18275
CONDITIONALLimerick - Limerick County Council
Proposed Development
construction of a new vehicle entrance, including piers, gates, driveway hardstanding and all ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
23 Mar 2018
Decision: CONDITIONAL
16 May 2018
Decision due
17 May 2018
Grant issued
20 Jun 2018
Application Details
- Location
- "Sruth Lan" , South Circular Road , Limerick.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 23 March 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 16 May 2018
- Grant Date
- 20 June 2018
- Permission Expires
- 19 June 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a first floor bathroom extension to the rear of the existing dwellinghouse and permission to replace the existing slate roof with a new natural slate roof on the main dwellinghouse
Loretto , South Circular Road , Limerick
the demolition of the 2-storey extension to the rear of the original dwelling, the construction of a new 2-storey extension to the rear along with provision of a sunroom to the rear, the demolition of extension to the outbuilding to the rear of the property, and all other site works required above and below ground
Inisfree , South Circular Road , Limerick
the widening of the existing shared driveway vehicular entrance, including new pier, gate, driveway hardstanding and all ancillary site works
"Dun Mhuire" , South Circular Road , Limerick
the demolition of detached garage and outbuilding to rear of dwelling and planning permission for the construction of a single storey extension to rear of dwelling with elevational alterations to the rear and side, and the construction of a new outbuilding to rear of dwelling and the widening of existing vehicular entrance and the relocation of existing pedestrian entrance with all ancillary site works
Willowdale , South Circular Road , Limerick
the construction of a new single storey extension of 607sqm; incorporating a special educational needs unit to the south of Scoil Mháthair Dé of +4.8m in height to all monopitch ridges with external render to external walls and metal roofing covering to monopitch roofs incorporating 2 No. special educational needs classrooms including accessible toilets, 2 No. quiet spaces, multi-activity room, daily living skills room, central activity space, mainstream classroom, staff office, staff toilets, cleaning store, circulation space, external play area and sensory garden, along with sundry minor works
Scoil Mháthair Dé , South Circular Road , Limerick City.
change of use of part of play yard from play yard to staff car parking and removal of planters and increased area of hardstanding
Scoil Mháthair Dé , South Circular Road , Limerick
2 no. ground floor extensions to the dwelling house, 1) dining room to the rear of the house and 2) utility to the rear of the garage linked to the side of the house, including all associated works above and below ground
3 Ullard , Ashbourne Avenue , Limerick.
the removal of a section of the existing fixed boundary railing onto the pedestrian path/access route and its replacement with a pedestrian gate and associated pathway within the grounds to ensure safe accessibility
Scoil Mhathair De , South Circular Road , Limerick City
development works that will consist of: (a) Segregated cycle lanes, shared carriageway and footpath upgrades/reconstruction commencing on the R526 (north-east of Ballykeefe Roundabout), along South Circular Rd, Henry St and terminating at Mill Lane in Limerick City Centre, with dedicated pedestrian and cycle crossing facilities throughout. (b) Traffic calming measures including raised table junctions, upgrade of junctions, reduced carriageways, changes to speed limits, and insertion of traffic signals at the Ashbourne Ave/New Street and Henry St/Mallow St junctions. (c) Removal of and redistribution of on-street parking bays to facilitate cycle lanes along the length of scheme. (d) Traffic restrictions to include vehicular access from the SCRd to City Centre diverted to Ballinacurra Road, removal of right turn from Ballinacurra Road to SCRd, Lifford Ave to SCRd, removal of left turn from Boreen a Tobair to SCRd, extension of existing one way system on SCRd to junction with Clontarf Place, and creation of one way streets to include Quin Street, St Gerard Street, and Mill Lane. (e) Infill car parking area to include 10 spaces on corner of South Circular Road and Laurel Hill Avenue. (f) Road resurfacing, road markings, colored surfacing, surface water and foul drainage works, public lighting, services, and landscaping works including removal of one tree at junction of South Circular Road/Lifford Avenue. (g) The proposed works are located within Architectural Conservation Areas 1 and 2 and adjacent to, but not within, the curtilages of a number of protected structures. (h) All associated site works
Dooradoyle to Limerick City - from east of Ballykeefe roundabout to Bishops quay via South Circular Road , Henry Street and Mill Lane
a waste holding yard and all associated modifications to the site layout permitted under LCCC Ref. 23/60911. The proposed development will consist of the construction waste storage building, an open waste holding yard, 2 no. compactors and associated site development works
The Former Scoil Carmel , O'Connell Avenue , Ballinacurra Limerick
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?