17978

N/A

Clare - Clare County Council

Proposed Development

to construct an entrance and access road to existing forestry block along with ancillary site works

View the full application file on the council's planning portal →

Application Details

Location
Maghera Td , (ED Ballyea) , Inagh (Site 2)
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
18 December 2017
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
1838CONDITIONAL24 Jan 2018

to construct an entrance and access road to existing forestry block along with ancillary site works ( Site 2 )

Maghera Td , Ballyea , Inagh

525m
2560798CONDITIONAL15 Dec 2025

to replace the existing water supply reservoir tank with a new water supply reservoir tank of increased capacity

Ballyduff More , Inagh , Co. Clare

543m
21615CONDITIONAL14 Jun 2021

the development consists of RETENTION of alterations to granted application P19/865 including: dwelling position; dwelling alterations including additional velux windows to front elevation, additional door to west elevation, additional door and relocated window to rear elevation, relocated window to east elevation; all ancillary site works

Maghera , Inagh , Co Clare

543m
19945CONDITIONAL4 Dec 2019

for a detached private shed constructed to the rear of an existing dwelling house, with dual access from both the dwelling and an agricultural entrance and all associated site works

Ballyduff More , Kilnamona , Co Clare

545m
19865CONDITIONAL7 Nov 2019

the development will consist of the construction of a new dwelling-house, detached domestic garage, new entrance, installation of a new wastewater treatment system and percolation area, and all associated site work

Maghera , Inagh , Co Clare

609m
17979N/A18 Dec 2017

to construct an entrance and access road to existing forestry block along with ancillary site works

Maghera Td , (ED Ballyea) , Inagh (Site 1)

609m
1837CONDITIONAL24 Jan 2018

to construct an entrance and access road to existing forestry block along with ancillary site works ( Site 1 )

Maghera Td , Ballyea , Inagh

984m
2560499CONDITIONAL12 Aug 2025

to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works

Maghera , Inagh , Co. Clare

1.1km
17740CONDITIONAL28 Sept 2017

for development which consists of the construction of a Slatted Unit and associated site works

Ballyduff More , Kilnamona , Co. Clare

1.1km
19709CONDITIONAL9 Sept 2019

to construct a new forest road with bell mouthed entrance to facilitate timber harvesting, haulage operations and associated site works to existing forestry lands

Ballyduff More Tld , Kilnamona , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.