1851741

REFUSED

Donegal - Donegal County Council

Proposed Development

A TEN-YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30-YEAR OPERATIONAL LIFE (FROM THE DATE OF COMMISSIONING) CONSISTING OF (A) UP TO 7 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 150 METRES AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS, (B) 1 NO. ON-SITE ELECTRICAL SUB-STATION, (C) 1 NO. TEMPORARY CONSTRUCTION COMPOUND, (D) 1 NO. ANEMOMETRY MAST WITH A HEIGHT OF UP TO 100 METRES, (E) RECREATIONAL AMENITY TRAIL AND ASSOCIATED SIGNAGE, PARKING AND RECREATIONAL FACILITIES, (F) ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES TO THE PROPOSED ON-SITE SUBSTATION, (G) UPGRADING OF EXISTING ACCESS TRACKS AND PROVISION OF ANY NEW SITE ACCESS ROADS REQUIRED INCLUDING NEW SITE ACCESS ONTO THE LOCAL ROAD NETWORK IN THE TOWNLAND OF TULLYHORKY AND ASSOCIATED DRAINAGE, (H) EXCAVATION OF 1 NO. BORROW PIT AND (I) ALL ASSOCIATED SITE DEVELOPMENT WORKS (INCLUDING TREE FEELING). AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTED

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Nov 2018

  2. Decision due

    2 Jul 2019

  3. Decision: REFUSED

    18 Jul 2019

  4. Appeal submitted

    14 Aug 2019

  5. Appeal decided: REFUSED

    27 Nov 2020

Application Details

Location
BEHY , CASHELARD , TULLYHORKY AND DOOBALLY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
111 ha

Timeline

Registration Date
15 November 2018
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
18 July 2019

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-305163-19
Decision
REFUSED
Submitted
14 August 2019
Decided
27 November 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1.0km
1951221N/A12 Aug 2019

(A) DEMOLITION OF EXISTING FOOTINGS AND FOUNDATIONS OF DWELLING HOUSE DESTROYED BY FIRE AND FOR A REPLACEMENT DWELLING HOUSE ON PORTION OF EXISTING FOOTPRINT (B) ERECTION OF A SINGLE STOREY DOMESTIC GARAGE (C) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND PERMISSION FOR THE INSTALLATION OF A SECONDARY AND TERTIARY TREATMENT SYSTEM AND DISCHARGE TO A DISPOSAL/DISTRIBUTION PAD (D) TO ALTER AND WIDEN THE EXISTING SITE ENTRANCE ONTO THE PUBLIC ROAD, INCLUSIVE OF ALL ASSOCIATED SITE WORKS

DOOBALLY , BALLYSHANNON , DONEGAL PO

1.0km
1951309CONDITIONAL27 Aug 2019

(A) DEMOLITION OF EXISTING FOOTINGS AND FOUNDATIONS OF DWELLING HOUSE DESTROYED BY FIRE & FOR CONSTRUCTION OF REPLACEMENT DWELLING HOUSE ON PORTION OF EXISTING FOOTPRINT (B) ERECTION OF A SINGLE STOREY DOMESTIC GARAGE (C) DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF A SECONDARY AND TERTIARY TREATMENT SYSTEM AND DISCHARGE TO A DISPOSAL/DISTRIBUTION PAD AND ALTERATION AND WIDENING OF EXISTING SITE ENTRANCE ONTO THE PUBLIC ROAD, INCLUSIVE OF ALL ASSOCIATED SITE WORKS

DOOBALLY , BALLYSHANNON , DONEGAL PO

1.1km
2350873CONDITIONAL20 Jun 2023

ERECTION OF A DWELLING HOUSE AND INSTALLATION OF A SEPTIC TANK, REED BED AND TERTIARY WETLAND AREA

BEHY , BALLYSHANNON , DONEGAL PO

1.6km
2350892CONDITIONAL23 Jun 2023

(1) A 38KV UNDERGROUND CABLE GRID CONNECTION APPROXIMATELY 9KM IN LENGTH FROM THE CONSENTED DERRYKILLEW COMMUNITY WIND FARM (AN BORD PLEANÁLA REF. NO. 307520, DONEGAL COUNTY COUNCIL REF. NO. 19/51750) TO LANDS AT TOWNPARKS, NORTH OF THE EXISTING CATHALEEN'S FALL 110KV SUBSTATION IN BALLYSHANNON, (2) A PARTIAL SECTION OF A 38KV OVERHEAD LINE GRID CONNECTION CROSSING 130M OVER THE RIVER ERNE AT CATHALEEN'S FALL, BALLYSHANNON, AND (3) THE DERRYKILLEW COMMUNITY WIND FARM 38KV SUBSTATION AND A BATTERY ENERGY STORAGE SYSTEM. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ACCOMPANIES THIS APPLICATION

DERRYKILLEW , CORLEA CASHELARD , DOOBALLY KNADER & TOWNPARKS BALLYSHANNON

1.6km
1750150REFUSED6 Feb 2017

ERECTION OF AN EXTENSION TO SIDE OF EXISTING DWELLING HOUSE, DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF NEW SECONDARY AND TERTIARY WASTE WATER TREATMENT SYSTEM WITH DISPOSAL FILTER AREA

CASHELARD , BALLYSHANNON , DONEGAL PO

1.6km
1750749CONDITIONAL16 May 2017

ERECTION OF AN EXTENSION TO SIDE OF EXISTING DWELLING HOUSE, DECOMMISSIONING EXISTING SEPTIC TANK SYSTEM AND INSTALLATION OF NEW SECONDARY AND TERTIARY WASTE WATER TREATMENT SYSTEM WITH DISPOSAL FILTER AREA

CASHELARD , BALLYSHANNON , DONEGAL PO

1.7km
2561071REFUSED25 Jun 2025

(1) ERECTION OF A MACHINERY SHED AND (2) UPGRADE OF EXISTING SEPTIC TANK SYSTEM IN EXISTING BUILDERS YARD

KNADER , BALLYSHANNON , DONEGAL PO

1.8km
2151710CONDITIONAL26 Aug 2021

ERECTION OF DWELLING HOUSE SERVICED BY EFFLUENT TREATMENT SYSTEM AND POILISHING FILTER & ALL ASSOCIATED SITE WORKS

CASHELARD , BALLYSHANNON , CO DONEGAL

1.9km
2461080CONDITIONAL16 Jul 2024

ERECTION OF A DWELLING HOUSE, EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER

CASHELARD , BALLYSHANNON , DONEGAL PO

2.0km
2051118CONDITIONAL14 Aug 2020

CONSTRUCTION OF AN EXTENSION TO THE FRONT AND SIDE OF EXISTING DWELLING HOUSE ALONG WITH ELEVATIONAL CHANGES AND ALL ASSOCIATED SITE WORKS

BEHY , BALLYSHANNON , DONEGAL PO

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?