18786

N/A

Kilkenny - Kilkenny County Council

Proposed Development

to construct new dwelling house, install effluent treatment unit with percolation area, form new entrance and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Nov 2018

  2. Application withdrawn

    18 Dec 2018

Application Details

Location
Gorteen Td , Moneenroe , Co. Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.4 ha
Floor Area
166 sq m
Residential Units
1

Timeline

Registration Date
28 November 2018
Status
WITHDRAWN
Decision
N/A
Withdrawn
18 December 2018

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
18835CONDITIONAL19 Dec 2018

to construct new dwelling house, install effluent treatment unit with percolation area, form new entrance and all associated site works

Gorteen Td , Moneenroe , Co Kilkenny

22m
18197CONDITIONAL27 Mar 2018

for construction of single storey extension to rear of dwelling, conversion of existing garage into sunroom, construction of store between dwelling and garage, retention permission for two storey extension to rear of as constructed, and all associated site works at

Gorteen , Castlecomer , Co Kilkenny

249m
17773CONDITIONAL23 Nov 2017

for a bungalow, domestic gargare, a packaged wastewater treatment system and sand polishing filter, new entrance and all necessary and associated site works

Vera Lane , Gurteen , Castlecomer

250m
17125N/A2 Mar 2017

for the following: (a) Erection of 1.5 Storey Dwelling House, (b) Installation of Domestic Waste Treatment and Disposal system, (C) New Entrance from Public Road, (d) Associated Works

Gurteen , Castlecomer , Co. kilkenny

250m
17332REFUSED22 May 2017

Permission for (a) erection of 1.5 storey dwelling house (b) Installation of domestic waste treatment and disposal system (c) New entrance from public road (d) associated works at

Gurteen , Castlecomer , Co. Kilkenny

252m
19914CONDITIONAL10 Dec 2019

to construct a bungalow, garage, new entrance and install a waste water treatment system and polishing filter and all ancillary siteworks

Gurteen , Castlecomer , Co. Kilkenny

259m
19677CONDITIONAL20 Sept 2019

for extension to existing engineering workshop as constructed and all associated works at existing engineering facility

Gurteen (Gorteen) , Castlecomer , Co. Kilkenny

394m
20402CONDITIONAL26 Jun 2020

to construct a two storey dwelling house, detached garage, wastewater treatment system, percolation area, new vehicular entrance, landscaping and all associated site works

Gorteen , Castlecomer , Co. Kilkenny

494m
22714CONDITIONAL8 Nov 2022

to construct (1) Milking parlour incorporating dairy, plant , storage, Meal Bin, Rain Water storage tank, holding yard with crush/drafting yard, underground effulent tank with flow channels (ii) cubicle shed extension with slatted tank and all associated site works.

Gorteen , Castlecomer , Co. Kilkenny

497m
18566CONDITIONAL28 Aug 2018

for minor alterations to previously granted Planning Reference No. 16/530. The alterations include the removal of a first floor balcony area now incorporated within a first floor bedroom, alterations to external dormer windows on side elevation and all associated site works at

Gurteen , Castlecomer , Co Kilkenny

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?