INCOMPLETED APPLICATION

Cork - Cork County Council

Proposed Development

The construction of a new single and two storey dwellinghouse, new vehicular entrance, septic tank and percolation area, new agricultural entrance and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Mar 2018

  2. Decision due

    9 May 2018

Application Details

Location
Greenfield Ballincollig Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
15 March 2018
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
9 May 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18/4904CONDITIONAL12 Apr 2018

Construction of a new single and two storey dwellinghouse, new vehicular entrance, septic tank and percolation area, new agricultural entrance, and all associated site works

Greenfield Ballincollig Co. Cork

5m
24/6305CONDITIONAL4 Dec 2024

Permission to erect a longhouse modular building for use as a home office, comprising two rooms and toilet, plus ancillary site works.

"The Burrows" Greenfield Ballincollig Co. Cork

84m
16/4918CONDITIONAL22 Apr 2016

Construct dwellinghouse including garage and associated site works

Greenfield Ballincollig Co. Cork

92m
10/8016WITHDRAWN21 Sept 2010

Two storey dwellinghouse with septic tank, percolation area and site works

Grenfield Ballincollig

215m
10/4928CONDITIONAL20 Apr 2010

Extension to dwelling & re-roofing of the existing dwelling

Lisheens Ovens

267m
18/5964CONDITIONAL26 Jul 2018

The construction of extension to dwelling and associated site works.

Lisheens Ovens Co. Cork

286m
21/6083REFUSED28 Jul 2021

The construction of the following: 1. Agricultural building for the storage of straw, agricultural machinery and ancillary dry goods 2. Agricultural building for straw bedded livestock housing and associated livestock crush facilities 3. Unroofed slatted slurry tank and unroofed manure store along with associated site works.

Kilnaglory Ovens Co. Cork

296m
05/3724CONDITIONAL30 May 2005

Erection of 25 m. high, free standing monopole communications structure, carrying antennae and communication dishes with associated ground mounted equipment cabins to share with other licensed operators within a 2.4 m. high palisade compound at ESB Ballincollig 38kV substation

Greenfield Ballincollig

300m
15/4301CONDITIONAL17 Feb 2015

Permission for the continued use of an existing 25 metre high free standing monopole communications structure carrying antennae and communication dishes to share with other licensed operators within an existing 2.4m high palisade compound

ESB Ballincollig 38kV Substation Greenfield Ballincollig Co.Cork

318m
22/5656CONDITIONAL15 Jul 2022

Intend to apply for 10 year planning permission. Underground electricity grid connection cabling, substation and ancillary site works. The development will comprise (1) a grid connection consisting of medium voltage cables and ducting in a excavated trench with a total length of c.1194 meters which will be installed on private land and public roads (L-2216 & L-22161); (2) control/switching substation consisting of either (i) single storey block building or (ii) 2 no. modular units; (3) cable beam over grange hill stream; (4) provision of ring main unit (RMU); (5) and all associated site development and reinstatement works. The proposed development includes minor revisions to the approved layout of the solar farm previously permitted under Cork County Council planning reference 18/5760 comprising omission of substation and satellite mast, and provision of the above referenced RMU, and the addition of a cable beam and underground cabling. The purpose of the proposed development is to connect the permitted solar farm under reference 18/5760 to the national grid at the existing Ballincollig 38Kv substation.

Kilnaglory Lisheens Greenfield Co.Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?