The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

181411

CONDITIONAL

Galway - Galway County Council

Proposed Development

to install floodlights, a 5m high hurling wall, 427.50 sqm. astro turf pitch and fencing

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Oct 2018

  2. Decision: CONDITIONAL

    28 Nov 2018

  3. Decision due

    3 Dec 2018

  4. Grant issued

    7 Jan 2019

Application Details

Location
Alloon ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
2.4 ha

Timeline

Registration Date
9 October 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 November 2018
Grant Date
7 January 2019
Permission Expires
6 January 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18663CONDITIONAL22 May 2018

for a footpath internally along the periphery of the Club Grounds.

Alloon ,

1m
213CONDITIONAL5 Jan 2021

to install a Ball Stop Net 12m high and 23.6m long.

Alloonbaun ,

207m
171192CONDITIONAL4 Aug 2017

for a sheep shed and ancillary concrete work. Gross floor space of proposed works 304sqm.

Alloonbaun Td ,

209m
181215CONDITIONAL28 Aug 2018

to construct a new dwelling house , effluent treatment system, garage and all associated site works. Gross floor space of proposed works, dwelling 249sqm, garage, 55sqm.

Alloon Lower ,

347m
17856CONDITIONAL13 Jun 2017

to construct a canopy to provide shelter above classroom entrance/exits, and to erect the school name on the external west-facing wall (gross floor space 138sqm)

Alloonbaun ,

347m
19509UNCONDITIONAL5 Apr 2019

to extend existing car parking area to include all associated signs and works (Gross floor space 272.25sqm). Previous Planning Ref: 13/780

Alloon Baun , Ballymacward , Ballinasloe

412m
2046CONDITIONAL20 Jan 2020

to change existing carparking facilities at the front of the school to include 1. Separate designated drop off and pick up areas for school buses and cars, 2. Visitor and teacher parking, 3. Construction of a wall to separate drop off and pick up area from the main road, 4. Construction of a new front boundary wall, 5. Construction of a new footpath, lighting and all associated site works. Gross floor space of proposed works: 1015 sqm

Alloonbaun ,

419m
19995CONDITIONAL28 Jun 2019

consisting of a three-bedroom dwelling, comprising of a kitchen & dining room, living room, playroom, bathroom, home office and utility/ storage areas, closure of existing agricultural entrance, new site entrance from road, new waste water treatment system, domestic garage and ancillary works. Gross floor space of proposed works: House - 266 sqm, Garage - 61 sqm

Alloonbaun ,

501m
20161CONDITIONAL11 Feb 2020

of dwelling house, domestic garage / fuel store all services and all associated site works on revised site boundaries. Gross floor of space of work to be retained: 206.93 sqm (House = 155.26 sqm. Garage = 51.67 sqm)

Alloon Lower ,

502m
191300CONDITIONAL22 Aug 2019

of domestic garage / fuel store and all associated site works. Gross floor space of work to be retained: 51.67 sqm

Alloon Lower ,

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?