Proposed Development
Development of an extension to the existing pharmaceuticals manufacturing facility to include (i) a new part single-storey, part two-storey processing building (ii) 2no. single-storey link corridors to connect the proposed processing building with the existing facility (iii) all associated site development, drainage, landscaping and ancillary works, including the removal of existing external access stairs and an existing door, relocated roof access ladder, new covered external stairs and new external access door, new roof top plant, including 3no. AHUs, roof equipment platform, and vent stacks. The proposed development also includes a two-storey extension and replacement external stairs to the existing two-storey utility building; a new roller shutter and door to the northern façade of the existing eluation building; and new roof top plant and 1no. AHU to the existing eluation building at the existing LEO Pharma facility, Wallingstown, Little Island, Co. Cork. This application relates to a development which comprises an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency 1992 (as amended) is required.
View the full application file on the council's planning portal →Application Timeline
Application received
14 Mar 2018
Decision: CONDITIONAL
4 May 2018
Decision due
8 May 2018
Grant issued
11 Jun 2018
Application Details
- Location
- The existing LEO Pharma Facility Wallingstown Little Island Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 14 March 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 May 2018
- Grant Date
- 11 June 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Infrastructure upgrade works to include the construction of an above ground 790cu.m mains-fed circular galvanised, butyl lined steel firewater supply tank, a pumphouse and associated pipework to supply sprinkler systems and site fire hydrants and the construction of a new 2,000cu.m firewater retention pond, associated pipework and a control building with associated site works which includes installation of berms and a new 2.4m high palisade fencing. This application relates to an which has an Industrial Emissions License (PO091-02). A Natura Impact Statement will be submitted to the planning authority with the application.
The existing LEO Pharma facility Wallingstown Little Island Co. Cork
Two-storey extension to laboratory building to accommodate a pilot plant, demolition of existing offices & van dock, construction of single storey extension to accommodate a new eluation area between the production & laboratory buildings, two-storey extension to the production building to accommodate spray drier facilities, single storey extension to the production building to accommodate a filter room, a two-storey extension to the utilities building & minor related alterations & site works to the existing pharmaceutical plant
Wallingstown Little Island
Construction of two-storey process building with adjoining single storey store, modifications to existing vehicular entrance to accommodate a new goods entrance road, and associated site works
Wallingstown Little Island
Construction of a two-storey process building with an adjoining single storey store for use in conjunction with existing pharmaceutical plant, modifications to existing vehicular entrance to accommodate a new goods entrance road & associated site works
Wallingstown Little Island
Construction of extension to pharmaceutical plant to incl. reception facilities, offices, alterations and anc. site works
WALLINGSTOWN, WALLINGSTOWN,
Two-storey extension to laboratory building to accommodate a pilot plant, demolition of existing offices & van dock, construction of single storey extension to accommodate a new eluation area between the production & laboratory buildings, two-storey extension to the production building to accommodate spray drier facilities, single storey extension to the production building to accommodate a filter room, a two-storey extension to the utilities building & minor related alterations & site works To the existing pharmaceutical plant
Wallingstown Little Island
Change of use of 3 no. units from light industrial use to wholesale warehouse use for storage and distribution with ancillary trade counter and ancillary offices and internal and external alterations to same to include amalgamation of 3 no. units
Units 1, 2 & 3 Site No.4 Wallingstown Little Island
Construction of industrial/commercial building comprising of 5 no. units (change of plan)
Site No. 4 Wallingstown Little Island
Carry out internal alterations to existing industrial/commercial building, which includes part removal of the existing party wall dividing both units 4&5, alterations to the existing ground floor layout of offices, reception and sanitary facilities within unit 4, to extend the existing first floor within unit 4 to accommodate office space, and to carry out external alterations, which includes the installation of windows to existing external walls facade of unit no 4
Units 4&5 Site no 4 Wallingstown Little Island, Co. Cork
Carry out internal alterations to existing industrial/commercial building, which includes part removal of the existing party wall dividing both units 4 & 5 to form one unit, alterations to the existing ground floor layout of offices, reception and sanitary facilities within unit 4, extend the existing first floor within unit 4 to accommodate office space, and to carry out external alterations, which includes the installation of windows to existing external wall facade of unit no. 4.
Units No 4 & 5 Site No. 4 Wallingstown Little Island
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?