18/6042

INCOMPLETED APPLICATION

Cork - Cork County Council

Proposed Development

Foirgneamh Nua Storala a thogail chomaith le oibrithe coimhdeach Iaithreain, ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Folláin Teo. (New storage building with associated site works at site adjacent to the new Folláin Teo Food Processing Factory).

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Aug 2018

  2. Decision due

    26 Sept 2018

Application Details

Location
Eastat Gno Baile Mhuirne/Ballyvourney Industrial An Maigh Reidh, Baile Mhuirne/Flats, Ballyvourney Co. Chorcai/Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
2 August 2018
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
26 September 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18/6386CONDITIONAL7 Sept 2018

Foirgneamh nua storala a thogail chomaith le oibrithe coimhdeach laithreain, ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Folláin Teo. (New storage building with associated site works at site adjacent to the new Folláin Teo Food Processing Factory).

Eastat Gno Baile Mhuirne/Ballyvourney Industrial An Maigh Reidh, Baile Mhuirne/Flats, Ballyvourney Co. Chorcai/Co. Cork

54m
08/5575CONDITIONAL20 Mar 2008

Construction of single storey catalyst technology development laboratory with 3 no. external single storey storage buildings, continuation of existing estate roadway, construction of 2 no. site entrances, surface car parking, underground surface water attenuation tank and associated site works

Maigh Reidh Flats Ballyvourney

59m
17/5675INCOMPLETED APPLICATION3 Jul 2017

Permission for a 201.04KW Solar Photovoltaic (PV) array to be mounted on the roof top of the existing building at Ballyvourney Industrial Estate. The Solar PV array will generate on site green electricity which will be used to help reduce the company’s energy costs.

Ballyvourney Industrial Estate, Flats Ballyvourney Co.Cork

59m
17/5989INCOMPLETED APPLICATION1 Aug 2017

A 201.04kw solar photovoltaic PV array to be mounted on the roof top of the existing food manufacturing building. The solar PV array will generate on site green electricity which will be used to help reduce the company’s energy costs

Ballyvourney Indutrial Estate, Flats Flats, Ballyvourney Co. Cork

59m
17/6399INCOMPLETED APPLICATION18 Sept 2017

A 201.04kw Solar Photovoltaic (PV) array to be mounted on the roof top of the existing food manufacturing building. The Solar PV array will generate on site green electricity which will be used to help reduce the company’s energy costs. The PV modules will cover 1199.06sq.m of the Folláin Teo food manufacturing roof.

Ballyvourney Industrial Estate Ballyvourney, Flats Co. Cork

60m
03/2346CONDITIONAL19 May 2003

Meat wholesale and distribution facility and installation of enviropak sewage treatment plant

FLATS, FLATS,

64m
22/4665CONDITIONAL28 Mar 2022

Le framai cruach iarainn a thogail in aired ar an mba ualaigh ata suite laistiar den Monarcha Phroiseas Bidh le Follain Teo. (faoi Cead Pleanala 13/04748), chomaith le oibrithe coimhdeach laithreain. - To construct a steel framed enclosure over the existing loading bay area to the existing Folláin Teo food process facility (under Planning Permission 13/04748) inclusive of all ancillary site works.

Eastat Gno Baile Mhuirne An Maigh Reidh, Baile Mhuirne Ballyvourney Industrial Estate, Flats Ballyvourney, Co Cork

67m
19/6193CONDITIONAL5 Sept 2019

1) Cead Pleanala a fhail le foirgneamh storala breise le framai cruach iarainn a thogail mar mheadu achair ar an bhFoirgneamh Storala ata togtha cheana fein (faoi Cead Pleanala 18/06386), chomaith le oibrithe coimdeach laithreain ar shuiomh ata congarach do’n Mhonarcha Nua do Phroiseas Bidh le Follain Teo. 2) Cead Pleanala a fhail le paneil fotavoltach greine a chur ar dhionta an priomh Monarcha Phroiseas Bidh agus an Foirgneamh Storala. [1) Permission for construction of an additional steel framed storage building, thus extending the area of the existing storage building (granted under Planning Ref: No: 18/6386) as well as associated site works on the site close to the new Follain Teo food processing factory. 2) Permission to install a photovoltaic solar panel on the roof of the main food processing factory and the storage building].

Eastat Gno Baile Mhuirne/Ballyvourney Ind Estate An Maigh Reidh/Flats Baile Mhuirne/Ballyvourney Contae Chorcai/County Cork

72m
10/5678CONDITIONAL7 Jul 2010

Chun leathnu a dheanamh ar na boithre agus ar na seirbhisi ar eastait tionscail(extension of roads and services within the industrial estate).

Eastait Tionscail Udaras na Gaeltachta Flats Maigh Reidh Baile Bhuirne

89m
07/12586CONDITIONAL23 Nov 2007

Construction of commercial/industrial unit incorporating offices, manufacturing area, showrooms and storage areas, provision for parking, landscaping and ancillary site works

Site No.14 Ballyvourney Ind. Estate Flats Ballyvourney

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?