The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

1850788

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

A CUSTOMER SERVICE FACILITY WITH ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 May 2018

  2. Decision: CONDITIONAL

    28 Jun 2018

  3. Decision due

    11 Jul 2018

  4. Grant issued

    31 Jul 2018

Application Details

Location
FANAD LIGHTHOUSE VISITORS CENTRE , ARRYHEERNABIN , BALLYLARR
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.58 ha

Timeline

Registration Date
17 May 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 June 2018
Grant Date
31 July 2018
Permission Expires
30 July 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
1850708N/A8 May 2018

A CUSTOMER SERVICE FACILITY WITH ALL ASSOCIATED SITE WORKS

FANAD LIGHTHOUSE VISITORS CENTRE , ARRHEERNABIN , BALLYARR

0m
2152063CONDITIONAL18 Oct 2021

CONSTRUCTION OF OFFICE ACCOMMODATION AND ALL ASSOCIATED SITE WORKS

VISITORS CENTRE FANAD LIGHTHOUSE , ARRYHEERNABIN BALLYLAR PO , LETTERKENNY

54m
2350437CONDITIONAL4 Apr 2023

(1) REDEVELOPMENT (INCLUDING PARTIAL DEMOLITION OF EXISTING TICKET OFFICE AND SHOP MEASURING 69 M2), (2) ERECTION OF A NEW MULTI-USE VISITOR EXPERIENCE CENTRE FOR FANAD HEAD LIGHTHOUSE MEASURING 963.6M2, (3) CONSTRUCTION OF 22 NO. ADDITIONAL CAR PARKING SPACES, 3 NO. MINIBUS/RV SPACES, BUS DROP OFF AREA, EXTERNAL SEATING AREA AND A CHILDREN’S PLAY AREA, (4) UPGRADING OF THE EXISTING WASTEWATER TREATMENT SYSTEM, (5) ALL LANDSCAPING, BOUNDARY TREATMENTS, ENTRANCE AND PEDESTRIAN ACCESS AND MOVEMENT IMPROVEMENTS, PUBLIC LIGHTING, ALL ASSOCIATED SITE WORKS AND SERVICE CONNECTIONS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

FANAD HEAD VISITORS CENTRE , FANAD HEAD , LETTERKENNY PO

236m
1750893CONDITIONAL8 Jun 2017

CONSTRUCTION OF A POD FOR EXHIBITION PURPOSES WITH ALL ASSOCIATED SITE WORKS AT FANAD LIGHTHOUSE

ARRYHEERNABIN , BALLYLAR PO , LETTERKENNY

407m
2461132CONDITIONAL24 Jul 2024

DOMESTIC GARAGE, STORAGE AND GAMES ROOM BUILDING TO REAR OF EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS

ARRYHEERNABIN , FANAD NORTH , LETTERKENNY PO

719m
2650013CONDITIONAL10 Feb 2026

(1) RENOVATION AND CONSTRUCTION OF EXTENSION TO EXISTING DWELLING HOUSE AND (2) UPGRADE OF EXISTING SEWERAGE TREATMENT SYSTEM WITH ALL ASSOCIATED SITE WORKS

ARRYHEERNABIN , BALLYLAR , FANAD LETTERKENNY PO

746m
2150049UNCONDITIONAL20 Jan 2021

THE INCREASE IN HEIGHT AND EXTENSION TO THE LIGHTHOUSE TAVERN TO PROVIDE THE FOLLOWING (1) PROVISION OF ENTRANCE LOBBY, BAR STORE, MALE DORMITORY WITH TOILETS AND SHOWERS, LAUNDRY AND STORE AT BASEMENT LEVEL. (2) CHANGE OF USE OF EXISTING DWELLING HOUSE TO FOYER , STAFF/ OFFICE AREA AND BAR, PROVISION OF LOUNGE, FEMALE DORMITORY WITH TOILETS AND SHOWERS, MALE AND FEMALE LOCKER ROOMS WITH TOILETS AND SHOWERS, TOILETS AND STORE. DEMOLITION OF EXISTING BAR & LOUNGE TO PROVIDE VEHICULAR EGRESS FROM CARPARK. PROVISION OF GENERATOR ROOM & BIN STORAGE AREA AT GROUND FLOOR LEVEL. (3) PROVISION OF 6 NO. EN-SUITE BEDROOMS, RESIDENTIAL APARTMENT AND STORES AT FIRST FLOOR LEVEL. (4) PROVISION OF DINING ROOM, KITCHEN, BREAKFAST AREA, RESIDENTS LOUNGE, TOILETS AND KITCHEN STORES AT SECOND FLOOR LEVEL. (5) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF ON-SITE SEWERAGE TREATMENT SYSTEM WITH SAND POLISHING FILTER. (6) DRILL DEEP BORED WELL ON SITE. (7) PROVISION OF NEW SIGNAGE AND ALL ASSOCIATED SITE WORKS

ARRYHEERNABIN , BALLYARR , LETTERKENNY PO

748m
1750534CONDITIONAL5 Apr 2017

THE FOLLOWING ALTERATIONS TO PLANNING PERMISSION GRANTED UNDER PLANNING REF.NO. 15/50673. (1) ADDITION OF TWO NUMBER SINGLE STORIED EXTENSIONS TO REAR OF BUILDING. (A) TO ENCLOSE STAIRS LEADING TO BASEMENT AND (B) TO PROVIDE TOILETS AT GROUND FLOOR LEVEL. (2) ADDITION OF LINK CORRIDOR AT FIRST FLOOR LEVEL BETWEEN MAIN BUILDING AND ANNEX BUILDING (3) INCREASE IN FLOOR AREA OF BASEMENT (4) INCREASE IN WIDTH OF STAIR ENCLOSURE AT REAR OF BUILDING (5) ALTERATIONS TO INTERNAL LAYOUT (6) ALTERATIONS TO FENESTRATION PATTERN AND (7) ALL ASSOCIATED SITE WORKS

ARRYHEERNABIN , BALLYLAR P.O. , LETTERKENNY

789m
2351237CONDITIONAL18 Aug 2023

INSTALLATION OF A SEPTIC TANK / WASTEWATER SEWAGE TREATMENT SYSTEM AND PERCOLATION AREA TO SERVICE EXISTING HOUSE AND ALL ANCILLARY SITE DEVELOPMENT WORKS

ARRYHEERNABIN , PORTSALON , LETTERKENNY PO

1.1km
2050668CONDITIONAL25 May 2020

CONSTRUCTION OF A DWELLING HOUSE WITH CONNECTION TO NEW SEPTIC TANK AND ALL ASSOCIATED SITE WORKS

BALLURE , BALLYLAR FANAD , LETTERKENNY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?