CONSTRUCT A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA UP TO 2.178HA, TO INCLUDE 60 NO SELF-CONTAINED BATTERY CONTAINER UNITS WITH ASSOCIATED HVAC COOLING UNITS, 14 CONVERTER AND 14 STEP UP TRANSFORMER CONTAINER UNITS, ASSOCIATED COMPOUND CABLING AND DUCTING, A GRID TRANSFORMER , A SINGLE STOREY SUBSTATION/CONTROL BUILDING WITH WELFARE FACILITIES, A FOUL WATER HOLDING TANK , A CABLE ROUTE GRID CONNECTION TO THE ADJACENT ESB SUBSTATION , MAINTENANCE LIGHTING, SECURITY FENCING , A CCTV MONITORING SYSTEM, LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE ON LANDS. A TEN YEAR PLANNING PERMISSION IS BEING SOUGHT TO CONSTRUCT THE DEVELOPMENT
View the full application file on the council's planning portal →Application Timeline
Application received
28 Aug 2018
Application withdrawn
12 Sept 2018
Application Details
- Location
- SHRONEBEIRNE , LISTOWEL , CO. KERRY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kerry County Council
- Site Area
- 2.178 ha
Timeline
- Registration Date
- 28 August 2018
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 12 September 2018
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
INVALID APPLICATION
SHRONEBEIRNE , LISTOWEL , CO KERRY
CONSTRUCT A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF UP TO 2.178HA, TO INCLUDE 60 NO SELF-CONTAINED BATTERY CONTAINER UNITS WITH ASSOCIATED HVAC COOLING UNITS, 14 CONVERTER AND 14 STEP UP TRANSFORMER CONTAINER UNITS, ASSOCIATED COMPOUND CABLING AND DUCTING, A GRID TRANSFORMER, A SINGLE STOREY SUBSTATION/CONTROL BUILDING WITH WELFARE FACILITIES , A FOUL WATER HOLDING TANK, A CABLE ROUTE GRID CONNECTION TO THE ADJACENT ESB SUBSTATION, MAINTENANCE LIGHTING , SECURITY F3ENCING, A CCTV MONITORING SYSTEM , LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE ON LANDS
SHRONEBEIRNE , LISTOWEL , CO KERRY
CONSTRUCT A BATTERY STORAGE FACILITY WITHIN A TOTAL SITE AREA OF 2.178HA, TO INCLUDE 60 NO SELF-CONTAINED BATTERY UNITS WITH ASSOCIATED HVAC COOLING UNITS, 14 CONVERTER AND 14 STEP UP TRANSFORMER CONTAINER UNITS, ASSOCIATED COMPOUND CABLING AND DUCTING, A GRID TRANSFORMER, TWO SINGLE STOREY SUBSTATION/CONTROL BUILDINGS WITH WELFARE FACILITIES, A FOUL WATER HOLDING TANK, A CABLE ROUTE GRID CONNECTION TO THE ADJACENT ESB SUBSTATION, MAINTENANCE LIGHTING, SECURITY FENCING, A CCTV MONITORING SYSTEM, LANDSCAPING WORKS AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE NECESSARY TO FACILITATE THE DEVELOPMENT ON LANDS. A NATURA IMPACE STATEMENT HAS BEEN SUBMITTED WITH THIS APPLICATION
SHRONEBEIRNE , LISTOWEL , CO KERRY
CHANGE OF DESIGN TO SUBSTATION BUILDING WITHIN PLANNING REFERENCE 18/847. THE NEW BUILDING DESIGN WILL INCORPORATE A 23% REDUCTION OF PLAN AREA AND A REDUCED HEIGHT. THE PERMITTED BUILDING WILL BE SPILT INTO TWO AND LOCATED ON A SIMILAR FOOTPRINT TO THE ORIGINAL ON LANDS
SHRONEBEIRNE , LISTOWEL , CO KERRY
FOR CHANGE OF DESIGN TO THE SUBSTATION COMPOUND PERMITTED CARE OF REG NO 18/931, CREATING 2 NO COMPOUND AREAS; ESB COMPOUND AND IPP COMPOUND AND A SEPERATE CONTROL BUILDING WITHIN EACH COMPOUND, SEPERATE ENTRANCE GATES AND ALL ASSOCIATED SITE WORKS
SHRONEBEIRNE , LISTOWEL , CO KERRY
permission to construct a battery storage facility including self-contained battery units with associated HVAC cooling and inverter equipment, associated compound cabling and ducting, electrical substation including grid transformer and single storey control building with welfare facilities, a foul water holding tank, an underground cable route grid connection to the adjacent ESB substation, maintenance lighting, security fencing, a CCTV monitoring system, landscaping works and all associated ancillary infrastructure necessary to facilitate the development on lands at Shronebeirne, Listowel, Co. Kerry. A Natura Impact Statement (NIS) was prepared in respect of the proposed development and accompanies the application.
Shronebeirne , Listowel , Co. Kerry
TO CONSTRUCT A NEW SITE ENTRANCE WITH SPLAYED ENTRANCE WALLS AND NEW ENTRANCE GATES, INCLUDING ALL ASSOCIATED ANCILLARY SITE WORKS AND BOUNDARY TREATMENT
SHRONEBEIRNE , LISTOWEL , CO KERRY
(A) CONSTRUCT A SINGLE STOREY EXTENSION TO THE REAR (SOUTH) ELEVATION, (B) MINOR CHANGES TO BOTH THE FRONT (NORTH) ELEVATION AND SIDE (EAST) ELEVATION OF EXISTING DWELLING, (C) DECOMMISSION EXISTING SEPTIC TANK AND (D) INSTALL A NEW PACKAGED WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL NECESSARY ANCILLARY SITE WORKS.
SHRONEBEIRNE , LISTOWEL , CO. KERRY
Full planning permission to (A) construct new dwelling house and (B) construct new septic tank and percolation area along with all ancillary site services at Coolroe Upper, Glenbeigh, Co.Kerry
Coolroe Upper , Glenbeigh , Co.Kerry
RETAIN HIS DOMESTIC GARAGE AS CONSTRUCTED ON HIS SITE
LACKA EAST , KILMORNA , LISTOWEL
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?