18600584
CONDITIONALTipperary - Tipperary County Council
Proposed Development
retention permission (previously granted under register reference 12/67 for a temporary 5 year period which has expired) for existing 30m high multi-operator telecommunications support structure carrying associated telecommunications equipment, and associated equipment cabinets and cabin and permission for a 2.4m high fence.The development will continue to form part of existing and future telecommunications and broadband networks
View the full application file on the council's planning portal →Application Timeline
Application received
9 May 2018
Decision: CONDITIONAL
29 Jun 2018
Decision due
3 Jul 2018
Grant issued
3 Aug 2018
Application Details
- Location
- Aughnagomaun , Horse and Jockey , Co Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 9 May 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 29 June 2018
- Grant Date
- 3 August 2018
- Permission Expires
- 2 August 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
retention permission (previously granted under register reference 12/67 for a temporary 5 year period which has expired) for existing 30m high multi operator telecommunications support structure carrying and associated telecommunications equipment and associated equipment cabinets and cabin within a fenced compound at Aughnagomaun, Horse and Jockey
Aughnagomaun , Horse and Jockey , Co. Tipperary
(previously granted under register reference 12/67) for a temporary 5 year period which has expired) for existing 30m high multi-operator telecommunications support structure carrying associated telecommunications equipment, and associated equipment cabinets and cabin within a fenced compound, the development will continue to form part of existing and future telecommunications and broadband networks
Aughnagomaun , Horse & Jockey , Co. Tipperary
the establishment and operation of an enclosed limestone processing facility (area 600 sq. metres and max. height 30 metres), and associated ancillary infrastructure on a 0.8 hectare site within the existing quarry landholding. The development will include the lowering of existing ground levels by c. 7 meters.
Killough Hill , Gaile , Holycross
development comprising the establishment and operation of an enclosed limestone processing facility (area 600 sq. metres and max. height 30 metres) and associated ancillary infrastructure on a O.S. hectare site within the existing quarry landholding. The development will include the lowering of existing ground levels by c.7 meters
Killough Hill , Gaile , Holycross
the construction of a proposed two storey dwelling, new entrance, septic tank and percolation area, connection to water mains supply and all associated works
Aughnagomaun , Ballytarsna , Cashel
undertaking the repair and upgrading of an existing 3 bedroom farmhouse, construct a two storey extension and incorporate an existing stone barn to create an enlarged family residence. The development will include landscaping, site services, the replacement of an existing septic tank and existing percolation area, the creation of a new road entrance and property, boundary works
Aughnagomaun , Horse and Jockey , Thurles
to repair and upgrading of a 3 bedroom farmhouse, construct a two storey extension and incorporate an existing stone barn to include landscaping, new site services, the repair and maintenance of the existing waste water treatment system and the creation of a new road entrance and boundary work to their property
Carignan House , Aughnagomaun , Horse and Jockey
new entrance to my farm
Aughnagomaun , Cashel , Co. Tipperary
new entrance to my farm
Aughnagomaun , Cashel , Co. Tipperary
new entrance to my farm
Aughnagomaun , Cashel , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?