1840
CONDITIONALClare - Clare County Council
Proposed Development
on the grant of outline permission ( Reference No. P16-201 ) which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
25 Jan 2018
Decision: CONDITIONAL
15 Mar 2018
Decision due
21 Mar 2018
Grant issued
15 Apr 2018
Application Details
- Location
- Site No. 1 Killow , Clarecastle , Co. Clare
- Applicant
- N/A
- Application Type
- PERMISSION CONSEQUENT
- Planning Authority
- Clare County Council
- Floor Area
- 236.44 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 25 January 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 March 2018
- Grant Date
- 15 April 2018
- Permission Expires
- 14 April 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
( ref. No. P16-325 of Outline Permission ) to construct private dwelling house, change of use of existing cottage on site. from domestic use to garage, installation of new waste water treatment system and percolation area, connect to existing infrastructure services and all associated site works
Killow , Clarecastle , Co. Clare
to construct a new dwelling house, septic tank, sewerage treatment system and access to the public road
Killoo , Clarecastle , Co. Clare
of a separate garage to the side of the existing dwelling house
Skehanagh , Clarecastle , Co Clare
to develop a motorway service area and rest area adjacent to Junction 12 of the M18 motorway, which will include service station building with convenience shop, food court, staff facilities, canopy, fuel facilities, parking and circulation space, children's play area, picnic area and access provision. The development also includes infrastructural works public lighting, signage, landscaping, internal fencing, electrical substation, sixteen electric car charging points, roof mounted solar panels, storm water runoff, petrol interceptors and attenuation system, on-site wastewater treatment plant including access road, pumping station and connection to public foul sewer, drainage improvement works, underground fuel storage tanks, rain water harvesting system, connection to public water supply, underground storage tanks for fire-fighting purposes, underground rain water harvesting tanks, works to improve visibility at access point, upgrade to adjacent roundabout and ancillary works. The connection to the public sewerage system will be by means of a rising main to an existing public sewer. The rising main sewer will cross under the M18 motorway by directional drilling and thereafter underground via existing road margins/public road and under River Fergus and railway line through the townlands of Kilbreckan, Killow, Skehanagh, Clareabbey and Ballybeg. The inert soil from the directional drilling will be used in landscaping works on the site of the service station building. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Kilbreckan , Doora , Ennis
with rising main sewer via existing public road / road margins through the Townlands of Kilbreckan, Killow, Skehanagh, Clareabbey and Ballybeg to develop a motorway service area and rest area adjacent to Junction 12 of the M18. The proposed development will include a service station building with convenience shop, food court, staff facilities, canopy, fuel facilities, parking and circulation space, children's play area, picnic area and access provision. The development also includes infrastructural works, public lighting, signage, landscaping, internal fencing, electrical substation, sixteen electric cars charging points, roof mounted solar panels, storm water runoff petrol interceptors and attenuation system, on-site wastewater treatment plant including access road, pumping station and connection to public foul sewer, drainage improvement works, underground fuel storage tanks, rain water harvesting system, connection to public water supply, underground storage tanks for fire fighting purposes, underground rain water harvesting tanks, upgrade to adjacent roundabout and ancillary works. The connection to the public sewerage system will be by means of a rising main to an existing public sewer via existing public road / road margins through the Townlands of Kilbreckan, Killow, Skehenagh, Clareabbey and Ballybeg, A Natura Impact Statement ( NIS ) will be submitted to the Planning Authority with this application.
Kilbreckan , Doora , Ennis
for the construction of a dwelling house, garage, wastewater treatment system and new entrance including ancillary site works
Killoo , Clarecastle , Co Clare
for the construction of a dwelling house, garage and proprietary waste treatment plant, bored well and road entrance including ancillary site works.
Killow(Kilbreckan) , Clarecastle , Co Clare
for the construction of a dwellinghouse with integrated auxiliary living accommodation, garage & proprietary waste treatment plant, bored well & road entrance including ancillary site works
Killow (Kilbreckan) , Clarecastle , Co. Clare
to construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
Killow , Clarecastle , Co. Clare
to construct a dwelling house and garage complete with new entrance, sewerage treatment system and ancillary works
Skehanagh , Clarecastle , Co. Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?