The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

18791

N/A

Kildare - Kildare County Council

Proposed Development

the construction of a two storey dwelling, the upgrading of the existing farm driveway, installation of a new wastewater treatment plant and percolation area, and all the associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Jul 2018

  2. Further information requested

    24 Aug 2018

  3. Further information received

    14 Feb 2019

  4. Application withdrawn

    13 Mar 2019

Application Details

Location
Great Connell , Newbridge , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.259 ha
Floor Area
317 sq m
Residential Units
1

Timeline

Registration Date
2 July 2018
Status
WITHDRAWN
Decision
N/A
Withdrawn
13 March 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

59m
18792N/A2 Jul 2018

a one-storey dwelling, the upgrading of the existing farm driveway, installation of a new wastewater treatment plant and percolation area, and all the associated site works

Great Connell , Newbridge , Co. Kildare

127m
23821REFUSED1 Aug 2023

the construction of a backland family cluster of houses consisting of one detached single storey dwelling and one detached two storey dwelling, each with separate waste-water treatment plant and percolation area; the utilisation and up-grading of the existing farm entrance and all associated site works

Great Connell , Newbridge , Co. Kildare

151m
21634CONDITIONAL10 May 2021

1. The conversion of the attic space of existing single storey dwelling house to habitable accommodation providing bedroom with en-suite, w.c., home office and games room and 2. Provision of a single storey garden room to rear garden of existing dwelling house together with all ancillary site development works

Great Connell , Newbridge , Co. Kildare

308m
22451REFUSED19 Apr 2022

development consists of: (a) The construction of a single storey dwelling with a floor area of 162 sqm; (b) The upgrading of an existing agricultural entrance to provide safe vehicular access to the site; (c) The provision of a new wastewater treatment system and associated percolation area; and (d) All associated site development works

Great Connell , Newbridge , Co. Kildare.

345m
23111CONDITIONAL8 Feb 2023

retaining additional floor area constructed at ground floor level and at first floor level to the rear of existing dwelling previously granted under planning reference 06/1416, retaining additional rooflights over storage areas to front and rear, retaining external viewing area to the rear and all ancillary site works

'The Bungalow' , Great Connell , Newbridge

351m
2360132N/A22 Aug 2023

FOR CONSTRUCTION OF A DETACHED SINGLE STOREY BUNGALOW, UPGRADE EXISTING AGRICULTURAL ENTRANCE, SECONDARY EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS.

GREAT CONNELL , NEWBRIDGE , CO. KILDARE

356m
2360138REFUSED23 Aug 2023

for construction of a detached single storey bungalow, upgrade existing agricultural entrance, secondary effluent treatment systems and all associated site works

Great Connell , Newbridge , Co. Kildare

379m
2560060CONDITIONAL28 Jan 2025

for a 44.5 m extension of the established spur road from the Newbridge Southern Outer Orbital Road (NSOOR) along the eastern boundary of the Murphy International Limited Headquarters site at Great Connell, Newbridge, and the widening and modification of the existing pedestrian zebra crossing on the spur road to the Headquarters site. The proposed spur road extension comprises a single carriageway road of 7.5m in width with 2 no. 2 m wide cycleways and 2 no. 2 m pedestrian pathways, a 1.5 m grass verge on each side, and a 1.5m landscape buffer zone along western boundary, and all associated development and works including surface water, water services and utilities infrastructure including lighting, landscaping and works

To the east of Murphy International Limited Headquarters , Great Connell , Newbridge

438m
211780CONDITIONAL17 Dec 2021

works to the existing Murphy International Limited Headquarters to accommodate two new industrial buildings, comprising a Steel Fabrication building and a Pipe Ancillary building, and associated development and works. The Steel Fabrication Building of 2,495 sqm is 13.1 metres in height and accommodates a fabrication area of 2,229 sqm and a staff welfare area of 133 sqm at ground floor level, and an ancillary office of 133 sqm at first floor level. The Pipe Ancillary Building of 760 sqm is single storey and 9.3 metres in height, and will accommodate workshops. Solar photovoltaic panels are proposed on the roofs of both buildings. It is proposed to demolish 4 No. existing buildings including an Office (300sqm), Lean-to Warehouse (240 sqm), Warehouse (415 sqm), and a Storage Barn (112 sqm), and to demolish the existing boundary walls on Great Connell Road and on part of the existing access road. It is proposed to upgrade the existing access road to provide a 7.5 metre carriageway, 1.5 metre grass verge, 2 metre cycle lane, 2 metre footpaths, tree planting and a 2.5 metre boundary wall to the subject site, and to upgrade the boundary on Great Connell Road by removing the existing entrances and providing a 1.5 metre grass verge, 2 metre cycle lane, 2 metre foot path, tree planting and a 2.5 metre acoustic timber fence. It is proposed to provide 84 No. car parking spaces and 33 No. bike parking spaces, 3 No. signs of 5.2 sqm each are proposed; 1 No. on the southwest elevation of the Steel Fabrication Building, 1 No. on the northeast elevation of the Pipe Ancillary Building, and 1 No. on the northwest elevation of the Pipe Ancillary Building. The existing yard will be extended by 0.9 ha. These and all ancillary works including the regrading of an existing drainage ditch, all water infrastructure, internal roads, and landscaping are proposed on a site of 4.7 ha.

Great Connell , Newbridge , Co. Kildare.

447m
21217CONDITIONAL24 Feb 2021

Development will consist of (a) construction of a single storey extension to the rear of the existing dwelling including associated alterations to internal layout of the existing dwelling and (b) construction of a domestic shed and (c) enlarging the existing entrance gate, and all associated site works.

Rochfort , Greatconnell , Newbridge

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?