18/5760

CONDITIONAL

Cork - Cork County Council

Proposed Development

A solar farm consisting of circa 75,000 m2 of solar panels on ground mounted frames, 1 no. single storey substation, 6 no. single storey electrical inverter/transformer stations, battery storage module and associated equipment container, security fencing, satellite pole, CCTV, and all associated ancillary development works. Construction access will be via the existing entrance from the L-2216 to the north with operational access from the local country road to the east.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Jul 2018

  2. Decision: CONDITIONAL

    12 Mar 2019

  3. Decision due

    14 Mar 2019

Application Details

Location
Kilnaglory Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
5 July 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 March 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

78m
17/4864Conditional Permission12 Apr 2017

The importation of soil & stone, bricks, tiles, ceramics and concrete for the raising of an agricultural field in order to improve the agricultural output of the field.

Kilnaglory Ballincollig Cork

318m
19/7024REFUSED19 Dec 2019

The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field.

Kilnaglory Ballincollig Co. Cork

318m
20/6408REFUSED3 Nov 2020

The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field.

Kilnaglory Ballincollig Co. Cork

340m
22/5656CONDITIONAL15 Jul 2022

Intend to apply for 10 year planning permission. Underground electricity grid connection cabling, substation and ancillary site works. The development will comprise (1) a grid connection consisting of medium voltage cables and ducting in a excavated trench with a total length of c.1194 meters which will be installed on private land and public roads (L-2216 & L-22161); (2) control/switching substation consisting of either (i) single storey block building or (ii) 2 no. modular units; (3) cable beam over grange hill stream; (4) provision of ring main unit (RMU); (5) and all associated site development and reinstatement works. The proposed development includes minor revisions to the approved layout of the solar farm previously permitted under Cork County Council planning reference 18/5760 comprising omission of substation and satellite mast, and provision of the above referenced RMU, and the addition of a cable beam and underground cabling. The purpose of the proposed development is to connect the permitted solar farm under reference 18/5760 to the national grid at the existing Ballincollig 38Kv substation.

Kilnaglory Lisheens Greenfield Co.Cork

377m
21/6083REFUSED28 Jul 2021

The construction of the following: 1. Agricultural building for the storage of straw, agricultural machinery and ancillary dry goods 2. Agricultural building for straw bedded livestock housing and associated livestock crush facilities 3. Unroofed slatted slurry tank and unroofed manure store along with associated site works.

Kilnaglory Ovens Co. Cork

378m
13/6001INCOMPLETED APPLICATION21 Oct 2013

Retention of enclosed hardcore base for the purposes of storing bale silage and fertiliser, palisade fencing and earthen mounds, and permission for erection of palisade fencing, all with associated site works

Kilnaglory Ballincollig Co.Cork

378m
13/6236CONDITIONAL26 Nov 2013

Retention of enclosed hardcore base for the purposes of storing bale silage and fertiliser, palisade fencing and earthen mounds, and permission for erection of palisade fencing and all associated site works

Kilnaglory Ballincollig Co.Cork

382m
08/8046CONDITIONAL23 Jul 2008

Raising level of agricultural land with surplus construction materials i.e inert soil/rock and topsoil

Kilnaglory Ballincollig

385m
11/4348REFUSED23 Feb 2011

Retention of enclosed hardcore base for the purposes of storing bale silage and fertiliser, all with associated site works

Kilnaglory Ballincollig Co Cork

385m
11/4145INCOMPLETED APPLICATION31 Jan 2011

retention of enclosed hardcore base for the purposes of storing agricultural inputs