construct a slatted shed with feeding area and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Apr 2018

  2. Further information requested

    17 May 2018

  3. Further information received

    29 May 2018

  4. Decision: CONDITIONAL

    13 Jun 2018

  5. Decision due

    25 Jun 2018

  6. Grant issued

    18 Jul 2018

Application Details

Location
Ballycarnan , Portlaoise , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
0.92 ha

Timeline

Registration Date
3 April 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 June 2018
Grant Date
18 July 2018
Permission Expires
17 July 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

489m
18648CONDITIONAL25 Oct 2018

construct two storey dwellinghouse, garage, entrance, septic tank with percolation area and all associated site works

Ballycarnan , Portlaoise , Co. Laois

665m
18686CONDITIONAL13 Nov 2018

demolish part of existing cottage and construct extension to same

Capoley Lane , Capoley , Portlaoise

665m
2360489CONDITIONAL16 Nov 2023

demolish remaining existing cottage and extend to previous extension granted under 18686 and all associated works

Capoley Lane , Capoley , Portlaoise

742m
2560291REFUSED14 May 2025

The development to be retained consists of (i) 2no. high level ‘Maldron Hotel’ and ‘Midway’ signs affixed to the eastern elevation and (ii) 1no. high level ‘Midway’ sign affixed to the southern elevation. The proposed development will consist of the replacement of these existing signs with the erection of new signs and all other associated site development works. Sign 1A (13.93m x 1m) is a high-level sign to replace existing ‘Midway’ sign on the southern elevation. A new Sign 1B (4.8 x 1.1m) is also proposed on the southern elevation. Sign 2A (5.3m x 1.4m) is a high-level sign to replace existing ‘Maldron Hotel’ sign on the eastern elevation. Sign 2B (8.6m x 1.6m) is a high-level sign to replace existing ‘Midway’ sign on the eastern elevation. Sign 2C (2.2m x 2.2m) comprises of 4no. square panel signs below existing high-level signs on the eastern elevation of the hotel. All signage is to be internally illuminated by means of white LEDs.

Maldron Hotel , Meelick Portlaoise , Co. Laois

771m
2660214N/A16 Apr 2026

construct 2-bedroom, single storey dwelling, with 2no. rooflights and solar pv panels, together with new wastewater treatment system and polishing filter, new vehicular entrance, boundary modifications and all associated site works.

Togher , Portlaoise , Co Laois

771m
2460399CONDITIONAL4 Jul 2024

erect a Main ID sign (or totem sign) measuring 13m high. It has a triangular plan with each of the three facades measuring 4m wide. The sign will contain logos and advertising. All associated site works.

Junction 17 Midway , Portlaoise , Co. Laois

797m
17529N/A29 Sept 2017

construct a new filling station consisting of ; (1) Retail unit adjoining existing foodcourt (240.5 sq.m gfa) with net retail area of 88.23sq.m (including 0.88 sq.m) back of house area of 62.5sq.m and circulation area of 89.79sq.m (including new glazed lobby to facilitate access to and from the foodcourt. The building will measure 8.86m at heightist point. The building will contain 3 no. signs on the facade. (2) 4 no. pump islands with branded canopy over (signage to 3 no. sides). (3) Access road for deliveries to hotel and foodcourt. (4) Vehicular entrance ane egress point. (5) Replacement totem sign at entrance (9.5m high). (6) All associated site works including hard and soft landscaping, car parking, cycle stands, refuelling point, vents and underground tank farm. For clarity, no HGV fuel or HGV parking facilities are provided as part of this application

Within and immediate north of Mid Way Toghers , Portlaoise , Co. Laois

797m
17538CONDITIONAL4 Oct 2017

construct a new filling station consisting of ; (1) Retail unit adjoining existing foodcourt (240.5 sq.m gfa) with net retail area of 88.23sq.m (including 0.88 sq.m) back of house area of 62.5sq.m and circulation area of 89.79sq.m (including new glazed lobby to facilitate access to and from the foodcourt and internal connections). The building will measure 8.86m at heightist point. The building will contain 3 no. signs on the facade. (2) 4 no. pump islands with branded canopy over (signage to 3 no. sides). (3) New Access road for deliveries to hotel and foodcourt. (4) New Vehicular entrance ane egress point. (5) Replacement totem sign at entrance (9.5m high) to Midway (adjoining Abbeyleix Road). (6) All associated site works including hard and soft landscaping, car boundary treatment, car parking, cycle stands, refuelling point, vents and underground tank farm. For clarity, no HGV fuel or HGV parking facilities are provided as part of this application

Within and immediate north of Mid Way Toghers , Portlaoise , Co. Laois

824m
17602CONDITIONAL14 Nov 2017

construct proposed conversion of a bungalow to two storey dwelling house and constructiuon of a single storey extension to the rear and associated site works

Cappoley , Portlaoise , Co. Laois

864m
22364CONDITIONAL13 Jun 2022

retain a revised site position to the dwelling house, two previous extensions to the rear of the house and removal of timber façade from the previously approved planning permission. Retention permission is also sought for a redesigned and repositioned detached garage

Meelick , Portlaoise , Co.Laois

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?