The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

18161

N/A

Offaly - Offaly County Council

Proposed Development

AN EXTENSION TO A PROTECTED STRUCTURE, COMPRISING AN ACCESSIBLE SHOWER-ROOM, THE RELOCATION OF THE BACK DOOR, ENLARGEMENT OF EAST GABLE PATIO-DOOR AND ADDITION OF VELUX WINDOWS TO 20TH CENTURY SIDE EXTENSION, THERMAL UPGRADES AND SUNDRY INTERNAL ALTERATIONS

View the full application file on the council's planning portal →

Application Details

Location
WOODFIELD (CURRAGHBOY) , CLARA , CO OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council

Timeline

Registration Date
10 April 2018
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
18201CONDITIONAL4 May 2018

AN EXTENSION TO PROTECTED STRUCTURE, COMPRISING PROVISION OF ACCESSIBLE SHOWER-ROOM, RELOCATION OF BACK DOOR, ENLARGEMENT OF EAST GABLE PATIO-DOOR AND ADDITION OF VELUX WINDOWS TO 20TH CENTURY SIDE EXTENSION, THERMAL UPGRADE AND SUNDRY INTERNAL ALTERATIONS

WOODFIELD HOUSE , WOODFIELD (CURRAGHBOY) , CLARA CO OFFALY

284m
2360054CONDITIONAL8 Aug 2023

Construction of an extension to the north & west of existing dwelling. The application will also include the renovation of existing derelict dwelling, new biofilter treatment system to replace existing septic tank all associated site works and drainage

Curraghboy/Woodfield , Clara , Co. Offaly

513m
18305N/A16 Jul 2018

CONSTRUCTION OF AN EXTENSION. THE PROPOSED EXTENSION IS TO THE SOUTH AND WEST GABLE OF THE EXISTING DWELLING. THE APPLICATION WILL ALSO INCLUDE A RE-POSITIONING OF THE EXISTING REAR BOUNDARY AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE

CURRAGHBOY , WOODFIELD , CLARA CO OFFALY

514m
18286N/A3 Jul 2018

CONSTRUCTION OF AN EXTENSION. THE PROPOSED EXTENSION IS TO THE SOUTH GABLE OF EXISTING DWELLING. THE APPLICATION WILL ALSO INCLUDE A RE-POSITIONING OF THE EXISTING REAR BOUNDARY AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE

CURRAGHBOY , WOODFIELD CLARA , CO OFFALY

546m
20468CONDITIONAL30 Sept 2020

A PROPOSED NEW SINGLE STOREY DWELLING, GARAGE, DRIVEWAY, NEW CONNECTION TO LOCAL AUTHORITIES' PUBLIC WATER MAIN, NEW VEHICULAR ENTRANCE, WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA, STORMWATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKS & LANDSCAPING

WOODFIELD , CLARA , CO. OFFALY

556m
2245CONDITIONAL9 Feb 2022

CONSTRUCTION OF A NEW FOUR BEDROOM DWELLING HOUSE, NEW EFFLUENT TREATMENT SYSTEM, NEW GARAGE, NEW VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

WOODFIELD , CLARA , CO. OFFALY

582m
2560593N/A26 Nov 2025

development at this site of approximately 11 hectares located in the Townland of Curraghboy or Woodfield, Clara, Co. Offaly. The development will consist of: • 4 no. playing pitches (Pitch 1 and 2: synthetic all-weather playing pitches with floodlighting, and Pitch 3 and 4: grass playing pitches); • 1 no. grass training/warm-up pitch; • A single level facilities building (approximately 865 sq m gross floor space) with rooftop photovoltaic solar panel array (224 sq m) and associated building signage (4.5 sq m), to incl. entrance lobby, function room with servery and reception area, office/meeting room, weight/training room, multipurpose community room, medical/first aid room with toilet, equipment store, 5 no. spectator toilets (3 no. universal accessible), circulation corridor, universal access toilet, universal access change room with shower and toilet, plant room, storage/kit room, 2 no. referee facilities with shower and toilet, 2 no. change rooms with showers and toilets, and 6 no. change rooms with toilets; • 123 no. vehicle parking spaces arranged in 2 no. car parking areas with site lighting (12 no. EV, 6 no. disabled, 105 no. regular), dedicated vehicle set down area, dedicated coach/bus set down area, and coach/bus parking area; and• Hard and soft landscaping (incl. enhanced boundary treatment planting and ecological buffer biodiversity corridors), access road and vehicle circulation, pedestrian walkways, site lighting, services (incl. tertiary waste water treatment system comprising of proprietary secondary wastewater treatment plant with pumped discharged to raised tertiary treatment modules polishing filter bed, and SuDS based surface water management system comprising permeable paving, grasscrete, a series of stormwater bioretention swales/detention basins located on the site, hydrocarbon interceptor, flow control hydrobrake controlled outflow discharge to drainage ditch within site, and ultimately the Gageborough River), and all other ancillary and associated site development works above and below ground level. Access will be via a new vehicular entrance from the L6045 Local Road with associated road upgrade works to accommodate development related traffic movements

Townland of Curraghboy , or Woodfield , Clara Co. Offaly

582m
2560615REFUSED3 Dec 2025

• 4 no. playing pitches (Pitch 1 and 2: synthetic all-weather playing pitches with floodlighting, and Pitch 3 and 4: grass playing pitches); • 1 no. grass training/warm-up pitch;• A single level facilities building (approximately 865 sq m gross floor space) with rooftop photovoltaic solar panel array (224 sq m) and associated building signage (4.5 sq m), to incl. entrance lobby, function room with servery and reception area, office/meeting room, weight/training room, multipurpose community room, medical/first aid room with toilet, equipment store, 5 no. spectator toilets (3 no. universal accessible), circulation corridor, universal access toilet, universal access change room with shower and toilet, plant room, storage/kit room, 2 no. referee facilities with shower and toilet, 2 no. change rooms with showers and toilets, and 6 no. change rooms with toilets; • 123 no. vehicle parking spaces arranged in 2 no. car parking areas with site lighting (12 no. EV, 6 no. disabled, 105 no. regular), dedicated vehicle set down area, dedicated coach/bus set down area, and coach/bus parking area; and • Hard and soft landscaping (incl. enhanced boundary treatment planting and ecological buffer biodiversity corridors), access road and vehicle circulation, pedestrian walkways, site lighting, services (incl. tertiary waste water treatment system comprising of proprietary secondary wastewater treatment plant with pumped discharged to raised tertiary treatment modules polishing filter bed, and SuDS based surface water management system comprising permeable paving, grasscrete, a series of stormwater bioretention swales/detention basins located on the site, hydrocarbon interceptor, flow control hydrobrake controlled outflow discharge to drainage ditch within site, and ultimately the Gageborough River), and all other ancillary and associated site development works above and below ground level. Access will be via a new vehicular entrance from the L6045 Local Road with associated road upgrade works to accommodate development related traffic movements at this site of approximately 11 hectares

Townland of Curraghboy , or Woodfield , Clara Co. Offaly

584m
22555CONDITIONAL26 Oct 2022

A PROPOSED NEW SINGLE STOREY DWELLING, NEW VEHICULAR ENTRANCE, DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKS

WOODFIELD , CLARA , CO. OFFALY

826m
18525CONDITIONAL26 Nov 2018

CONSTRUCTION OF A NEW THREE BEDROOM ONE-STOREY DWELLING HOUSE, NEW EFFLUENT TREATMENT SYSTEM, NEW GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

WOODFIELD , CLARA , COUNTY OFFALY

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?