The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

1869

CONDITIONAL

Louth - Louth County Council

Proposed Development

Permission for development will consist of the following: 1. The demolition of existing conservatory to side of existing dwelling. 2. Construction of new two storey extensions to side and rear (south-east and north-east elevations) of existing dwelling. 3. New windows to side (north-west elevation) of existing dwelling. 4. New rooflight to front (south-west elevation) of existing dwelling. 5. Internal alterations to existing dwelling along with all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Jan 2018

  2. Decision: CONDITIONAL

    15 Mar 2018

  3. Decision due

    26 Mar 2018

  4. Grant issued

    16 Apr 2018

Application Details

Location
The Willows , Drumcar , Co. Louth
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Louth County Council
Site Area
0.5 ha
Floor Area
138 sq m
Residential Units
1

Timeline

Registration Date
30 January 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 March 2018
Grant Date
16 April 2018
Permission Expires
15 April 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
1830N/A19 Jan 2018

Permission for development will consist of the following: 1. The demolition of existing conservatory to side of existing dwelling 2. Construction of new two storey extensions to side and rear (south-east and north-east elevations) of existing dwelling. 3. New windows to side (north-west elevation) of existing dwelling. 4. New rooflight to front (south-west elevation) of existing dwelling. 5. Internal alterations to existing dwelling along with all associated site works.

'The Willows' , Drumcar , Co. Louth

109m
1710CONDITIONAL17 Jan 2017

Permission for dwelling house, detached domestic garage, wastewater treatment unit and percolation area and all associated site works.

Drumcar , Dunleer , Co Louth

234m
18425CONDITIONAL1 Jun 2018

The development will consist of the replacement of approximately 34m of existing 2.4m high chainlink perimeter fencing and associated access / emergency gates with new 2.4m high green palisade security fencing / gates and all associated site works.

Drumcar AGI , Drumcar , Dunleer

309m
2455CONDITIONAL15 Apr 2024

Retention permission for an existing single storey domestic garage and garden shed to rear of dwelling together with associated site works

Drumcar , Dunleer , Co Louth

334m
2089CONDITIONAL11 Feb 2020

Permission sought for dwelling house, wastewater treatment system and percolation area, access to site via family laneway and all associated site works

Drumcar , Dunleer , Co. Louth

335m
191074N/A18 Dec 2019

Permission sought for dwelling house, waste water treatment system and percolation area, access to site via family laneway and all associated site works

Drumcar , Dunleer , Co Louth

363m
22109CONDITIONAL11 Feb 2022

retention permission for an existing single storey extension to side of existing dormer style dwelling house and retention of existing detached domestic garage with attached storage area

Drumcar , Dunleer , Co Louth

393m
21819CONDITIONAL2 Jul 2021

Permission for the construction of a dwelling house, installation of a waste water treatment system/percolation area and new vehicular road entrance from public road

Drumcar , Dunleer , Co Louth

594m
17911CONDITIONAL8 Dec 2017

Permission for development will consist of proposed installation of proprietary waste water treatment system/percolation area together with associated siteworks.

Drumcar , Dunleer , Co. Louth

612m
21972CONDITIONAL3 Aug 2021

Permission for a dwelling house, waste water treatment system and associated site development works. **Significant Further Information received 12/01/2022**

Drumcar , Dunleer , Co Louth

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?