1851383
CONDITIONALDonegal - Donegal County Council
Proposed Development
CONSTRUCTION OF A 'HALFWAY HOUSE' BUILDING OFFERING A 'MID ROUND' TOILET AND REFRESHMENT FACILITY WITH ASSOCIATED SITE WORKS INCLUDING CONNECTION TO A PROPRIETARY PACKAGED SEWERAGE TREATMENT UNIT AND PERCOLATION AREA APPROVED UNDER PLANNING PERMISSION REF 18/50855
View the full application file on the council's planning portal →Application Timeline
Application received
6 Sept 2018
Decision: CONDITIONAL
26 Oct 2018
Appeal submitted
22 Nov 2018
Application withdrawn
13 Dec 2018
Application Details
- Location
- NARIN & PORTNOO GOLF CLUB , CLOONEY & CASHELGOLAN , MAAS
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 1.31 ha
Timeline
- Registration Date
- 6 September 2018
- Status
- WITHDRAWN
- Decision
- CONDITIONAL
- Decision Date
- 26 October 2018
- Withdrawn
- 13 December 2018
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-303076-18
- Submitted
- 22 November 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF A NEW GOLF COURSE MAINTENANCE EQUIPMENT STORAGE BUILDING WITH ASSOCIATED SITE WORKS INCLUDING A PROPRIETARY PACKAGED SEWERAGE TREATMENT UNIT AND PERCOLATION AREA
CLOONEY , MAAS , DONEGAL P.O.
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDMENTS TO THE GOLF COURSE EQUIPMENT SHED APPROVED UNDER PLANNING REFERENCE 18/50855 INCLUDING THE PROVISION OF ADDITIONAL FLOOR AREA OF 159 SQ.M AND FENESTRATION MODIFICATIONS (5) BOUNDARY FENCING ALONG DUNES TO THE NORTH-WESTERN TIP OF THE COURSE, IN AN AREA DESIGNATED IN THE COUNTY DONEGAL DEVELOPMENT PLAN 2018-2024 AS ESPECIALLY HIGH SCENIC AMENITY
NARIN & PORTNOO GOLF COURSE , CLOONEY , PORTNOO
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE, (2) AN ACCESSWAY THROUGH THE BERMS, ON LAND FORMERLY PART OF THE CAR PARK, (3) WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE. THE WATER TANK WILL BE SUPPLIED PRIMARILY FROM THE EXISTING WATER MAIN WITHIN THE COURSE AND FROM A FUTURE RAINWATER HARVESTING SYSTEM SUPPLIED FROM THE GUTTERS ON THE ROOF OF THE ADJOINING MAINTENANCE SHED. THIS SUPPLY WILL BE IN SUBSITUTION TO THE PRESENT SUPPLY FROM THE EXTRACTION SOURCE APPROVED IN 2004, AND (4) BOUNDARY FENCING ALONG DUNES TO THE NORTH-WESTERN TIP OF THE COURSE, IN AN AREA DESIGNATED IN THE COUNTY DONEGAL DEVELOPMENT PLAN 2018-2024 AS ESPECIALLY HIGH SCENIC AMENITY
CLOONEY , PORTNOO , DONEGAL PO
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDMENTS TO THE GOLF COURSE EQUIPMENT SHED APPROVED UNDER PLANNING REFERENCE 18/50855 INCLUDING THE PROVISION OF ADDITIONAL FLOOR AREA OF 159 SQ.M AND FENESTRATION MODIFICATIONS (5) BOUNDARY FENCING ALONG DUNES TO THE NORTH-WESTERN TIP OF THE COURSE, IN AN AREA DESIGNATED IN THE COUNTY DONEGAL DEVELOPMENT PLAN 2018-2024 AS ESPECIALLY HIGH SCENIC AMENITY
NARIN AND PORTNOO GOLF COURSE , CLOONEY , PORTNOO
