The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

18600039

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

construction of a dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Jan 2018

  2. Decision: CONDITIONAL

    13 Mar 2018

  3. Decision due

    15 Mar 2018

  4. Grant issued

    17 Apr 2018

Application Details

Location
Blean , Toomevara , Co. Tipperary
Applicant
N/A
Application Type
OUTLINE PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.365 ha
Floor Area
1 sq m
Residential Units
1

Timeline

Registration Date
19 January 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 March 2018
Grant Date
17 April 2018
Permission Expires
16 April 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
18601499CONDITIONAL19 Dec 2018

the construction of a dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works (Planning Permission Ref. 18600039)

Blean , Toomevara , Co. Tipperary

11m
2260638CONDITIONAL22 Nov 2022

(1) revised boundary between the properties; (2) a domestic storage shed over existing concrete slab on Noel Kenneally’s side of the new boundary

Blean , Toomevara , Co Tipperary

53m
17600540CONDITIONAL16 May 2017

renovation and extension to existing house and upgarde existing waste water treatment system along with all ancillary site works

Blean , Toomevara

57m
17600443N/A28 Apr 2017

renovation and extend existing house and upgrade existing waste water system along with all ancillary site works

Blean , Toomevara

252m
17600150CONDITIONAL17 Feb 2017

a two storey dwellinghouse, detached domestic garage and store, septic tank and percolation area, alterations to the existing shared entrance from the public road, together with associated site works

Ballybeg , Toomevara , Nenagh

257m
17600350CONDITIONAL6 Apr 2017

to construct a slatted shed with concrete yard and associated works

Ballybeg , Toomevara , Nenagh

259m
17600272N/A21 Mar 2017

construction of a slatted shed with concrete yard and associated works

Ballybeg , Toomevara

470m
22303CONDITIONAL21 Apr 2022

a biomass storage silo

Glenawinna , Toomevara , Nenagh

710m
19601168N/A22 Oct 2019

construction of dwelling house, entrance, waste water treatment system percolation area and all associated site works

Curraghaneety , Toomevara

723m
21313CONDITIONAL12 Mar 2021

part two storey, part single storey dwelling house, detached domestic garage, store and home gym, onsite wastewater treatment system, borewell, entrance and boundary treatment, together with associated site works

Ballybeg , Toomevara , Nenagh

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?