181017
CONDITIONALMayo - Mayo County Council
Proposed Development
CONSTRUCT A 4 BAY CALVING SHED, REPLACE EXISTING 4 BAY DOUBLE SHED OVER EXISTING SLATTED TANK WITH NEW 4 BAY DOUBLE ALONG WITH CUBICLE EXTENSION AND ALSO THE EXTENSION TO EXISTING COLLECTING YARD AND CONSTRUCTION OF A 2 BAY SLATTED UNDERGROUND SLURRY STORAGE TANK ALONG WITH ALL ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
18 Dec 2018
Decision: CONDITIONAL
14 Feb 2019
Decision due
20 Feb 2019
Grant issued
21 Mar 2019
Application Details
- Location
- MAGHERABRACK , KILLALA , CO. MAYO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
Timeline
- Registration Date
- 18 December 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 February 2019
- Grant Date
- 21 March 2019
- Permission Expires
- 20 March 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
FILLING OF LANDS WITH INERT WASTE FOR THE PURPOSE OF QUARRY RESTORATION, AND ALL ASSOCIATED ANCILLARY WORKS
MULLAFARRY , KILLALA , CO MAYO
CONSTRUCT AN ESB ELECTRICITY SUBSTATION WITH SWITCH ROOM BUILDING AND THE ERECTION AND OPERATION OF AN ASPHALT MIXING PLANT (HEIGHT 20M), AGGREGATE LOADING BINS, HOT STORAGE BINS AND ALL ASSOCIATED ANCILLARY WORKS ON 0.2 HECTARE AREA WITHIN THE EXISTING QUARRY COMPLEX
MULLAFARRY , KILLALA , CO. MAYO
1.0 HECTARE EXTENSION TO AN EXISTING AUTHORISED QUARRY AND WILL COMPRISE OF THE FOLLOWING: EXTRACTION OF MATERIAL BY BLASTING MEANS DOWN TO A LEVEL OF -2.0mOD; TRANSPORTATION OF EXTRACTED MATERIAL TO THE EXISTING QUARRY FOR PROCESSING; LANDSCAPING AND RESTORATION OF THE SITE UPON COMPLETION OF WORKS AND ALL ASSOCIATED ANCILLARY FACILITIES. THE APPLICANT IS SEEKING A 10 YEAR PERMISSION
MULLARRY & CLOONAWILLIN , KILLALA
The development will consist of an Inert Waste Recovery Facility within an application area of c. 1.8 Ha.
Mullafarry Townland , Killala , Co. Mayo
CONTINUED USE AND OPERATION OF THE EXISTING LIMESTONE QUARRY (C. 3.97 HA) INCLUDING WHEELWASH, SETTLEMENT LAGOONS, PORTABLE OFFICE, WORKSHOP AND ALL ASSOCIATED ANCILLARY ACTIVITIES, PERMITTED UNDER PLAN REG. REF. NO. 02/1931 AND 08/1563; INSTALLTION OF A PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER
MULLAFARRY TD , KILLALA
The application will consist of planning permission to (1) Demolish part of existing house and existing porch, (2) Demolish existing shed, (3) Construct extension and carry out alterations to existing dwelling house (4) Construct new Effluent Treatment System with all associated works, (5) Connect to all services, and (6) Carry out all required ancillary works on site.
Farragh , Killala , Co.Mayo
CONSTRUCT NEW CLUBHOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT AND PERCOLATION AREA INCLUDING ALL ANCILLARY SITE WORKS
RATHOWEN EAST , KILLALA , CO. MAYO
EXTEND AND RECONSTRUCT DWELLING HOUSE, CONSTRUCT DOMESTIC GARAGE, RETAIN MINOR ALTERATIONS TO INCLUDE GABLE WINDOW, RETAIN EXTENSION TO REAR OF DWELLING HOUSE
FARRAGH , KILLALA
RETAIN EXISTING DWELLING HOUSE AND DETACHED DOMESTIC SHED WITH REVISED SITE BOUNDARIES. PERMISSION TO UPGRADE EXISTING SEPTIC TANK SYSTEM TO INCLUDE NEW PROPRIETARY EFFLUENT TREATMENT UNIT AND PERCOLATION AREA INCLUDING ALL ANCILLARY SITE WORKS
FARRAGH , KILLALA
10 YEAR PLANNING PERMISSION FOR 5 TURBINE WIND FARM. PROPOSED DEVELOPMENT WILL BE LOCATED IN THE TOWNLANDS OF MAGHERABRACK, MULLAFARRY, TAWNAGHMORE LOWER, MEELICK AND TAWNAGHMORE UPPER, KILLALA APPROX 1.3KM SOUTH OF KILLALA. DEVELOPMENT IS AN UPDATED APPLICATION TO THE CONSENTED 6 TURBINE WIND FARM P09/780. PROPOSAL IS FOR A WIND ENERGY DEVELOPMENT COMPRISING 5 ELECTRICITY GENERATING WIND TURBINES, EACH WITH A ROTOR DIAMETER NOT EXCEEDING 103.2M A HUB HEIGHT NOT EXCEEDING 73.5M AND A BLADE TIP HEIGHT OF NOT EXCEEDING 126M. THE DEVELOPMENT WILL INCLUDE A METEOROLOGICAL MAST NOT EXCEED 82M IN HEIGHT, INTERNAL UNDERGROUND ELECTRICAL CABLING, A SUBSTATION BUILDING, AN EXTERNAL UNDERGROUND GRID CONNECTION CABLE AND DUCTING TO THE EXISTING 110KV TAWNAGHMORE SUBSTATION, ASSOCIATED GRID SUBSTATION WORKS, ASSOCIATED SITE ACCESS ROADS AND ANCILLARY SITE WORKS INCLUDING UPGRADES TO EXISTING SITE ACCESS, A TEMPORARY CONSTRUCTION COMPOUND AND HAULAGE ROUTE WORKS. THE MAX OUTPUT CAPACITY OF THE WIND FARM WILL BE UP TO 18MW AND HAS AN INTENDED OPERATION LIFE OF 25 YEARS
MAGHERABRACK/MULLAFARRY , TAWNAGHMORE LOWER/UPPER , MEELICK/KILLALA