The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

18600813

N/A

Tipperary - Tipperary County Council

Proposed Development

1. ) 50sqm of additional retail floor space over planning permission 10/510481, bringing the total retail area of the as constructed commercial unit 2 to c. 150sq.m and 2) minor miscellaneous elevational issues and ancillary site works associated with the above

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Jun 2018

  2. Application withdrawn

    19 Nov 2018

Application Details

Location
Limerick Road , Portryan , Newport
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
0.66 ha

Timeline

Registration Date
28 June 2018
Status
WITHDRAWN
Decision
N/A
Withdrawn
19 November 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
201489CONDITIONAL11 Dec 2020

placement of a pay-to-use portable waste compactor for the acceptance of residual and food waste and a pay-to-use portable compactor for mixed recyclables. The activity requires the developers to possess a waste collection permit/certificate of registration

Ryan's Centra , Portryan Limerick Road , Newport

50m
201324N/A11 Nov 2020

placement of a pay-to-use portable waste compactor for the acceptance of residual and food waste and a pay-to-use portable compactor for mixed recyclables

Ryan's Centra , Portryan Limerick Road , Newport

174m
17600094CONDITIONAL6 Feb 2017

a new single storey extension to the side of the existing dwelling and associated ancillary site works

86 Mulcaire Manor , Newport , Co. Tipperary

180m
21334CONDITIONAL18 Mar 2021

extension to the rear and side of an existing dwelling and all associated site works

No 9 Mulcair Manor , Newport , Co. Tipperary

242m
17601257N/A16 Nov 2017

Installation of a 3m high 'lamp post' style relief vent stack servicing the existing above ground natural gas pressure reduction unit with all ancillary services and associated site works

Newport DRI , Church Road , Newport

242m
17601289CONDITIONAL23 Nov 2017

to install a 3m high 'lamp post' style relief vent stack servicing the existing above ground natural gas pressure reduction unit with all ancillary services and associated site works

Newport DRI , Church Road , Newport

252m
2470CONDITIONAL28 Mar 2024

an extension to the front of premises consisting of a kitchen extension and a new day room

Newport , Co Tipperary

309m
2561051N/A20 Oct 2025

the construction of a new extension to the southeast of the existing school building, to the rear of the existing sports hall. The extension will be part single and part two storey and will be attached to the existing school building. The additional accommodation will include a 2 class base special education needs unit, graphics room, 2 no. science laboratories, home economics room, 3 no. general classrooms, staff office, sanitary accommodation, ancillary rooms, plant and stores. Minor works are proposed to the existing building to facilitate the new extension to include façade and layout changes in the vicinity of the connection to the new extension. The works will include the provision of landscaped courtyard and play spaces adjoining the new extension, amendments to the existing road and landscape layouts to support the new extension, 6 no. additional carparking spaces and all ancillary works

Church Road , Newport , Co. Tipperary

314m
20810CONDITIONAL24 Jul 2020

a timber structure at the rear of the house consisting of games room, store, utility room and toilet. Also permission for a new concrete block front and side boundary walls with a new metal sliding entrance gate

No 55 Mulcair Manor , Newport , Co. Tipperary

320m
19600901N/A16 Aug 2019

construction of a 1 metre high plastered and capped concrete block wall to the front, this boundary wall will include the provision for a single panel automatic sliding gate

No 55 Mulcaire Manor , Newport , Co Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?