The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

18352

N/A

Kildare - Kildare County Council

Proposed Development

a single storey extension to my family home which will consist of 2 bedrooms, kitchen/living area and bathroom

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Apr 2018

  2. Further information requested

    28 May 2018

  3. Application withdrawn

    17 Dec 2018

Application Details

Location
Robertstown West , Naas , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.085 ha

Timeline

Registration Date
3 April 2018
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
17 December 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

21m
211648CONDITIONAL23 Nov 2021

the sub-division of existing site for the construction of a detached dormer bungalow, connection to public foul sewer and all associated site works

Robertstown West , Robertstown , Co. Kildare.

30m
211574N/A4 Nov 2021

for the sub-division existing site for the construction of a detached dormer bungalow, connection to public foul sewer and all associated site works

Robertstown West , Robertstown , Co. Kildare.

35m
211596N/A11 Nov 2021

the sub-division of existing site for the construction of a detached dormer bungalow, connection to public foul sewer and all associated site works

Robertstown West , Robertstown , Co. Kildare.

56m
22475N/A25 Apr 2022

for demolishing an existing outbuilding, constructing dormer bungalow type dwelling, connection to public foul drain system, and all associated ancillary site-works

Robertstown West , Robertstown , Naas

59m
22544CONDITIONAL11 May 2022

sought for demolishing an existing outbuilding, constructing dormer bungalow type dwelling, connection to public foul drain system, and all associated ancillary site-works

Robertstown West , Robertstown , Naas

74m
221473CONDITIONAL12 Dec 2022

retaining the change of use of a commercial premises from retail use to a takeaway/restaurant, retaining an extraction and ventilation apparatus to the rear of premises, signage to the front, and all associated ancillary site-works

Roberstown West , Roberstown , Co. Kildare

108m
22320CONDITIONAL23 Mar 2022

1) Subdivide a site on which my Grandparents were granted permission to build a bungalow situated at The Bridge, Robertstown Co. Kildare. 2) Build a Bungalow on the subdivided site to the right hand side of the existing house when viewed from Binns Bridge. 3) Make a connection to the existing sewer pipe on site which connects to the public sewer system. 4) Create a second separate vehicular entrance at the location of the existing entrance. 5) All ancillary site works in association with the above

The Bridge , Robertstown , Co. Kildare.

115m
2561112CONDITIONAL1 Oct 2025

for the removal of the existing mobile home on the site, and the construction of a proposed bungalow, new entrance, and all ancillary site works, to include stormwater to soakaways

Robertstown , County , Kildare

123m
211490CONDITIONAL15 Oct 2021

the construction of 3 No. 3 bedroom townhouses, connections to existing services, complete siteworks to existing development and all associated works

Grove Lane , Robertstown , Co. Kildare.

123m
22230N/A3 Mar 2022

1) subdivide a site on which my Grandparents were granted to build a bungalow. 2)Build a bungalow on the subdivided site to the right hand side of the existing house when viewed from Binns Bridge. 3) Make a connection to the existing sewer pipe on site which connects to the public sewer system. 4) Create a second separate vehicular entrance at the location of the existing entrance. 5) All ancillary site works in association with the above.

The Bridge , Robertstown , Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?