18600322
CONDITIONALTipperary - Tipperary County Council
Proposed Development
demolition of an existing building (toilets, shop and office) and permission to complete the re-construction of a new replacement structure (toilets, shop and office) and all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
15 Mar 2018
Further information requested
8 May 2018
Further information received
4 Jan 2019
Decision: CONDITIONAL
30 Jan 2019
Decision due
3 Feb 2019
Grant issued
6 Mar 2019
Application Details
- Location
- Derg Marina , Ballina , Co Tipperary
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Tipperary County Council
- Site Area
- 1.62 ha
Timeline
- Registration Date
- 15 March 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 January 2019
- Grant Date
- 6 March 2019
- Permission Expires
- 5 March 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the removal of two existing roof lights to the rear of the dwelling at first floor level and the installation of a new dormer window in their place, together with all ancillary site works
2 Lakeside Cottages , Cullenagh Ballina , Co. Tipperary
to retain partially constructed extension to the rear of house and permission for to complete partially constructed extension to the rear of house and to construct a garage attached to the gable end of house and construct a dormer window to the rear of house and alter size of existing rear kitchen window and all associated site works
1 Derg Marine Village , Ballina , Co. Tipperary
partially constructed extension to the rear of the house, permission for completion of partially constructed extension to the rear of the house and to construct a garage attached to the gable end of the house, a dormer window to the rear of the house and alter size of existing rear kitchen window and all associated site works
1 Derg Marine Village , Ballina , Co. Tipperary
retaining and completion of partially constructed extension to the rear of house and for PERMISSION to construct a garage attached to the gable end of house and construct a dormer window to the rear of house and alter size of existing rear kitchen window and all associated site works
1 Derg Marine Village , Ballina , Co. Tipperary
installation of dormer window/door, rooflights, conversion of attic space to habitable accommodation, together with all associated site and incidental works
2 Marine Village , Ballina , Tipperary
replacement of old sub-standard lighting system at the site, along with the addition of a number of new lamp standards and led lighting, including low level bollard lighting and under deck access safety lighting
Lough Derg Marina , Ballina
construction of a one and a half storey dwelling house, entrance and all other ancillary site works
Lakeside Drive , Cullenagh , Ballina Co. Tipperary
a first-floor extension to the house to include a new raised roof with velux windows to the front and dormer gables to the rear accommodating two bedrooms, a bathroom, study and attic storage
4 Marine Village , Ballina , Co. Tipperary
to renovate and extend existing dwelling along with all ancillary site works
33 Marine Village , Ballina , Co. Tipperary
(a) the crèche within the hotel building and (b) car and bus parking facility, refuse collection area together with associated ancillary site development works on that part of the hotel site to the North-East of the local road L6090
Lakeside Hotel , Cullenagh , Ballina