Proposed Development

Development consisting of 1. Revision of the western site boundary to that previously granted under PL17/221 with an overall increase in site area of 0.53HA 2. Erection of a prefabricated solvent storage shed adjacent to the northern site boundary 3. construction of 2Nr concrete bases and 2Nr waste compactor units to the western elevation of the new extension under construction 4. Carrying out all associated site development works deemed necessary as part of these works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Apr 2018

  2. Decision: CONDITIONAL

    21 May 2018

  3. Decision due

    28 May 2018

  4. Grant issued

    22 Jun 2018

Application Details

Location
Finisklin Business & Technology Park , Finisklin , Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
1.773 ha

Timeline

Registration Date
3 April 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 May 2018
Grant Date
22 June 2018
Permission Expires
21 June 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
2560153CONDITIONAL16 Apr 2025

To construct a 119.4sqm single storey extension to the northern elevation of existing structure to accommodate a new tool-room. To retain the construction of a pallet storage building which consists of a single storey steel shed type structure sited along the northern site boundary. All associated site development works deemed necessary.

Carbury Point , Finisklin Industrial Estate , Finisklin Sligo

3m
17221CONDITIONAL8 Jun 2017

(1) revision of existing site boundary with an overall increase in site area of 0.48HA to that granted under PL 15/267 (2) construction of an extension to the existing production area (to provide warehouse storage to ground floor only) & office areas on ground and first floor (3) construction of a ground floor canteen to include storage, prep & wash areas with an external waste storage area (single storey) to proposed western gable (4) construction of a fire sprinkler storage tank & intergrated pump house, electrical switch room, electrical meter room to serve the existing & proposed facility (5) construction of an additional car park area adjacent to the northern boundary (6) provision of external mechanical & electrical plant equipment to the northern & western elevations of the proposed extension to facilitate site services (7) provision of a second site entrance to loading docks/warehouse area with access from the western site boundary (8) carrying out of all associated site development works deemed necessary as part of the works

Finisklin Business & Technology Park , Finisklin , Sligo

122m
19117CONDITIONAL2 Apr 2019

Development consisting of a new Advance Office Building. Permission is sought for signage, new timber post-and-rail site boundaries, car parking, cycle shelter, bin store, landscaping, gas tanks, underground water storage tank, underground pumping station, ESB substation/switch room and all associated site works. A Natura Impact Assessment has been submitted to the Planning Authority with the Planning Application.

IDA Ireland Business & Technology Park , Finisklin , Sligo

140m
2360155CONDITIONAL27 Jun 2023

alterations and extensions to the existing an post Sligo Delivery Service Unit building to include for a new single storey temporary structure (10m x 30m x 5.5m tall) and temporary connecting link corridor (5m x 5m. x 5.5m tall) both located to the rear (northern) elevation of the existing building. The proposed temporary building would be in place for a period of between 7 to 10 years and consists of a hard shell marquee type structure with a double skinned pvc material, fully tensioned roof and all associated site development works

An Post Sligo Delivery Service Unit , Finisklin Business Park Finisklin Sligo , County Sligo

227m
22151CONDITIONAL4 May 2022

development consisting of a proposed two storey office building (gross floor area of 1774.4 m2), adjacent bike shelter (10.5 m2) and a car park comprising 224 parking spaces and all other associated site ancillary and infrastructure works including carpark lighting

Finisklin Business Park , Finisklin , Sligo

278m
19352CONDITIONAL27 Aug 2019

development consisting of the erection of a two storey extension to the rear of dwelling house

No. 5 Ivy Crescent , Brooklawns , First Sea Road

301m
21495CONDITIONAL15 Dec 2021

development consisting of an extension and alterations to existing factory to provide a warehouse and store. Floor area of proposed extensions: 466sqm. Permission is sought for associated site works at Good4U factory premises

Finisklin Business Park , Finisklin , Sligo

312m
2460162CONDITIONAL9 May 2024

for (1) the construction of a new single storey extension to the side and rear of my existing dwelling house which will be attached to the existing dwelling house and providing accommodation for a dependant relative (2) construction of a second single storey extension to the side and rear of my existing dwelling house (3) and all associated site works.

Sea View House First Sea Road Knappagh More Sligo F91N2X5 ,

335m
2660289N/A16 Jul 2026

• Conversion of attached domestic garage to habitable accommodation on the southern gable of the dwelling as constructed • Connections to existing site services as constructed

First Sea Road , Knappagh More , Co. Sligo

348m
18125CONDITIONAL19 Apr 2018

PP - for development consisting of partial conversion of attic space to living accomodation, construcion of a two storey extension to the rear of a two storey detached dwelling house and construct a 1.60m high natural stone wall and entrance gate.

Hermitage , First Sea Road , Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?