CONDITIONALDonegal - Donegal County Council
Proposed Development
(A) DEMOLITION OF EXISTING DISUSED OUTSHED AND (B) ERECTION OF COMMERCIAL STORAGE SHED
View the full application file on the council's planning portal →Application Timeline
Application received
19 Sept 2018
Further information requested
8 Nov 2018
Further information received
12 Dec 2018
Decision: CONDITIONAL
10 Jan 2019
Decision due
17 Jan 2019
Grant issued
13 Feb 2019
Application Details
- Location
- CARROWKEEL TD , KERRYKEEL AND CEATHEU CHAOL , LETTERKENNY PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.133 ha
Timeline
- Registration Date
- 19 September 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 January 2019
- Grant Date
- 13 February 2019
- Permission Expires
- 12 February 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
ERECTION OF AN EXTENSION TO FRONT ELEVATION OF EXISTING DWELLING AND CONNECTION TO EXISTING SEWER MAINS
NO. 9 ST. BRIGET'S TERRACE , CARROWKEEL , KERRYKEEL
CONSTRUCTION OF A DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS INCLUDING CONNECTION TO EXISTING PUBLIC FOUL SEWER AND WATER MAINS
KERRYKEEL , CARROWKEEL , LETTERKENNY PO
CONSTRUCTION OF AN EXTENSION TO FRONT AND REAR OF AN EXISTING DWELLING
6 ST BRIDGETS TERRACE , CARROWKEEL , KERRYKEEL
(1) DECOMMISSIONING OF THE EXISTING WASTEWATER TREATMENT PLANT STRUCTURES ADJACENT TO ST BRIDGET'S TERRACE, KERRYKEEL, (2) CONSTRUCTION OF A REPLACEMENT WASTEWATER TREATMENT PLANT ON THE SAME SITE COMPRISING STORM AND SLUDGE HOLDING TANKS, INLET PUMPING STATION, 1 NO. PRIMARY SETTLEMENT TANK, INLET SCREENING, 2 NO. ROTATING BIOLOGICAL CONTACTORS, 2 NO. FINAL SETTLEMENT TANKS, FERRIC DOSING UNIT, CONTROL KIOSK, ODOUR CONTROL UNIT, 1 NO. TOILET BLOCK, LIGHTING COLUMNS, TELEMETRY AERIAL, 2.4M HIGH BOUNDARY FENCE AND ANCILLARY WORKS, ACCESS VIA THE EXISTING SITE ENTRANCE, (3) CONSTRUCTION OF A NEW WASTEWATER PUMPING STATION AT A SITE ON MAIN STREET, KERRYKEEL COMPRISING AN UNDERGROUND STORAGE TANK, CONTROL KIOSKS, LIGHTING COLUMN, TELEMETRY AERIAL, 1.2M HIGH SITE BOUNDARY WALL AND FENCING, NEW ACCESS TO THE R246 PUBLIC ROAD, LANDSCAPING AND ANCILLARY WORK, (4) 470M OF TRANSFER PIPEWORK AND ANCILLARY WORKS FROM THE WASTEWATER PUMPING STATION TO THE WASTEWATER TREATMENT PLANT ALONG THE PUBLIC ROADS R246, R247 AND L-5412-1 AND (5) 86M OF PIPEWORK AND ANCILLARY WORKS FROM THE WASTEWATER TREATMENT PLANT TO THE DISCHARGE LOCATION ON THE BURNSIDE RIVER
KERRYKEEL ,
CHANGE OF DESIGN OF 3 NO. GLAMPING PODS AND REPOSITIONING OF SITE BOUNDARY FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 24/61733
CARROWKEEL , KERRYKEEL , LETTERKENNY PO
CONSTRUCTION OF 3 NO. GLAMPING PODS, ASSOCIATED PARKING AND CONNECTION TO EXISTING SERVICES
CARROWKEEL , KERRYKEEL , CO. DONEGAL
DEMOLITION OF 2 NO. EXISTING DWELLING HOUSES AND SHEDS AND CONSTRUCTION OF 3 NO. NEW DWELLING HOUSES WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKS
CARROWKEEL , KERRYKEEL , LETTERKENNY PO
DEMOLITION OF EXISTING DWELLING HOUSE AND GARAGE AND ERECTION OF A REPLACEMENT DWELLING HOUSE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
MILLTOWN , CARROWKEEL , LETTERKENNY PO
CONSTRUCTION OF SINGLE STOREY EXTENSION TO EXISTING FANNET PRESBYTERIAN CHURCH HALL INCLUDING CONNECTION TO EXISTING SERVICES
CARROWKEEL , KERRYKEEL , LETTERKENNY PO
CHANGE OF USE OF SHED TO RETAIL OUTLET AND ALL ASSOCIATED SITE WORKS
CARROWKEEL , LETTERKENNY , LETTERKENNY PO
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?