The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

18600833

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

to construct a) a single storey extension to the side and back of house and (b) new window at ground floor level on the East Elevation with internal alterations

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Jul 2018

  2. Decision: CONDITIONAL

    23 Aug 2018

  3. Decision due

    26 Aug 2018

  4. Grant issued

    27 Sept 2018

Application Details

Location
No 25 Ard Na Coillte , Ballina , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.037 ha

Timeline

Registration Date
2 July 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 August 2018
Grant Date
27 September 2018
Permission Expires
26 September 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
18600682N/A31 May 2018

(a) a single storey extension to the side and back of house and (b) new window at ground floor level on the East Elevation with internal alterations

No 25 Ard na Coillte , Ballina , Co Tipperary

14m
2360242CONDITIONAL14 Apr 2023

single storey rear and side extension which incorporates the existing garage and change of use of domestic garage to residential use, hard and soft landscaping with all ancillary site works

26 Árd Coillte , Ballina , Co. Tipperary

18m
2360210N/A30 Mar 2023

alteration and extension, consisting of a single storey rear and side extension, hard and soft landscaping, together will all ancillary site works

26 Árd Coillte , Ballina , Co. Tipperary

36m
19600949CONDITIONAL28 Aug 2019

the construction of a new entrance porch under the existing balcony, enclosing the first floor balcony to form a study, removal of the existing fireplace and chimney to install a new patio door, removal of the kitchen door to install a new window all to side elevations, installation of a new flue, together with all other associated site works

12 Willow Cliff , Ballina , Co. Tipperary

42m
19600850N/A30 Jul 2019

construction of a new entrance porch under the existing balcony, enclosing the first floor balcony to form a study, installation of a new patio door to the side elevations, removal of the kitchen door and installation of new window to the side elevation, removal of existing fireplace and chimney and installation of stove flue, together with all other associated site works

12 Willowcliff , Ballina , Co Tipperary

47m
19600871N/A8 Aug 2019

the construction of a new entrance porch under the existing balcony, enclosing the first floor balcony to form a study, removal of the existing fireplace and chimney to install a new patio door, removal of the kitchen door to install a new window all to side elevations, installation of a new flue, together with all associated site works

12 Willowcliff , Ballina , Co. Tipperary

70m
17601357REFUSED8 Dec 2017

construction of the final phase of the Ard Coillte housing development, approved under planning references 07/51/0573 & 08/51/0300 and extension of duration references 13/51/0027 & 13/51/0028. This phase of the development consists of 10 detached houses, 4 garages, connection to the public services, roads, footpaths, open space areas & ancillary site development works

Ard Coillte , Ballina , Co. Tipperary

70m
2431REFUSED23 Feb 2024

construction of the final phase of the Ard Coillte housing development, approved under planning references 07/51/0573 & 08/51/0300 and extension of duration references 13/51/0027 & 13/51/0028. This phase of the development consists of 10 detached houses, 4 garages, connection to the public services, roads, footpaths, open space areas & ancillary site development works

Ard Coillte , Ballina , Co. Tipperary

72m
2460546CONDITIONAL4 Jul 2024

construction of 9 detached houses, 1 garage and ancillary site works

Ard Coillte , Ballina , Co Tipperary

104m
17600955CONDITIONAL30 Aug 2017

and completion of variations to the layout of house No 16 approved under planning reference 07510573 & extension of duration reference 13510027, together with minor alterations to the spine road adjacent to house No 15 and associated site development works

Ard Coillte , Ballina

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?