184209

N/A

Cork - Cork City Council

Proposed Development

Construction of and ESB substation and transformer base.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jan 2018

  2. Decision due

    26 Mar 2018

Application Details

Location
Ballycurreen Industrail Estate , Ballycurreen , Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
29 January 2018
Status
INCOMPLETED APPLICATION
Decision
N/A
Decision Due
26 March 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
184430CONDITIONAL20 Feb 2018

Construction of an ESB substation and transformer base.

Ballycurreen Industrial Estate , Ballycurreen , Co. Cork

41m
2240863CONDITIONAL9 Feb 2022

Permission for the installation of a 516.8kWp rooftop solar photovoltaic array on the roof of an existing factory building consisting of 1,276 No. 405Wp Suntech Power panels mounted directly on the roof surface, electrically connected to the existing electrical plant room and inverters mounted on the wall of the existing plant room, and all associated work.

Unit 21A , Ballycurreen Industrial Estate , Kinsale Road

70m
2241671CONDITIONAL22 Dec 2022

Permission for the installation of an circa 336.98 kWp Rooftop Solar Photovoltaic Array consisting in combination of circa 812 no. panels (circa 1,599.64m2) partially extending to an existing Rooftop Solar Photovoltaic Array (circa 2,513.72m2) located on Unit 21A, Ballycurreen Industrial Estate, Kinsale Road, Cork, with the extension situated on the most southern roof area of this industrial building; and partially on a vacant roof area located on an adjacent industrial building located to the North East, at Ballycurreen Industrial Estate, Kinsale Road, Cork, T12R866, with all the proposed panels mounted directly on the roof surface of the buildings and electrically connected to the existing electrical plant rooms via a combined total of 4 no. inverters mounted on the wall of the existing plant rooms, and all associated site works.

Unit 21A Ballycurreen Industrial Estate , Kinsale Road Cork and , Industrial building at Ballycurreen

109m
2140464CONDITIONAL1 Sept 2021

Permission to construct side extension to existing commercial unit, together with dock leveller and associated site works.

Montara House , Ballycurreen Industrial Estate , Kinsale Road

110m
2140325N/A30 Jun 2021

Permission to construct side extension to existing commercial unit, together with dock leveller and associated site works.

Montara House , Ballycurreen Industrial Estate , Kinsale Road

111m
2139886CONDITIONAL4 Feb 2021

Permission for the installation of a 199kWp rooftop solar photovoltaic array (984m2) on the roof of the existing Avoncourt factory building consisting of 585 No. 340Wp JA Solar panels mounted directly on the roof surface, electrically connected to the existing electrical plant room via 4 no. Solis inverters mounted on the wall of the existing plant room, to the rear of the existing factory building and all associated work.

Avoncourt Packaging Ltd , Unit 2 , Ballycurreen Industrial Estate

112m
2241608CONDITIONAL6 Dec 2022

Permission for the installation of a 215.8 kWp Rooftop Solar Photovoltaic Array extension (circa 1,020m2), consisting of circa 520 No. panels, to an existing Rooftop Solar Photovoltaic Array (circa 1032m2), with the proposed panels mounted directly on the roof surface, electrically connected to the existing electrical plant room via 4 No. inverters mounted on the wall of the existing plant room, located to the rear of the existing factory building and all associated work.

Avoncourt Packaging Ltd , Unit 2 Ballycurreen Industrial Estate , Airport Road

142m
187022CONDITIONAL19 Nov 2018

To construct a temporary 500 m2 single storey computer equipment storage building for a 3 year period including all ancillary site works

Ballycurreen Industrial Estate , Ballycurreen , Kinsale Road

142m
2140420CONDITIONAL11 Aug 2021

Permission to extend the temporary permission Planning Ref 18/07022 as granted to Construct a temporary 500 m2 Single storey Computer Equipment storage building for a further 3 year period including all ancillary site works

Balycurreen Industrial Estate , Ballycurreen , Kinsale Road

158m
2443134CONDITIONAL26 Jul 2024

Permission to demolish part of the existing kitchen and construct new kitchen to the rear and side of existing dwelling and all associated site works.

No. 94 , Curragh Woods , Frankfield

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.