18617

CONDITIONAL

Waterford - Waterford City and County Council

Proposed Development

Retention of 1 no. Silage Pit, Demolition of 4 no. existing silage pits, Demolition of a section of existing milking parlour, Construction of 3 no. Silage Pits, Construction of modifications to existing farmyard entrance, Construction of a milking parlour, ancillary rooms, livestock waiting yard, handling facilities and underground slatted tank. Erection of meal bin and water storage tank and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Sept 2018

  2. Decision: CONDITIONAL

    30 Oct 2018

  3. Decision due

    5 Nov 2018

  4. Grant issued

    12 Dec 2018

Application Details

Location
Ballymulalla West , Dungarvan , Co. Waterford
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Waterford City and County Council

Timeline

Registration Date
11 September 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
30 October 2018
Grant Date
12 December 2018
Permission Expires
11 December 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

652m
2360468CONDITIONAL5 Oct 2023

two Storey Dwelling House, entrance, septic tank, percolation area and all ancillary site works at Ballymulalla East, Cappagh, Co. Waterford

Ballymulalla East , Cappagh , Co. Waterford

717m
211231CONDITIONAL23 Dec 2021

construct a two-storey dwelling and garage, entrance and driveway, wastewater treatment plant and percolation area, with a bore hole, landscaping and all ancillary site works

Ballymullala East , Cappagh , Dungarvan

722m
203CONDITIONAL3 Jan 2020

to construct a slatted slurry tank in existing shed and all ancillary site works

Ballymulalla West , Cappagh , Co. Waterford

927m
2560285CONDITIONAL1 May 2025

Two storey dwelling house, garage, entrance, septic tank and percolation area and all ancillary site works.

Ballymulalla East , Cappagh , Co. Waterford.

1.0km
21734CONDITIONAL28 Jul 2021

construct a split level single storey dwelling house, the installation of a domestic wastewater treatment system, new site entrance with walls and piers and all associated site works

Clonkerdon , Cappagh , Dungarvan

1.1km
21907CONDITIONAL27 Sept 2021

construction of a new two storey dwelling, garage, new access driveway, new site entrance, wastewater treatment system and percolation area and all ancillary works

Cool/Ballynameelagh , Cappagh , Co. Waterford

1.1km
19347N/A22 May 2019

development of Knocknamona Windfarm Grid Connection (KWF Grid Connection) development which comprises; a)1940m of underground medium voltage electrical cabling(up to 33kV), in Keereen Upper & Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) & Woodhouse 110kV Substation(operational). b) Works within the existing Woodhouse 110kV Substation compound in Keereen Upper, comprising a new control building 5.3m x 3.6m & 4.6m high; main 110kV transformer c6m in height, with associated plinth and bund; a 110kV transformer bay; 2no. lightening masts 17.5m in height & ancillary electrical equipment. Works will also include a new access track 17m long & 4.5m in width; additional palisade gateway 4.9m wide & 2.6m in height with palisade fencing within the compound & 2 no. gateways in the existing perimeter fence. The fencing & gateways will be same height & width as the existing fence & gates; c) A Link Road, 190m in length & 4.5m in width connecting the existing forestry road network at Knocknamona Windfarm to the existing Woodhouse Windfarm roads. It is proposed to use this link road & the existing Woodhouse Windfarm roads to facilitate the delivery of the main components to Knocknamona Windfarm. d) The widening of 960m of existing forestry road by 1m, in Knocknamona townland to facilitate the delivery of the main components to Knocknamona Windfarm &; e) Ancillary site works. An Environmental Impact Assessment Report & Appropriate Assessment Report (Stage 1 Screening) have been prepared in respect of this application.

Keereen Upper/Woodhouse or Tinakilly/Knocknamona Townlands , Dungarvan , Co. Waterford

1.1km
19369CONDITIONAL31 May 2019

development of Knocknamona Windfarm Grid Connection (KWF Grid Connection) development which comprises; a)1940m of underground medium voltage electrical cabling(up to 33kV), in Keereen Upper & Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) & Woodhouse 110kV Substation(operational). b) Works within the existing Woodhouse 110kV Substation compound in Keereen Upper, comprising a new control building 5.3m x 3.6m & 4.6m high; main 110kV transformer c6m in height, with associated plinth and bund; a 110kV transformer bay; 2no. lightening masts 17.5m in height & ancillary electrical equipment. Works will also include a new access track 17m long & 4.5m in width; additional palisade gateway 4.9m wide & 2.6m in height with palisade fencing within the compound & 2 no. gateways in the existing perimeter fence. The fencing & gateways will be same height & width as the existing fence & gates; c) A Link Road, 190m in length & 4.5m in width connecting the existing forestry road network at Knocknamona Windfarm to the existing Woodhouse Windfarm roads. It is proposed to use this link road & the existing Woodhouse Windfarm roads to facilitate the delivery of the main components to Knocknamona Windfarm. d) The widening of 960m of existing forestry road by 1m, in Knocknamona townland to facilitate the delivery of the main components to Knocknamona Windfarm &; e) Ancillary site works. An Environmental Impact Assessment Report & Appropriate Assessment Report (Stage 1 Screening) have been prepared in respect of this application.

Keereen Upper/Woodhouse or , Tinakilly/Knocknamona Townlands , Dungarvan

1.1km
2360416CONDITIONAL8 Sept 2023

for development comprising of : a) 1940m of underground electrical cabling in Keereen Upper and Knocknamona townlands, linking Knocknamona Windfarm (to be constructed) to the Woodhouse Substation (operational). b) Works within the existing Woodhouse Substation compound in Keereen Upper, comprising a new control building 5.3m X 3.8m and 4.6m high; a 110kV electrical transformer c.6m in height, with associated plinth and bund; an electrical transformer bay; 2 No. lightening masts 17.5m in height and ancillary electrical equipment. Works within the Woodhouse Substation compound will also include a new access track 17m long and 4.5m in width; additional palisade gateway 4.9m wide and 2.6m in height with palisade fencing within the compound and 2 No. gateways in the existing perimeter fence. c) A Link Road, 190m in length and 4.5m in width connecting the existing forestry road network at Knocknamona Windfarm to the existing Woodhouse Windfarm access roads. It is proposed to use this Link Road and the existing Woodhouse Windfarm access roads to facilitate the delivery of turbine components to Knocknamona Windfarm. d) The widening of 960m of existing forestry road by 1m, in Knocknamona townland to facilitate the delivery of turbine components to Knocknamona Windfarm and;e) all ancillary site works.

Keereen Upper Woodhouse or Tinakilly and Knocknamona , Dungarvan , County Waterford

1.1km
1727N/A20 Jan 2017

for single storey dwelling house, entrance, septic tank, percolation area and ancillary works

Ross , Cappagh , Co Waterford

Planning a project of your own?