18512
CONDITIONALKildare - Kildare County Council
Proposed Development
(1) Retention permission for alterations to 1 Mill Lane to include blocking up of windows and minor external works and (2) Permission to extend an existing apartment by incorporating an adjoining unauthorised apartment and for it to be used as a single dwelling, and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
3 May 2018
Further information requested
26 Jun 2018
Further information received
6 Jul 2018
Decision: CONDITIONAL
30 Jul 2018
Decision due
2 Aug 2018
Grant issued
19 Oct 2018
Application Details
- Location
- 1 Mill Lane , The Commons , Roseberry
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Kildare County Council
- Site Area
- 0.01 ha
Timeline
- Registration Date
- 3 May 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 July 2018
- Grant Date
- 19 October 2018
- Permission Expires
- 18 October 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
alterations and change of use of premises from retail premises to use as a domestic dwelling and all associated site works
1 Mill Lane , The Commons , Roseberry Newbridge
demolition of existing single storey rear extension to existing detached bungalow and demolition of existing single storey detached domestic garage, permission for the construction of a one and half storey rear extension to existing single storey detached bungalow and all associated site works
Mill Lane , Roseberry , Newbridge
(a) Planning permission for a change of house-type and house position, to that granted under Kildare County Council planning file reference 14/399 as revised by Significant Further Information and as extended by grant of permission under Kildare County Council planning file reference 19/1162 for an extension of duration, (b) erection of 1.8m high boundary wall to side (south) boundary and (c) all associated site works.
Roseberry , Newbridge , Co. Kildare.
(a) For a change of house type and house site position, to that granted under Kildare County Council planning file reference 14/399 as revised by Significant Further Information and as extended by grant of permission under Kildare County Council planning file reference 19/1162 for an extension of duration; (b) Erection of 1.8m high boundary wall to side (south) boundary; and (c) All associated site works
Roseberry , Newbridge , Co. Kildare.
Extension of Duration of 14/399; (a) Demolition of existing garage; (b) Erection of two storey house; (c) Erection of new boundary wall; (d) Closing of existing entrance; (e) Form new double recess entrance; (f) Proposed connection to mains foul sewer and (g) All associated site works as revised by significant further information
Roseberry , Newbridge , Co. Kildare.
for a one storey extension as constructed to the rear of a one storey dwelling and all associated siteworks
Mill Lane , Roseberry , Newbridge
(a) planning permission for a change of house type and house site position, to that granted under Kildare County Council planning file reference 14/399 as revised by Significant Further Information, (b) erection of 1.8m high boundary wall to Side(South) boundary and (c) all associated site works
Roseberry , Newbridge , Co. Kildare.
for the demolition of existing front boundary wall to allow for a new vehicular entrance and front boundary wall to existing house and to widen existing public footpath and all associated site works
Westview , Roseberry , Newbridge
to (a) alter the window and door fenestration to front (east) elevation of property, (b) insert window to side (south) of property and (c) widen vehicle access to 3.0m
Roseberry , Newbridge , Co. Kildare
for A. Alterations to layout and elevations of existing single storey dwelling B. Constructing a two-storey extension to the rear of existing dwelling and all ancillary site works
5 Mill Lane , Roseberry , Newbridge
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?