18263
CONDITIONALGalway - Galway City Council
Proposed Development
Permission to retain use of a building as ecclesiastical use to include a place of Christian worship with ancillary administration, meeting and study rooms
View the full application file on the council's planning portal →Application Timeline
Application received
14 Aug 2018
Decision: CONDITIONAL
5 Oct 2018
Decision due
8 Oct 2018
Grant issued
8 Nov 2018
Application Details
- Location
- IDA Small Business Park , Tuam Road , Galway
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Galway City Council
- Site Area
- 0.131 ha
Timeline
- Registration Date
- 14 August 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 5 October 2018
- Grant Date
- 8 November 2018
- Permission Expires
- 7 November 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for development which will consist of an extension of 320sq.m to the previously granted office mezzanine floor area of 848 sq.m (granted under planning ref: 18/318)
IDA Small Business Centre , Tuam Road , Galway H91 VW84
Permission for modifications to a previously permitted (Pl. Ref. No. 07/268) two - storey over- basement mixed-use development. The development will consist of (a) change of use at ground floor level of 1,136 sq. m from bulky goods retail use to office use (b) change of use at first floor level of 391 sq. m from restaurant use to office use: (c) installation of new mezzanine level of 848sq. m for office use: (d) erection of external back lift signage to front (northwest) façade; (e) alterations to rear (southeast) elevation; (f) replacement of two basement car parking spaces with an end-of-journey cyclist changing/shower room; and all associated site works
IDA Small Business Park , Tuam Road , Galway
Permission for development which consists of: Extension Of Duration - the development comprises 4 no. apartment block G,H,H1 and J (including basement carpark and retail/ancillary accommodation in Block J_ are fully structurally complete to roof level. External cladding and fenestration are under way as is the internal completion of apartments. Completion is being planned in 4 no. block by block phases with final development completion planned in December 2023. Planning reference ABP 310348-21.
Crown Square , Monivea Road , Galway
Permission for (a) change of use of an existing medical practice waiting room to a pharmacy (b) a single storey, front entrance lobby, extension to the existing building to serve the proposed pharmacy (c) all associated elevation changes and (d) all associated works
Galway Primary Care , Harmack House , Industrial Development Agency Small Business Centre
Permission for development which consists of change of use of ground floor office unit to pharmacy
Unit 1 Harris House , IDA Small Business Centre , Tuam Road
Permission for development which consists of the change of use of ground floor office unit to pharmacy, new entrance to pharmacy unit and erection of signage and pharmacy cross
Unit 1 Harris House , IDA Small Business Centre , Tuam Road Galway
Permission for development which consists of retention and completion of car parking at Galway Primary Care Centre, Unit 1 IDA Small Business Park, Galway.
Galway Primary Care Centre , Unit 1 IDA Small Business Park , Galway
Permission for development which will consist of retention, completion, and alterations to existing car park and grassed area. The proposed works will consist of 1. The formal completion of the recently gravelled, developed into a formal macadam surfaced and fully lined-out and signage marked surface car park integrated with the existing perpendicular car parking spaces. The total proposed provision will be to accommodate 22 car parking spaces. 2. Within the proposed provision of 22 car parking spaces; 2no. EV charging spaces will be assigned; 2no parent and child car parking spaces will be assigned and 1no Disabled space will be assigned. 3. Modifications to the existing surface car park area, will include the setting out of the new kerb lines and associated line marking, ramp access at kerb. Modifications to existing and additional hard and soft landscaping provisions to the site, including 10no cycle parking spaces which will be provided adjacent to the existing building at pavement surface level. 4. Modifications and connection to all other associated site services as necessary. 5. Removal of existing free-standing advertising structure.
Galway Primary Care Centre , Unit 1 , IDA Small Business park
Permission for the development which will consist of (a) construction of a single storey pharmacy retail unit (b) installation of a temporary modular MRI building unit to be contained in an enclosure (c) additional car parking spaces and (d) all associated building works and site works
Galway Primary Care , Harrmack House , Industrial Development Agency Small Business Centre
Permission for development which consists of: Permission is being sought by Brian Higgins Medical Limited for the following at Harris House, IDA Business Centre, Tuam Road, Galway; the change of use of an existing ground floor, first floor and second floor from office use to a medical centre. The proposed works will include internal alterations at ground floor level to create a new reception area, changes to the layout at second floor level to provide treatment rooms and consultation rooms, alterations to the front north west elevation including replacement of existing doors with windows and all ancillary and associated works
Harris House , IDA Small Business Centre , Tuam Road Galway
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?