1814
CONDITIONALCavan - Cavan County Council
Proposed Development
to convert former Guild Hall to 2 no. two storey, 2 no. bed, residential units, connections to foul & surface water sewers and all ancillary works (The works are to be carried out to protected structure; RPS No. CV17006)
View the full application file on the council's planning portal →Application Timeline
Application received
3 Jan 2018
Decision: CONDITIONAL
26 Feb 2018
Decision due
27 Feb 2018
Grant issued
16 Apr 2018
Application Details
- Location
- The Guild Hall , The Pig Market , Cootehill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cavan County Council
- Floor Area
- 182 sq m
- Residential Units
- 2
Timeline
- Registration Date
- 3 January 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 26 February 2018
- Grant Date
- 16 April 2018
- Permission Expires
- 15 April 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for alterations to previously approved planning (Ref 18/14) to include alterations to elevations. (The works are to be carried out to protected structure; RPS No. CV17006)
The Guild Hall , The Pig Market , Cootehill
for alterations to previously approved planning (Ref: 18/14) to include alterations to elevations. (The works are to be carried out to protected structure, RPS No. CV17006)
The Guild Hall , The Pig Market , Cootehill
for (1) Demolition of the existing single storey mono pitched roof shed structure attached to the rear of the existing house (2) Remove pitched roof over existing rear projection, increase height of external walls of rear projection with new pitched roof over (3) Two storey rear extension to existing rear projection (4) Internal alterations to the existing house and all necessary ancillary site development works to facilitate this development
34 Bridge Street , Cootehill , Co. Cavan
for (1) Demolition of the existing single storey mono pitched roof shed structure attached to the rear of the existing house (2) Remove pitched roof over existing rear projection, increase height of external walls of rear projection with new pitched roof over (3) Two storey rear extension to existing rear projection (4) Internal alterations to the existing house and all necessary ancillary site development works to facilitate this development
34 Bridge Street , Cootehill , Co. Cavan
EXTENSION OF TIME OF 14/129 to relocate ESB substation/switch room and to erect single storey extensions to front and to rear of existing Arro Store, to erect single storey extensions to rear and side of Supervalu store and all associated site works
52-54 Market Street , Cootehill , Co. Cavan
to retain and complete relocation of ESB substation/switch room and all associated site works
50 52 & 54 Market Street , Cootehill , Co Cavan
to construct a new single storey flat roof bakery/Prep/Store/Refrigeration room to the rear yard, a new single storey toilet block to the rear yard, the renovation of existing garage to a dry food store & outdoor seating area to the front of the yard, renovation works to the ground floor of the existing rear buildings of the shop as an indoor seating/Café/Public House/Wine areas, connection to existing main storm and foul sewer together with all ancillary site development works
No. 14 Bridge Street , Cootehill , Co. Cavan
for change of use of existing single storey building from storage use to a bakery to be used in conjunction with existing delicatessen premises together with all ancillary site development works
No. 14 Bridge Street , Cootehill , Co. Cavan
for change of use of existing single storey building from storage use to a home bakery to be used in conjunction with existing delicatessen premises together with all ancillary site development works
No. 14 Bridge Street , Cootehill , Co. Cavan
to reinstate previously demolished buildings to rear yard of commercial premises as ancillary storage use with a new disabled accessible WC
No 14 Bridge Street , Cootehill , Co. Cavan
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?