The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

1851322

N/A

Donegal - Donegal County Council

Proposed Development

DOMESTIC GARAGE AND 1 WINDOW AT FIRST FLOOR LEVEL ON THE NORTH-EAST GABLE OF THE DWELLING HOUSE

View the full application file on the council's planning portal →

Application Details

Location
BALLYLOUGHAN , BRUCKLESS , DONEGAL PO
Applicant
N/A
Application Type
RETENTION
Planning Authority
Donegal County Council
Site Area
0.2 ha

Timeline

Registration Date
23 August 2018
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
1851606CONDITIONAL18 Oct 2018

DOMESTIC GARAGE AND 1 WINDOW AT FIRST FLOOR LEVEL ON THE NORTH-EAST GABLE OF THE DWELLING HOUSE

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

417m
1750281CONDITIONAL28 Feb 2017

CONSTRUCTION OF A NEW DWELLING, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

449m
1750818CONDITIONAL26 May 2017

SITE EXCAVATION AND LEVELLING WORKS TO THE REAR OF DWELLING HOUSE AND PLANNING PERMISSION FOR THE CONSTRUCTION OF A DETACHED GARAGE AND STORE AND ASSOCIATED SITE WORKS

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

908m
2661202N/A30 Jun 2026

PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS AND SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION

KILLYBEGS GLEBE AGHAYEEVOGE CASHELREAGH GLEBE BRUCKLESS AIGHAN BRUCKLESS & DARNEY , DONEGAL PO , CO. DONEGAL

940m
2661265N/A8 Jul 2026

A PERIOD OF 10 YEARS FOR PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF. NO. PA16.316178). THE TURBINE DELIVERY ROUTE (TDR) WILL ORIGINATE AT THE PORT OF ENTRY AT KILLYBEGS HARBOUR, CO. DONEGAL, RUN THROUGH CO. SLIGO, CO. LEITRIM AND TERMINATE AT THE CONSENTED OWENINNY WIND FARM PHASE 3 SITE, CO. MAYO. THE TOTAL LENGTH OF THE TDR IS C.188KM OF WHICH C.65KM IS WITHIN CO. DONEGAL, C.57KM IN CO. SLIGO, AND C.36KM IN CO. MAYO. MINOR TEMPORARY AND PERMANENT WORKS ARE NOT PROPOSED ALONG THIS ENTIRE ROUTE BUT ONLY AT SELECT LOCATIONS. THE TOTAL AREA REQUIRED FOR THE WORKS IN CO. DONEGAL IS C.0.2HA. THE DEVELOPMENT WITHIN CO. DONEGAL COMPRISES MINOR TEMPORARY WORKS IN THE TOWNLANDS OF KILLYBEGS, GLEBE, AGHAYEEVOGE, CASHELREAGH GLEBE, BRUCKLESS, AIGHAN, BRUCKLESS AND DARNEY. THESE WORKS ARE REQUIRED TO ACCOMMODATE DELIVERY OF ABNORMAL INDIVISIBLE LOADS (AIL) AND WILL CONSIST OF (1) LAYING OF TEMPORARY LOAD BEARING SURFACE AT 5 NO. LOCATIONS, (2) TEMPORARY FENCE REMOVAL, TEMPORARY REMOVAL AND RELOCATION OF LIGHTS AT 1 NO. LOCATION, (3) TEMPORARY REMOVAL OF BOLLARD AT 1 NO. LOCATION, (4) TEMPORARY REMOVAL OF GATE, WALL AND CHEVRONS AT 1 NO. LOCATION, (5) TEMPORARY REMOVAL OF ROAD SIGNALS, BOLLARDS, LIGHTING COLUMNS, WALL AND FENCE AT 1 NO. LOCATION AS WELL AS HEDGEROW AND TREE TRIMMING, (6) TEMPORARY REMOVAL OF FENCE AND VEGETATION AT 1 NO. LOCATION, (7) TEMPORARY REMOVAL OF HEDGEROWS, FENCE AND WALL AT 1 NO. LOCATION, (8) REINSTATEMENT OF ALL TEMPORARY WORKS AREAS TO PREVIOUS CONDITION AND (10) ALL ASSOCIATED AND ANCILLARY WORKS REQUIRED FOR THE PROPOSED TDR. SEPARATE APPLICATIONS WILL BE MADE TO BOTH SLIGO AND MAYO COUNTY COUNCILS IN RESPECT OF WORKS REQUIRED AT LOCATIONS WITHIN EACH COUNTY BOUNDS. MINOR TEMPORARY WORKS IN SLIGO ARE PROPOSED AT CARROWNACREEVY, TANREGO WEST, ABBEYTOWN, CORHAWNAGH AND CARRICKNAGAT. PERMANENT WORKS ARE PROPOSED AT CARRICKNAGAT. MINOR TEMPORARY WORKS IN MAYO ARE PROPOSED AT LECARROW, CROSSMOLINA, ABBEYTOWN, KNOCKALEGAN, GLEBE, GORTSKEDDIA, BALLINA, ABBEYHALFQUARTER, KNOCKNALYRE AND BUNREE. PERMANENT WORKS ARE PROPOSED AT CROSSMOLINA. AN APPROPRIATE ASSESSMENT SCREENING REPORT (AASR) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THIS APPLICATION