(1) PLANTED SCREENING BERMS, OVER 2 METRES IN HEIGHT, IN AN AREA FORMERLY USED FOR CAR PARKING IN PROXIMITY TO THE PRACTICE PUTTING GREEN AND CLUB HOUSE (2) AN ACCESSWAY THROUGH THE BERMS ON LAND FORMERLY PART OF THE CAR PARK (3) A WATER STORAGE TANK AND ASSOCIATED SITE WORKS WITHIN THE MAINTENANCE STORAGE YARD IN THE CENTRE OF THE COURSE (4) AMENDMENTS TO THE GOLF COURSE EQUIPMENT SHED APPROVED UNDER PLANNING REFERENCE 18/50855 INCLUDING THE PROVISION OF ADDITIONAL FLOOR AREA OF 159 SQ.M AND FENESTRATION MODIFICATIONS (5) BOUNDARY FENCING ALONG DUNES TO THE NORTH-WESTERN TIP OF THE COURSE, IN AN AREA DESIGNATED IN THE COUNTY DONEGAL DEVELOPMENT PLAN 2018-2024 AS ESPECIALLY HIGH SCENIC AMENITY
NARIN AND PORTNOO GOLF COURSE , CLOONEY , PORTNOO
EXTENSION, RENOVATION AND REFURBISHMENTS TO THE LAKEHOUSE HOTEL CONSISTING OF: (1) EXTENSIONS TO FOOTPRINT OF THE MAIN HOTEL ADDING A GUEST BEDROOM FOR ACCESSIBLE USE TO THE EXISTING DETACHED SINGLE STOREY BEDROOM AND STORAGE BUILDING, (2) SMALL EXTENSIONS TO THE FOOTPRINT OF THE MAIN HOTEL BUILDING ALONG THE EAST SIDE AT GROUND FLOOR LEVEL TO PROVIDE FOR ENLARGED PLANT, STORAGE AND UTILITY SPACE AS WELL AS A NEW REAR ENTRANCE TO THE HOTEL ADDING APPROXIMATELY 75 SQM TO THE EXISTING OVERALL FLOOR AREA OF CIRCA 1,035 SQM, (3) ROOFING WORKS ASSOCIATED WITH THE EXTENSIONS LISTED AT NO. 1 AND NO. 2 AND REROOFING WORK ASSOCIATED WITH THE CHANGE TO THE OVERALL ROOF PROFILE AND SHAPE INCLUDING THE RAISED LEVEL OF PARTS OF THE EXISTING ROOF AND THE REMOVAL OF THE GABLE FACING WEST, DORMER WINDOWS FACING WEST AND EAST WITH THE CONTINUATION OF THE NEW PITCHED ROOF PROFILE OVER THE EXISTING CENTRAL FLAT ROOF SECTION, (4) AMENDMENTS TO THE FENESTRATION AND WALL FINISHES RESULTING IN AMENDED ELEVATIONS AND (5) SITE BOUNDARY WALLS, GENERAL SITE WORKS AND DRAINAGE
GLEBE , PORTNOO , LETTERKENNY PO
(1) CONSTRUCTION OF SINGLE STOREY EXTENSIONS TO THE EXISTING BUILDING PROVIDING FOR A NEW PORCH AT SOUTH ELEVATION, A NEW SUNROOM AT WEST ELEVATION, A GUEST DINING AREA AT EAST ELEVATION WITH A FURTHER TWO STOREY EXTENSION AT EAST ELEVATION ACCOMMODATING A KITCHEN AREA AT GROUND FLOOR AND ENLARGEMENT OF GUEST BEDROOM AT FIRST FLOOR LEVEL ABOVE, (2) REROOFING OF PART OF THE EXISTING BUILDING WITH ASSOCIATED CHANGES TO ROOF PROFILE AND SHAPE INCLUDING THE RAISED LEVEL OF PARTS OF THE EXISTING ROOF, (3) AMENDMENTS TO THE FENESTRATION, WALL FINISHES INCLUDING ADDING LOCAL STONE FINISHES TO CONTRAST WITH PRIMARILY WHITE RENDERED FINISH AND AMENDED GABLE PROFILES OF THE DETACHED SINGLE STOREY ACCESSIBLE BEDROOM ANNEX AND (4) GENERAL ASSOCIATED SITEWORKS, DRAINAGE AND BOUNDARY TREATMENT. THE TOTAL ADDITIONAL FLOOR AREA WILL BE 134.52 SQM TO ADD TO THE EXISTING OVERALL FLOOR AREA OF 1,110.71 SQM AND THE PUBLIC BAR AND FUNCTION ROOM IS BEING REMOVED MAKING IT A RESIDENT ONLY FACILITY, THEREBY DECREASING THE INTENSITY OF THE USE
