18430

CONDITIONAL

Cavan - Cavan County Council

Proposed Development

for the construction of an industrial unit to the side of the existing industrial unit and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Oct 2018

  2. Further information requested

    27 Nov 2018

  3. Further information received

    6 Dec 2018

  4. Decision: CONDITIONAL

    12 Dec 2018

  5. Decision due

    11 Jan 2019

  6. Grant issued

    28 Jan 2019

Application Details

Location
Drumnawall , Arvagh , Co. Cavan
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cavan County Council
Site Area
0.6 ha

Timeline

Registration Date
17 October 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 December 2018
Grant Date
28 January 2019
Permission Expires
27 January 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

72m
21230CONDITIONAL21 Apr 2021

for extension & alterations to existing dwelling to include kitchen/dining/living area with connection to existing services

Drumnawall , Arvagh , Co. Cavan

118m
2460226CONDITIONAL23 May 2024

for the construction of a two storey detached dwelling house (on a site previously granted planning permission for 2 nr. semi-detached houses under planning ref: 99/1075) and all ancillary site works

No.1 Palm Court , Drumalt , Arvagh Co. Cavan

122m
2560505CONDITIONAL27 Aug 2025

to construct a 3G Astro Turf pitch (70m x 45m) to the rear of the existing school building to include ancillary metal cage surrounds, netting and integrated concrete retaining ball wall, flood lighting, sprint track, storage shed, boundary walls and fencing, pedestrian and emergency vehicle entrance and all ancillary site works

Drumalt , Arva , Co. Cavan

131m
21770REFUSED21 Dec 2021

to construct a two storey type dwelling house and detached domestic garage, alterations to existing entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works

Drumnawall , Arvagh , Co. Cavan

131m
22181CONDITIONAL6 May 2022

to construct a storey and a half type dwelling house and attached domestic garage, alterations to existing entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works

Drumnawall , Arvagh , Co. Cavan

159m
21488CONDITIONAL6 Aug 2021

to construct a two storey type dwelling house and detached domestic garage, new entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works

Drumnawall , Arvagh , Co Cavan

223m
21313CONDITIONAL26 May 2021

to demolish a single storey extension and to erect a fully serviced 2 storey extension to side and rear of existing dwelling and all ancillary site works

Drumnawall , Arva , Co. Cavan

270m
2460016CONDITIONAL18 Jan 2024

for changes made to one-bedroom dwelling house during construction to include: change of house type granted under planning reference number: 644546, to include, changes to all walls, window and door locations, replacement of flat roof with pitch roof. With connection to existing services and all associated site works.

Main Street , Arva , Co. Cavan

273m
2460372CONDITIONAL13 Aug 2024

for (1) RETENTION of existing temporary changing rooms, toilets & shower rooms, shop & store (2) RETENTION of existing sewerage treatment system and wastewater connection to public sewer (3) PERMISSION erect new spectator stand & 2 no. dugouts and all ancillary site works

Drumnawall , Arvagh , Co. Cavan

278m
21448N/A19 Jul 2021

for the installation of an ATM machine to the existing front elevation (East) , significant further information has been submitted

Daly's Day & Night Supermarket , Main Street , Arva

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?