The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

1813

N/A

Carlow - Carlow County Council

Proposed Development

Ten year planning permission for the development of an up to 100MW Battery Energy Storage Facility that will provide energy services to the national grid. The development will consist of construction and operation of up to 34 metal containers to store up to a project total of up to 100MW (13.2 tons of Lithium Ion) sealed battery cells each with entrances, fire suppression systems, Heating Ventilation and Air Conditioning systems, Inverters, control systems, other electrical components, security lighting and ancillary grid infrastructure and all associated works including security fencing, landscaping and ancillary grid infrastructure on lands at Kellistown East, County Carlow. The planning application is accompanied by an Environmental Report and Stage 1 Screening for Appropriate Assessment.

View the full application file on the council's planning portal →

Application Details

Location
Kellsitown East , Co.Carlow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council

Timeline

Registration Date
18 January 2018
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
1823CONDITIONAL1 Feb 2018

Ten year planning permission for the development of an up to 100MW Battery Energy Storage Facility that will provide energy services to national grid. The development will consist of construction and operation of up to 34 metal containers to store up to a project total of up to 100MW (13.2 tons of Lithium lon) sealed battery cells each with entrances, fire supression systems, Heating Ventilation and Air Conditioning systems, Inverters, control systems, other electrical components, security lighting and ancillary infrastructure and all associated works including security fencing and ancillary grid infrastructure on lands at Kellistown East, County Carlow.

Kellistown East , Co. Carlow.

192m
18256N/A2 Jul 2018

the restoration, part demolition and extension to the rear of an existing house, along with the installation of a new sewerage treatment system, percolation area and all associated site and landscaping works

Rathtoe , Co. Carlow

192m
18296CONDITIONAL26 Jul 2018

the restoration, part demolition and extension to the rear of an existing house, along with the installation of a new sewage treatment system, percolation area and all associated site and landscaping works

Rathtoe , Co. Carlow

192m
23129REFUSED28 Jul 2023

PL18-296 for the restoration, part demolition and extension to the rear of an existing house, along with the installation of a new sewage treatment sewage, percolation area and all associated site and landscaping works

Rathoe , Co. Carlow

212m
21389N/A13 Oct 2021

Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining ESB Kellistown Electricity Substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c 540 sqm. c 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c 160 sqm. c 3m high) 6 No. modular containers to house electrical and control equipment (total area of c 195 sq m c 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit c 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (SESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999.

Kellistown East , County Carlow

217m
21445CONDITIONAL17 Nov 2021

Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining ESB Kellistown Electricity Substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c. 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm. c. 3m high) 6 No. modular containers to house electrical and control equipment (total area of c. 195 sq m c. 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999

Kellistown East , Co. Carlow

398m
2460223CONDITIONAL30 Jul 2024

of 110kV underground electricity cabling and all associated ancillary site development works. The proposed development of the underground electricity cabling will comprise 3 No. power cable ducts, 2 No. communications ducts and 1 no. earth continuity duct of c.43 metres in length which is to be installed in an excavated trench. The cabling will extend from and connect with permitted 110kV underground electricity cabling (under An Bord Pleanála reference ABP-313139-22) on the L30535 public road to a line bay in the Kellis 220kV substation

in the townland of Kellistown East , County Carlow

413m
2560355CONDITIONAL10 Nov 2025

the construction of shed / store used for domestic purposes and storing of vintage vehicles, and all associated site works

Kellistown , Tinryland , Carlow

536m
2560189CONDITIONAL2 Jul 2025

to construct a two-storey dwelling, appropriate waste water treatment system and associated percolation area, new entrance off existing laneway, bored well, 6 no. stables with associated tack and feeding room, hard standing area and all ancillary site works and landscaping

Ballycurragh Stud , Ballycurragh , Rathoe Tullow

819m
2660049CONDITIONAL18 Feb 2026

alterations to previously approved planning reference 25/60008 (single storey extension to provide additional accommodation to our existing Childcare Facility). The alterations consist of a revised extension layout to include revised elevations, reduced extension floor area, internal alterations to the existing building and all associated site works

Rathoe Community Childcare , Rathoe , Co. Carlow

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?