The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

18482

N/A

Offaly - Offaly County Council

Proposed Development

CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTE WATER TREATMENT SYSTEM, A NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    31 Oct 2018

  2. Application withdrawn

    26 Nov 2018

Application Details

Location
CASTLEBARNAGH LITTLE , DAINGEAN , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.295 ha
Floor Area
273.08 sq m
Residential Units
1

Timeline

Registration Date
31 October 2018
Status
WITHDRAWN
Decision
N/A
Withdrawn
26 November 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
19521CONDITIONAL8 Nov 2019

CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, WASTE WATER TREATMENT SYSTEM, A NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS

CASTLEBARNAGH LITTLE , DAINGEAN , CO OFFALY

81m
2460150CONDITIONAL30 Apr 2024

(1.) domestic garage/ fuel store, (2.) front roadside boundary wall and (3.) any associated works that were part of these developments.

Killeen , Daingean , Co. Offaly

404m
18554CONDITIONAL7 Dec 2018

A NEW FULLY SERVICED DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA, CONNECTION TO MAINS WATER AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

CASTLEBARNAGH LITTLE , DAINGEAN , CO. OFFALY

446m
21770N/A13 Dec 2021

THE CONSTRUCTION OF A NEW TWO STOREY DWELLING, NEW ENTRANCE, DOMESTIC GARAGE, ON-SITE EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

KILLEEN , DAINGEAN , CO. OFFALY

446m
21798CONDITIONAL21 Dec 2021

THE CONSTRUCTION OF A NEW TWO STOREY DWELLING, NEW ENTRANCE, DOMESTIC GARAGE, ON-SITE EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

CASTLEBARNAGH LITTLE , DAINGEAN , CO. OFFALY

479m
2660181CONDITIONAL3 Apr 2026

construction of one number detached dwelling, one number detached garage, to install a pumped tertiary wastewater treatment system with coco filter and infiltration bed, to connect to existing public watermain, to construct new entrance onto public road and all associated site works

Castlebarnagh Little , Daingean , Co. Offaly

974m
2560583CONDITIONAL21 Nov 2025

5 no. glamping structures and associated ancillary works (connecting to an existing wastewater treatment system) and Retention permission for a raised platform to site a bell tent and an existing shepherds hut to accommodate a treatment room. The proposed development is within the curtilage of a PROTECTED STRUCTURE Mount Briscoe House (Ref: 25-31)

Mount Briscoe , Mullalough or Cavemount (Townland) , Daingean Co. Offaly

974m
2560541N/A6 Nov 2025

development of 5 no. glamping structures and associated ancillary works (connecting to an existing wastewater treatment system) and Retention permission for a raised platform to site a bell tent and an existing shepherds hut to accommodate a treatment room at Mount Briscoe, Mullalough or Cavemount (Townland) Daingean, Co. Offaly. The proposed development is within the curtilage of a PROTECTED STRUCTURE Mount Briscoe House (Ref: 25-31)

Mount Briscoe , Mullalough or Cavemount (Townland) , Daingean Co. Offaly

992m
20574CONDITIONAL20 Nov 2020

CONSTRUCTION OF A DORMER DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA INCLUDING ALL ANCILLARY SERVICES AND SITE WORKS

KILLADERRY , DAINGEAN , CO. OFFALY

1.1km
23356CONDITIONAL9 Aug 2023

AN AS CONSTRUCTED DOMESTIC SHED AND FUEL STORE TO REAR OF EXISTING DWELLING

PANAMA HOUSE , MULLALOUGH DAINGEAN , CO. OFFALY R35 XN77

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count -- build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?