran Na Coille , Claureen , Ennis

42m
2042N/A30 Jan 2020

(Planning Ref 17/916) to construct a dwelling house (B) Planning Permission to construct a domestic garage, including all associated site development works and connections to public services

Garrran Na Coille , Claureen , Ennis

42m
17916CONDITIONAL27 Nov 2017

to construct dwelling house with all ancillary site works including new entrance from Garran na Coille

Garran na Coille , Claureen , Ennis

50m
19210CONDITIONAL25 Mar 2019

for development which will consist of the construction of a dwelling house, garage, ancillary site work and connection to public services

Shanaway Road , Claureen , Ennis

50m
19715CONDITIONAL12 Sept 2019

for development which will consist of a revised dwelling house design, including amendments to site layout and floor level and the omission of garage, all to that previously granted under planning reference P19-210

Shanaway Road , Claureen , Ennis

56m
17417CONDITIONAL29 May 2017

for the proposed construction of a new detached garage and ancillary site works

37 Garrán na Coille , Shanaway Road , Ennis

61m
21217CONDITIONAL12 Mar 2021

to construct a single dwelling house, connection to public services and ancillary site works

Shanaway Road , Claureen , Ennis Co Clare

62m
21939CONDITIONAL7 Sept 2021

for a change of house design granted planning permission under Planning Reference No. P21/217

Shanaway Road , Claureen , Ennis Co Clare

123m
2660411CONDITIONAL24 Jun 2026

for the construction of single storey extensions to the side and rear of the existing house, modifications to the front elevation and all ancillary site works

32 Garrán Na Coille , Shanaway Road , Ennis Co. Clare

165m
258006UNCONDITIONAL27 Jun 2025

to carry out the following development: The proposed development will include: 1) Construction of Mini Roundabout at the junction of the N85 and the L4601 Shanaway Road. 2) 2 No. raised controlled pedestrian crossings on the N85 with central Islands. 3) 1 No. uncontrolled pedestrian crossing on the L4601 Shanaway Road. 4) Installation of additional public lighting columns and associated ancillary works to tie into existing public lighting system. 5) Installation of new gullies, tapping into existing surface drainage system. 6) Provision of associated Signage and Road Markings. 7) All associated and ancillary site works. In accordance with the Birds and Natural Habitats Directive, Screening for Appropriate Assessment has been carried out on the project. An Environmental Impact Assessment (EIA) screening statement has been prepared and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.

N85/Shanaway Road Junction , Claureen , Ennis Co. Clare