GLEBE , PORTNOO , LETTERKENNY PO
EXTENSION, RENOVATION AND REFURBISHMENTS AT THE LAKEHOUSE HOTEL, CURRENTLY NOT OPERATING DUE TO ONGOING BUT STALLED WORKS OF REFURBISHMENT AND CONSISTING OF THE FOLLOWING: (1) EXTENSIONS TO FOOTPRINT OF THE MAIN HOTEL ADDING A GUEST BEDROOM FOR ACCESSIBLE USE TO THE EXISTING DETACHED SINGLE STOREY BEDROOM AND STORAGE BUILDING, (2) SMALL EXTENSIONS TO THE FOOTPRINT OF THE MAIN HOTEL BUILDING ALONG THE EAST SIDE AT GROUND FLOOR LEVEL TO PROVIDE FOR ENLARGED PLANT, STORAGE AND UTILITY SPACE AS WELL AS A NEW REAR ENTRANCE TO THE HOTEL ADDING APPROXIMATELY 75 SQ.M TO THE EXISTING OVERALL FLOOR AREA OF CIRCA 1,035 SQ. M, (3) ROOFING WORKS ASSOCIATED WITH THE EXTENSIONS LISTED AT NO. 1 & NO. 2 AND REROOFING WORK ASSOCIATED WITH THE CHANGE TO THE OVERALL ROOF PROFILE AND SHAPE INCLUDING THE RAISED LEVEL OF PARTS OF THE EXISTING ROOF AND THE REMOVAL OF THE GABLE FACING WEST, DORMER WINDOWS FACING WEST AND EAST WITH THE CONTINUATION OF THE NEW PITCHED ROOF PROFILE OVER THE EXISTING CENTRAL FLAT ROOF SECTION, (4) AMENDMENTS TO THE FENESTRATION AND WALL FINISHES RESULTING IN AMENDED ELEVATIONS, (5) DETACHED SINGLE STOREY STORAGE BUILDING AND (6) SITE BOUNDARY WALLS, GENERAL SITE WORKS AND DRAINAGE
THE LAKEHOUSE HOTEL , GLEBE , PORTNOO LETTERKENNY PO
EXTENSION, RENOVATION AND REFURBISHMENTS AT THE LAKEHOUSE HOTEL, CURRENTLY NOT OPERATING DUE TO ONGOING BUT STALLED WORKS OF REFURBISHMENT AND CONSISTING OF THE FOLLOWING: (1) EXTENSIONS TO FOOTPRINT OF THE MAIN HOTEL ADDING A GUEST BEDROOM FOR ACCESSIBLE USE TO THE EXISTING DETACHED SINGLE STOREY BEDROOM AND STORAGE BUILDING, (2) SMALL EXTENSIONS TO THE FOOTPRINT OF THE MAIN HOTEL BUILDING ALONG THE EAST SIDE AT GROUND FLOOR LEVEL TO PROVIDE FOR ENLARGED PLANT, STORAGE AND UTILITY SPACE AS WELL AS A NEW REAR ENTRANCE TO THE HOTEL ADDING APPROXIMATELY 75 SQ.M TO THE EXISTING OVERALL FLOOR AREA OF CIRCA 1,035 SQ. M, (3) ROOFING WORKS ASSOCIATED WITH THE EXTENSIONS LISTED AT NO. 1 & NO. 2 AND REROOFING WORK ASSOCIATED WITH THE CHANGE TO THE OVERALL ROOF PROFILE AND SHAPE INCLUDING THE RAISED LEVEL OF PARTS OF THE EXISTING ROOF AND THE REMOVAL OF THE GABLE FACING WEST, DORMER WINDOWS FACING WEST AND EAST WITH THE CONTINUATION OF THE NEW PITCHED ROOF PROFILE OVER THE EXISTING CENTRAL FLAT ROOF SECTION, (4) AMENDMENTS TO THE FENESTRATION AND WALL FINISHES RESULTING IN AMENDED ELEVATIONS, (5) DETACHED SINGLE STOREY STORAGE BUILDING AND (6) SITE BOUNDARY WALLS, GENERAL SITE WORKS AND DRAINAGE
GLEBE , PORTNOO , LETTERKENNY PO
ERECTION OF AN EXTENSION TO THE SIDE AND REAR OF THE EXISTING DWELLING HOUSE, NEW DETACHED DOMESTIC GARAGE TO THE SIDE OF THE DWELLING HOUSE AND ASSOCIATED SITE WORKS
CLOGHER WEST , PORTNOO , CO. DONEGAL
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?