The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

185365

N/A

Cork - Cork City Council

Proposed Development

Retention of (a) an existing sand based playing pitch with ancillary fencing and 6 no. 9 metre high floodlights; (b) 5 no. existing storage containers, (c) the existing club shop with associated timber fencing, (d) an existing Porta Cabin which currently functions as a driving test centre with associated timber fencing; (e) timber fencing and decking serving the existing club house; (f) the existing changing room building with ancillary access ramp and railings (change of plan from permitted under application reference 03/1903).

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 May 2018

  2. Decision due

    19 Jul 2018

Application Details

Location
Tanner Park , Coolroe , Ballincollig
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork City Council

Timeline

Registration Date
25 May 2018
Status
INCOMPLETED APPLICATION
Decision
N/A
Decision Due
19 July 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
184886N/A11 Apr 2018

Retention of (a) 6 no. 9 meter high floodlights which light an existing sand based playing area, (b) 5 no. existing storage containers, (c) the existing club shop with associated timber fencing, (d) an existing Porta Cabin which currently functions as a driving test centre with associated timber fencing; (e) timber fencing and decking serving the existing club house.

Tanner Park , Coolroe , Ballincolllig

0m
185613CONDITIONAL21 Jun 2018

Retention of (a) an existing sand based playing pitch with ancillary fencing and 6 no. 9 metre high floodlights, (b) 5 no. existing storage containers, (c) the existing club shop with associated timber fencing, (d) the existing porta cabin which currently functions as a driving test centre with associated timber fencing, (e) timber fencing and decking serving the existing club house, (f) the existing changing room building with ancillary access ramp and railings (change of plan from permitted under application reference 03/1903).

Tanner Park , Coolroe , Ballincollig

25m
184820N/A4 Apr 2018

Temporary construction of a single storey prefab educational building (containing 3no. classrooms with administration and ancillary rooms) and all associated site works including hardcore surfacing (938sq.m) of an existing sand based training pitch to front of proposed building, and retention of existing tarmac playing surface (300sq.m) and perimeter fencing to side of proposed building.

Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe

25m
185211N/A11 May 2018

Temporary construction of a single storey prefab educational building (containing 3no. classrooms with administration and ancillary rooms) and all associated site works including hardcore surfacing (938sq.m) of an existing sand based training pitch to front of proposed building, and retention of existing tarmac playing surface (300sq.m) and perimeter fencing to side of proposed building.

Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe

25m
185489CONDITIONAL7 Jun 2018

Temporary construction of a single storey prefab educational building (containing 3no. classrooms with administration and ancillary rooms) and all associated site works including hardcore surfacing (938sq.m) of an existing sand based training pitch to front of proposed building, and retention of existing tarmac playing surface (300sq.m) and perimeter fencing to side of proposed building.

Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe

28m
1938973CONDITIONAL17 Dec 2019

Permission for temporary construction of a single storey prefab educational extension (containing 2 no. classrooms and ancillary rooms) and all associated site works.

Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe

35m
2241569CONDITIONAL18 Nov 2022

Permission for temporary construction of a prefab educational modular building extension (containing 2 no. classrooms and ancillary rooms) over existing ground floor prefab educational modular building (creating a first floor), with a prefab modular two-storey stair core extension to side and all associated site works.

Gaelscoil and Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe

35m
2443088CONDITIONAL12 Jul 2024

Permission for retention for temporary construction of a single and two-storey prefab educational building (containing 9 no. classrooms with administration and ancillary spaces), 2 no. bicycle shelters and all associated site works.

Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe

35m
2140039CONDITIONAL29 Mar 2021

Permission for temporary construction of a single storey prefab educational extension (containing 2 no. classrooms and ancillary rooms) and all associated site works and permission for retention for temporary construction of a single storey prefab educational building (containing 3 no. classrooms with administration and ancillary rooms).

Gaelscoil an Chaisleain , Ballincollig Rugby Club , Tanner Park Coolroe

56m
2341851CONDITIONAL22 Mar 2023

Permission for the construction of a club gym, single-storey extensions to the side, rear and front of the existing clubhouse and all ancillary site works at Tanner Park, Coolroe, Ballincollig, Cork. The proposed development provides for the reorganisation of the existing carpark requiring alterations to an existing pitch, the modification of the existing vehicular entrance to provide for new footpaths and the alteration of the existing roadside boundary to facilitate the widening and upgrading of the existing pedestrian entrance from the R608. The proposed development includes the erection of a single-storey coffee pod, provision of bicycle parking and the replacement of the existing club signage with a LED Screen sign.

Tanner Park , Coolroe , Ballincollig

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?