The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

181470

N/A

Galway - Galway County Council

Proposed Development

to demolish existing agricultural sheds and to construct an agricultural barn which will be used for the purpose of fodder storage and the storage of agriculture related material. Gross floor space of proposed works: 246.5 sqm. Gross floor space of any demolition: 48.5 sqm. (agricultural)

View the full application file on the council's planning portal →

Application Details

Location
Middle quarter Inishbofin ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
0.06 ha

Timeline

Registration Date
17 October 2018
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18421REFUSED9 Apr 2018

to construct an agricultural barn. Gross floor space of proposed works 246.5 sqm.

Middlequarter ,

0m
20221CONDITIONAL21 Feb 2020

to demolish existing agricultural sheds and to construct an agricultural barn which will be used for the purpose of fodder storage and the storage of agriculture related materials. A Natura Impact Statement will be lodged with this application. Gross floor space of proposed works: 228.50 sqm. Gross floor space of any demolition: 48.50 sqm (Agricultural)

Middlequarter ,

269m
2460409CONDITIONAL16 Apr 2024

for: 1. Renovations and extension to existing cottage, 2. New onsite sewage treatment plant, percolation area and all associated works, 3. A Natura Impact Statement (NIS) has also been included with the application. Gross floor space of proposed works: 40 sqm

Middle Quarter , Inisboffin , Co. Galway

362m
23478CONDITIONAL11 Dec 2023

for change of use from store/garage on the ground floor to community shop

Middlequarter , Inishbofin , Co. Galway

446m
2461508REFUSED8 Nov 2024

for the installation of a 18-metre high lattice structure supporting 1 no. radio-link dish, a ground-level dual bay cabinet, palisade fence and gate, fibre chamber, concrete plinth and white stone compound ground finish. The development is required to carry the broadband data from the new high speed fibre broadband network on the island, to the mainland by radio link, to connect to the NBI national fibre network, as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed. A natura Impact Statement (NIS) has been prepared and submitted in support of this application

Middlequarter , Inishbofin Island , Co. Galway

474m
2660870N/A29 May 2026

for the erection of an 18m telecommunications structure supporting 4 no. receiving dishes, dual bay cabinet on concrete plinth, palisade fence with access gate, concrete plinth, fibre chamber, stone compound ground finish, replacement of existing gate with farm gate and hanging post and all ancillary development works thereto. The development is required to carry the broadband data from the new high speed fibre broadband network on the Island to the mainland by radio link to connect to the NBI national fibre network as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the Islands, at the same data speed. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application

Middlequarter , Lands at Galway County Council Sheep Dipping Lands , Inishbofin Co. Galway

504m
2560295CONDITIONAL20 Mar 2025

for the construction of a dwelling house, secondary wastewater treatment unit and soil polishing filter, together with associated site works. This application will be accompanied by a Natura Impact Statement (NIS) and a Construction Environmental Management Plan (CEMP). Gross floor space of proposed works: 144 sqm(H)

MIddlequarter , Inishbofin , Co. Galway

504m
2461391REFUSED21 Oct 2024

for the construction of a dwelling house, secondary wastewater treatment unit and soil polishing filter, together with associated site works.This application will be accompanied by a Natural Impact Statement (NIS) and a Construction Environmental Management Plan (CEMP). Gross floor space of proposed works: 144.00 sqm

Middlequarter , Inishbofin , Co. Galway

511m
171440CONDITIONAL3 Oct 2017

for: Renovation and change of use of existing out-houses to form a shop selling artisan food products and associated food related products. Works to include removal of existing asbestos corrugated roof and replacement with new corrugated roof and associated roof lights; new internal roof support structure and associated insulation, new internal layout and the creation of a new entrance to the north of the out-houses and forming new window to the east elevation. Existing access, wastewater and water supply services will be utilized. Gross floor space of proposed works 50sqm. Gross floor space of work to be retained 53sqm.

Middle Quarter ,

526m
181814UNCONDITIONAL17 Dec 2018

for renovation of existing house to include demolition of rear extension and replacement with new single storey kitchen/bathroom extension. New two storey educational/cultural building to the west of the existing house with manager's accommodation at first floor and finished in timber cladding, render and stone with a metal clad roof. Associated small scale accommodation building to the north of the existing house containing two en-suite bedrooms finished in render and timber cladding with a slate roof with solar thermal panels. Wastewater is to be treated on site through constructed wetlands and settlement tank. New pedestrian access is proposed to the west of the existing access with bicycle parking and notice board. A phased build programme is proposed with the erection of the two-storey educational/cultural building as phase one. (Gorss floor area proposed 263sqm). Previous Planning Reference No. 14/665

Middlequarter ,

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?