CONDITIONAL

Sligo - Sligo County Council

Proposed Development

for site development works for future industrial/commercial development. The works will include site excavation, construction of a new site access road, new surface water and sanitary sewers , new watermain, new lighting and a new ESB substation at

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Sept 2018

  2. Decision: CONDITIONAL

    30 Oct 2018

  3. Decision due

    4 Nov 2018

  4. Grant issued

    30 Nov 2018

Application Details

Location
Oakfield , Oakfield Road , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
2 ha

Timeline

Registration Date
10 September 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
30 October 2018
Grant Date
30 November 2018
Permission Expires
29 November 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

49m
20362CONDITIONAL19 Oct 2020

Development consisting of a new Advance Technology Unit consisting of office and light industrial/production space. Permission is also sought for vehicular and pedestrian entrance to site, signage, new timber post and rail site boundaries, car parking, cycle shelters, landscaping, a gas skid, underground storage tank, ESB substation, switch room, access road and all associated site works, The development has been the subject of a Screening for Appropriate Assessment in accordance with Article 6(3) of the EU Habitats Directive (Directive 92/43/EEC) and the Planning and Development Act 2000 as amended. The Screening for Appropriate Assessment will be submitted to the Planning Authority with The Planning Application.

IDA Business & Technology Park , Oakfield , Sligo

163m
22396CONDITIONAL24 Nov 2022

development consisting of the demolition of 2 existing external sheds, construction of new extensions and reconfigurations to the existing dwelling and all associated site works and services

1064 Oakfield Cottages , Oakfield , Co Sligo

181m
19329CONDITIONAL9 Aug 2019

development consisting of retention to alterations to front porch and velux roof window on front elevation to an existing dwelling.

Oakfield , Co Sligo , F91 K443

220m
19174CONDITIONAL3 May 2019

for development consisting of (a) retain dwelling house as constructed in different location on a reduced site size as original planning permission PL 93/19125, (b) retain part of front boundary wall and property entrance as constructed which differs from original planning permission PL 93/19125, (c) decommission the existing septic tank and percolation area on site, (d) install a new waste water treatment system on site, (e) construct a new percolation area on land in the ownership of Sligo County Council

Twin Oaks , Oakfield , Co. Sligo

250m
19123CONDITIONAL5 Apr 2019

for development consisting of the refurbishment of an existing two storey house (approx. 66 sqm) including demolition of two flat roof extensions, construction of a single storey extension to the north and east of the existing house (approx. 120 sq.m) possibly to be built in two phases, including south facing rooflights, demolition of existing agricultural buildings on site, relocation of existing site entrance, provision of a new on site wastewater treatment system, landscaping and all associated site works

Oakfield House , Oakfield , Co. Sligo

352m
17491CONDITIONAL22 Dec 2017

for development consisting of (a) retain and complete domestic garage on site currently constructed to ground floor level, (b) retain alterations to elevations of dwelling house as constructed on site, (c) retain location of dwelling house as built on site, together with all ancillary site works and services, (previous planning refs: PL13/366 and PL14/286)

Oakfield , Sligo

454m
2460498N/A20 Dec 2024

An extension to the existing access road and all associated infrastructure, including watermain, foul drainage network, pumping stations, stormwater drainage network and detention basin, electrical ducting, street lighting, footpaths, cycle tracks, landscaping and traffic signage. Phase 1 of these works was approved under planning application 18/360 in 2018, for which site works are now completed. The proposed scheme is a continuation of same and the development area is 4.59 Ha.

IDA Oakfield Business & Technology Park , Oakfield Sligo , Co. Sligo

454m
2560014CONDITIONAL20 Jan 2025

An extension to the existing access road and all associated infrastructure, including watermain, foul drainage network, pumping stations, stormwater drainage network and detention basin, electrical ducting, street lighting, footpaths, cycle tracks, landscaping and traffic signage. Phase 1 of these works was approved under planning application 18/360 in 2018, for which site works are now completed. The proposed scheme is a continuation of same and the development area is 4.59 Ha. The development has been subject of a Screening for Appropriate Assessment in accordance with Article 6(3) of the EU Habitats Directive (Directive 92/43/EEC) and the Planning and Development Act 2000 as amended. The Screening for Appropriate Assessment will be submitted with the Planning Application. The screening for Appropriate Assessment resulted in the requirement for a Natura Impact Statement (NIS) to be prepared in relation to the proposed development. The NIS will be submitted with the Planning Application.

IDA Oakfield Business & Technology Park , Oakfield Sligo , Co. Sligo

556m
20203CONDITIONAL3 Jul 2020

development consisting of the construction of a single storey domestic extension to the side of the existing domestic dwelling and all ancillary services

Carrowmore , Co. Sligo

614m
19151CONDITIONAL17 Apr 2019

for development consisting of the construction of a 24 metre high free standing lattice communication structure and its associated antennae communication dishes and ground equipment, with associated ground-mounted equipment cabinets within a 2.4m high palisade fence compound at

ESB's Oakfield 38kv Substation , Townland of Oakfield , Co. Sligo