The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

18633

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

the construction of a slatted shed and concrete aprons

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Jun 2018

  2. Decision due

    16 Aug 2018

  3. Decision: CONDITIONAL

    16 Aug 2018

  4. Grant issued

    19 Sept 2018

Application Details

Location
Upper Athea , Athea , Co. Limerick.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council

Timeline

Registration Date
22 June 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
16 August 2018
Grant Date
19 September 2018
Permission Expires
18 September 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

522m
221359CONDITIONAL16 Dec 2022

the construction of a 2 bedroom single storey dwelling, proprietary wastewater treatment system, entrance and all ancillary services

Park , Athea , Co. Limerick

579m
17254CONDITIONAL23 Mar 2017

to construct a storey and a half style dwelling house, detached domestic garage, front boundary entrance walls, installation of a mechanical aeration unit and soil/polishing filter system with all associated site works

Athea Upper , Athea , Co Limerick

764m
2660215CONDITIONAL27 Feb 2026

Notice for Renewable Energy Directive III (RED III) Development - 10 year Permission for development of a Long Duration Energy Storage (LDES) facility at this site within the townland of Athea Upper, Athea, Co. Limerick. The development will consist of: (a) removal of selected items of existing grid support equipment and plant at the Kilathmoy wind farm substation (2 no battery containers and associated inverters, transformers and HVAC units, diesel generator and associated diesel tank, pre-fabricated electrical containers, sections of compound security fencing), and (b) construction of a Long Duration Energy Storage (LDES) facility containing a Battery Energy Storage System (BESS) compound consisting of BESS units, (approximately 5m in height) with associated HVAC units, transformers, inverters; underground cabling; 1 no pre-fabricated communications and control container; lighting, CCTV, lightning masts; diesel generator and associated diesel tank; water storage tanks (approximately 3.6m in height); store containers; securing fencing, internal access track and access gates and all associated ancillary works including drainage, earthworks and retaining structures necessary to facilitate the development The application will replace the previously consented (but unbuilt) BESS facility granted under planning ref (21/1702). A 10 year permission is being sought in respect of the development. A Natura Impact Statement has been prepared as part of the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Kilathmoy Substation , Athea Upper , Athea Co. Limerick

768m
171228CONDITIONAL21 Dec 2017

a 10 year planning permission for the laying of 4.4 km of underground electrical cables, associated ducting, associated cable draw pits, electrical cabinets, excavation/trenching works, provision of a new substation compound with a single storey substation building and associated services. The underground electrical cable route is primarily on public road with a section on other road. Details of the underground cables and extent of the works are shown on the planning application drawings. The proposed underground electricity cable will connect the permitted Beennanaspuck Wind Farm (Kerry County Council Planning Ref. 14/571; An Bord Pleanala Ref. PL08.245464) and permitted Toberatooreen Wind Farm (Kerry County Council Planning Ref. 12/431 and 14/854; An Bord Pleanala Planning Ref. PL08.242170), which are located in County Kerry, to the National Electricity Grid via the Athea substation in County Limerick

Athea Upper , Athea , Co. Limerick.

770m
18934CONDITIONAL25 Sept 2018

a 10 year planning permission for the laying of 4.85km of underground electrical cables, associated ducting, associated cable draw pits, associated electrical infrastructure, and excavation/trenching works. The underground electrical cable route is primarily on public road with sections on other road and through pastureland. Details of the underground cables and extent of the works are shown on the planning application drawings. The proposed underground electricity cable will connect the permitted Beennanaspuck Wind Farm (Kerry County Council Planning Ref. 14/571; An Bord Pleanala Planning Ref. PL08.245464) and permitted Toberatooreen Wind Farm (Kerry County Council Planning Ref. 12/431 and 14/854; An Bord Pleanala Planning Ref. PL08/242170), which are located in County Kerry, to the National Electricity Grid via the Athea substation in County Limerick (Limerick City and County Council Planning Ref. 17/1228). The provision of a new substation compound with a single storey substation building and associated services. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS)

Athea Lower & Athea Upper , Athea , Co. Limerick.

803m
211702CONDITIONAL8 Dec 2021

an extension of the existing battery energy storage system (BESS) at Kilathmoy Wind Farm substation. The proposed development will consist of the following components; Lithium-ion battery containers including ancillary HVAC equipment; Power Conversion System (PCS)/Inverter units; Transformer units; Connection to the existing on site Grid Transformer, Prefabricated equipment container (switchgear and controls), back up generator, auxiliary transformer, underground cabling and associated infrastructure including compound lighting, security fencing and CCTV system, all as detailed on the planning application drawings. A Natura Impact Statement(NIS) has been completed and submitted with this application

Kilathmoy Wind Farm Athea Upper , Athea , Co. Limerick.

1.2km
23379CONDITIONAL6 Apr 2023

CONSTRUCT A SLATTED SLURRY TANK WITH SOLID SLABS, AGITATION POINTS AND SCRAPER SLATS TO REPLACE OPEN SLURRY TANK AND ALL ANCILLARY SITE WORKS

KINGSLAND , ABBEYFEALE , CO KERRY

1.3km
2360285CONDITIONAL6 Nov 2023

TO RETAIN A VEHICULAR ENTRANCE TO HIS DWELLING HOUSE AND ASSOCIATED SITE WORKS

KINGSLAND HOUSE , KINGSLAND , ABBEYFEALE

1.7km
2460768CONDITIONAL1 Aug 2024

the demolition of an existing rear extension and boiler house, construction of a new rear two-storey extension on to the existing dwelling house, infill the existing front porch area, elevational changes and internal alterations to the existing dwelling house, decommission of an existing septic tank and install a new mechanical aeration unit and filtration system and all associated site works

Athea Upper , Athea , Co. Limerick

1.7km
2360306CONDITIONAL12 May 2023

an easy feed slatted unit complete with lie-back area, slatted underground slurry tank, canopy, ancillary concrete and manure pit and all ancillary site works

Athea Upper , Athea , Co.Limerick

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?