KILLYBEGS GLEBE AGHAYEEVOGE CASHELREAGH GLEBE BRUCKLESS AIGHAN BRUCKLESS & DARNEY , DONEGAL PO , CO. DONEGAL

1.1km
2251466N/A31 Aug 2022

(1) COMPLETION OF 10 NO. SEMI-DETACHED DWELLING HOUSES INCLUDING AMENDMENTS TO THE FRONT ELEVATION AND CONSTRUCTION OF A REAR EXTENSION TO EACH DWELLING HOUSE DESIGN (2) UPGRADING OF EXISTING ON-SITE TREATMENT SYSTEM (3) COMPLETION OF SERVICE ROAD, FOOTPATHS AND ASSOCIATED SITE DEVELOPMENT WORKS

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

1.1km
2251678N/A5 Oct 2022

DEVELOPMENT PREVIOUSLY APPROVED UNDER PLANNING REFERENCE NUMBERS 03/1080, 08/20133 AND 10/20376 (1) COMPLETION OF (A) 10 NO SEMI-DETACHED DWELLING HOUSES INCLUDING AMENDMENTS TO THE FRONT ELEVATION AND CONSTRUCTION OF A REAR EXTENSION TO EACH DWELLING HOUSE DESIGN (B) SERVICE ROAD, FOOTPATHS AND ASSOCIATED SITE DEVELOPMENT WORKS (2) UPGRADING OF EXISTING ON-SITE TREATMENT SYSTEM

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

1.1km
2660524CONDITIONAL30 Mar 2026

(1) RETENTION OF (A) 2NO. DOMESTIC GARAGES ADJACENT TO THE SOUTHWEST CORNER OF EXISTING DWELLING AND (B) STONEER CLADDING TO THE NORTHEAST ELEVATION OF EXISTING DWELLING, (2) CONSTRUCTION OF AN EXTENSION TO THE SOUTHWEST ELEVATION OF EXISTING DWELLING, (3) ALTERATION OF EXISTING DWELLING TO THE NORTHEAST ELEVATION AND (4) ALL ASSOCIATED SITEWORKS AND CONNECTION TO ALL EXISTING SERVICES

BALLYLOUGHAN , BRUCKLESS , CO. DONEGAL

1.2km
2561141CONDITIONAL4 Jul 2025

(1) RENOVATION OF EXISTING SEMI-DETACHED HOUSE AND CONSTRUCTION OF EXTENSION TO THE SIDE AND REAR OF THE HOUSE, (2) INSTALLATION OF NEW ON SITE PROPRIETARY SEWERAGE TREATMENT SYSTEM AND PERCOLATION AREA AND (3) DEMOLITION OF EXISTING GARAGE AND CONSTRUCTION OF NEW DETACHED DOMESTIC GARAGE AND ASSOCIATED SITE WORKS

BALLYLOUGHAN , BRUCKLESS , DONEGAL PO

1.2km
2151291UNCONDITIONAL30 Jun 2021

CONSTRUCTION OF A PART ONE STOREY PART ONE AND A HALF STOREY DWELLING HOUSE, A DETACHED DOMESTIC GARAGE, PROVISION OF EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA, PROVISION OF ACCESS ROAD AND ALL ASSOCIATED SITE WORKS

TAWNASLIGO , BRUCKLESS , DONEGAL PO

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?