18496
CONDITIONALSligo - Sligo County Council
Proposed Development
for development consisting of the construction of a dwelling house, domestic garage and connect to public utilities, together with all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
17 Dec 2018
Decision: CONDITIONAL
11 Feb 2019
Decision due
19 Feb 2019
Grant issued
15 Mar 2019
Application Details
- Location
- Bunowna Td , Easky , Co. Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.228 ha
- Floor Area
- 171.14 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 17 December 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 11 February 2019
- Grant Date
- 15 March 2019
- Permission Expires
- 14 March 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Development consisting of the installation of 116 sq.metres of temporary prefabricated accommodation together with all associated site works and connection to existing services and utilities. The accommodation includes 2 no. single storey classrooms each with floor area of 58 sqm. Part of the existing school contains a protected structure; Sligo record of protected structures 2017-2023 register no. 87 and national inventory of architectural heritage register no. 32306013.
Colaiste Iascaigh , Bunowna Td , Easkey
development consisting of the construction of a new single storey extension together with works to the existing school at Colaiste Iascaigh (formerly Easkey Vocational School). (Part of the existing school contain a Protected Structure; Sligo Record of Protected Structures 2011-2017 Register No. 87 and National Inventory of Architectural Heritage Reg. No: 32306013). The works shall include the construction of new school accommodation of 312 sqm floor area to include generally; 2 no. classrooms, science lab and prep area, sanitary accommodation and new boiler house. Works to the existing school shall include: the demolition of existing external gas service enclosure; reconfiguration and refurbishment of the existing science lab building. The new building and all works are to be connected to all existing public utilities together with all associated site development works
Colaiste Iascaigh , Bunowna , Easkey
(1) construction of new entrance, boundary wall and car parking area; (2) construction of an all-weather pitch with associated fencing, ball stop netting and running/cycling track; (3) construction of playground and walking track; (4) construction of a changing facility; (5) connection to existing services and (6) carrying out of ancillary site works including passive lighting and landscaping
Aderavoher , Easkey , Co. Sligo
to carry out repair and renovation work to a protected structure (RPS No. 4) as follows; 1) Demolition of existing rear non original extension. 2) New windows to be added to the rear wall on the ground floor and first floor. 3) Replace existing pvc windows with timber sash windows to replicate original design. 4) Maintenance and repairs to existing fabric and finishes. 5) Internal works to existing structure. 6) Widen existing entrance at the north-east boundary to accommodate parking. 7) Create a new entrance for off-street parking. 8) All ancillary site works
Inver View , Adervoher TD , Easkey Co. Sligo
PP - for development consisting of erection of a two storey house with domestic garage. Connection to public mains sewer and all associated site works.
Bunowna TD , Easkey , Co. Sligo
Development of lands consisting of .8853 hectares as 'Easkey Glamping Village' to consist of the following elements: Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room and bathrooms. (Total area of 223.60m2); Communal area with Firepit, BBQ, outdoor seating and play area; 3 no. storey and half Glamping Barns (21sqm. each X 4.1 high); 7 no. Glamping Pods (21sqm. each X 3.1 high); 2 no. 2-person Bell tents (3m Dia, height 2.1m); 2 no. 4-person Bell tents (4m Dia, height 2.5m); Pitch tent area; Proposed landscaping works to the site; to extend existing access road from R297; 12 no. car parking spaces for use by the Glamping Site users; proposed planting for screening and privacy to the east of the site; connection to all existing services and carrying out of all ancillary site works
Adervoher Td , Easkey East ED , Co Sligo
development consisting of proposed development of lands consisting of 0.8853 hectares as 'Easkey Glamping Village' to consist of the following elements: (i) Works to the front roadside boundary to enable safe access and suitable sightlines, (ii) Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room, bathrooms & bin store (Total area of 223.60 m2), (iii) Communal Area with Firepit, BBQ, outdoor seating and play area, (iv) 3no. storey and half Glamping Barns (21sqm. Each x 4.1m high), (v) 7no. Glamping Pods (21sqm. Each x 3.1m high), (vi) 2no. 2-person Bell tents (3m Dia, height 2.1m) (vii) 2no. 4-person Bell tents (4m Dia, height 2.5m), (vii) 7no. Pitch tents, (ix) Proposed landscaping works to the site to extend existing access road from R297, (x) Proposed car park, (xi) Proposed 5m wide planting for screening and privacy to the east of the site, (xii) Connection to all existing services and carry out all ancillary site works
Adervoher Td , Easkey East ED , Co. Sligo
development consisting of (1) Repair/replace roof, fascias, gutters and downpipes, (2) Repair render to external façade where required, (3) Repair/replace windows and doors, (4) Repair/replace floorboards and joists, (5) Retain/repair existing features including fireplaces, internal doors, skirtings, and coving where possible, (6) Retain and repair timber stairs, (7) Repair boundary walls and gates. All the above to be carried out in accordance with the Conservation report and recommendations submitted with this application, (8) Demolish existing boiler house to the rear, (9) Construct a single storey extension to the rear (12.4 m2), (10) All associated site works. The building is Number 88 on the Sligo County Council Record of Protected Structures.
Bridge House , Bunowna , Easkey Co. Sligo.
(1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed detached dwelling houses (62 no. total units (58 houses, 4 apartments)); (2) the extension and connection of the existing access road and estate services and (3) to carry out ancillary site works
Aderavoher , Easkey , Co. Sligo
Planning permission for (1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed detached dwelling houses (62 no. total units (58 houses, 4 apartments)); (2) the extension and connection of the existing access road and estate services and (3) to carry out ancillary site works at Aderavoher, Easkey, Co.Sligo.
Aderavoher , Easkey , Co. Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?