186404
N/ACork - Cork City Council
Proposed Development
Construction of dwellinghouse with associated site entrance and all associated and ancillary site works
View the full application file on the council's planning portal →Application Timeline
Application received
11 Sept 2018
Application withdrawn
9 May 2019
Application Details
- Location
- Site No. 1 Tuairin Glas , Greenfield , Ballincollig
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 11 September 2018
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 9 May 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for retention of elevation changes to existing dwelling as constructed, previously permitted under planning reference no. 19/38534.
Suaimhneas , Greenfield , Ballincollig
Permission for the construction of a new dwelling house with associated site entrance and all associated and ancillary site works.
Site No.1 Tuairin Glas , Greenfields , Ballincollig
Permission to construct a two storey dwelling and garage with associated site works
Greenfields , Ballincollig , Co. Cork
Construct a two storey dwelling with garage and a new entrance
Greenfield , Ballincollig , Co. Cork
Construct a dwelling house and garage with related site works.
Greenfield , Ballincollig , Co. Cork
Retention permission is sought for (1) construction of dwelling, (as built) (2) extensions to the side and rear , (3) a car port, (4) wastewater treatment system (5) and all associated site development works
Hillview Greenfield , Ballincollig , Co Cork
Permission to construct a single-storey extension/'Granny Flat' to the rear of existing dwelling.
48 Tuairin Glas , Greenfield , Ballincollig
Permission to construct a single-storey extension to rear and two-storey extension with attic conversion to side of dwellinghouse and alterations of existing dwellinghouse.
No.2 Woodberry , Greenfields , Ballincollig
Construction of single storey porch extension to front, single storey extension to the rear and alterations to ground floor rear elevation of dwelling and associated site works
33 Woodberry , Greenfields , Ballincollig
The construction of a steel frame garden structure with a retractable PVC fabric awning/roof used to shelter to trampoline location in the garden of their dwelling.
43 Woodberry , Greenfield , Ballincollig
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?