The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

184853

CONDITIONAL

Cork - Cork City Council

Proposed Development

Construction of dwellinghouse, new entrance together with all other ancillary site works including demolition of an existing domestic garage

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Apr 2018

  2. Decision: CONDITIONAL

    28 Jun 2018

  3. Decision due

    3 Jul 2018

  4. Grant issued

    10 Aug 2018

Application Details

Location
Station Road , Shean Upper , Blarney
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
6 April 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 June 2018
Grant Date
10 August 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
184420N/A16 Feb 2018

Construction of new dwellinghouse, new entrance together with all other ancillary site works including demolition of an existing domestic garage.

Station Road , Shean Upper , Blarney

4m
177434N/A22 Dec 2017

Construction of new dwellinghouse, new entrance together with all other ancillary site works including demolition of an existing domestic garage.

Station Road , Shean Upper , Blarney

135m
2139961CONDITIONAL1 Mar 2021

Permission is sought for the retention of a single storey side sunroom extension and alterations to an existing storey and a half dwelling and all associated site works

Stations Cross , Station Road , Blarney

191m
2341923CONDITIONAL14 Apr 2023

Permission for renovations and extensions to existing dwelling consisting of the following: (1) To demolish existing roof and to construct a new first floor extension to existing dwelling, (2) To demolish existing rear extensions and outhouses and to replace same with a new single-storey rear extension to same dwelling and (3) To construct a new front entrance porch to same dwelling and all associated site works and services.

No.1 Saint Helens Row , Waterloo Road , Blarney

266m
2443168CONDITIONAL8 Aug 2024

Permission for retention of the existing primary school and ancillary storage unit at Gaelscoil Mhuscrai, Shean Lower, Blarney, Cork, T23EA29. Planning permission is sought for a temporary period of 5 years.

Gaelscoil Mhuscrai , Shean Lower , Blarney

276m
2443031CONDITIONAL27 Jun 2024

Permission for a Large-Scale Residential Development (LRD) at this site at Ringwood, Shean Upper, Blarney, Cork. The proposed development will consist of a largescale residential development (LRD), representing Phase 1 of the development in the Blarney East / Ringwood Expansion Area, and comprising of 246no. residential dwellings as follows: 101no. apartments arranged in 4no. part 3-storey, part 4-storey apartment blocks (to include 6no. 1-bed studio units, 35no. 1-bed units and 60no. 2-bed units); 30no. duplex dwellings arranged in 3no. 3-storey buildings (to include 15no. 1-bed dwellings and 15no. 2-bed dwellings); and 115no. 2-storey and 3-storey houses (to include 19no. 2-bed dwellings, 64no. 3-bed dwellings, and 32no. 4-bed dwellings). The proposed development also includes crèche (380.6sqm) with capacity to accommodate 61no. children. The proposed development will include provision for car parking, including EV charging points, bicycle parking, and motorcycle parking bays, and the provision of an area reserved for future resident car parking to the rear of Woodville Terrace on Station Road. The proposed development will also include the provision of private, communal, and public open spaces; internal roads and pathways with potential for future links to adjacent lands; pedestrian and cyclist routes; hard and soft landscaping and boundary treatments; waste storage; plant; signage; a new signalised access onto Station Road and road and footpath improvement works on Station Road and the R617 road; public lighting; 2no. new substations; all associated site development works; and all drainage and foul sewer infrastructure and network works, including nature-based SuDS measures. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR). The application may be inspected online at the following website: www.ringwoodphase1lrd.ie

Ringwood , Shean Upper , Blarney

276m
2443031CONDITIONAL27 Jun 2024

Permission for a Large-Scale Residential Development (LRD) at this site at Ringwood, Shean Upper, Blarney, Cork. The proposed development will consist of a largescale residential development (LRD), representing Phase 1 of the development in the Blarney East / Ringwood Expansion Area, and comprising of 246no. residential dwellings as follows: 101no. apartments arranged in 4no. part 3-storey, part 4-storey apartment blocks (to include 6no. 1-bed studio units, 35no. 1-bed units and 60no. 2-bed units); 30no. duplex dwellings arranged in 3no. 3-storey buildings (to include 15no. 1-bed dwellings and 15no. 2-bed dwellings); and 115no. 2-storey and 3-storey houses (to include 19no. 2-bed dwellings, 64no. 3-bed dwellings, and 32no. 4-bed dwellings). The proposed development also includes crèche (380.6sqm) with capacity to accommodate 61no. children. The proposed development will include provision for car parking, including EV charging points, bicycle parking, and motorcycle parking bays, and the provision of an area reserved for future resident car parking to the rear of Woodville Terrace on Station Road. The proposed development will also include the provision of private, communal, and public open spaces; internal roads and pathways with potential for future links to adjacent lands; pedestrian and cyclist routes; hard and soft landscaping and boundary treatments; waste storage; plant; signage; a new signalised access onto Station Road and road and footpath improvement works on Station Road and the R617 road; public lighting; 2no. new substations; all associated site development works; and all drainage and foul sewer infrastructure and network works, including nature-based SuDS measures. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR). The application may be inspected online at the following website: www.ringwoodphase1lrd.ie

Ringwood , Shean Upper , Blarney

277m
175310CONDITIONAL26 May 2017

Retention of single storey extension to rear and roof light to front of existing dwelling.

12 Telephone Terrace , Monacnapa , Blarney

300m
2443153CONDITIONAL2 Aug 2024

Permission for the demolition of existing single-storey attached shed to the side of existing dwelling and for the construction of a new single-storey extension to the rear and side of the existing dwelling, elevational alterations and all associated site works.

35 Monacnappa Estate , Blarney , Cork

301m
2240930REFUSED15 Mar 2022

Permission for conversion of an existing two-storey dwelling to 2 no. two-storey dwellings, including elevational alterations and all associated site works.

No.8 Chalwood Estate , Blarney , Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?