19/4674
INCOMPLETED APPLICATIONCork - Cork County Council
Proposed Development
The creation of a site entrance onto a public road in order to facilitate a forestry operation.
View the full application file on the council's planning portal →Application Timeline
Application received
20 Mar 2019
Decision due
14 May 2019
Application Details
- Location
- Carrigcleena More Mallow Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 20 March 2019
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 14 May 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Creation of a site access into a forestry plantation to facilitate a timber harvest and haulage operation, the proposed development consists of the creation of a bellmouth/back in loading bay
Carrigcleena More Dromore Mallow Co. Cork
The application site comprises an existing asphalt plant (permitted under planning reg. 06/4390). The proposed development seeks to provide for the occasional operation of the asphalt pant outside normal working hours up to a maximum of 40 no. days per annum. The proposed development also provides foe additions / alterations to the existing asphalt plant including the reorientation of the existing cold feed bins and the provision of hot storage unit.
Carrigcleena More Bweeg Co. Cork
The application site comprises an existing asphalt plant (permitted under planning reg no. 06/4390). The proposed development seeks to provide for the occasional operation of the asphalt plant outside normal working hours up to a maximum of 40 no. days per annum. The proposed development also provides for additions/alterations to the existing asphalt plant including the reorientation of the existing cold feed bins and the provision of a hot storage unit.
Carrigcleena More Bweeng Co. Cork
Retention of asphalt plant with associated feed hoppers, bitumen storage tanks, bunded diesel tank and generator
Carrigcleena Quarry Carrigcleena More Bweeng Mallow
Retention of change of use from quarry to asphalt plant
Carrigcleena Quarry Carrigcleena More Bweeng Mallow
Change of use of silage pit to cubicles and crush, construction of silage slab, dungstead, covered and uncovered feed passage, removable feed rail, floatation channel and slatted unit incorporating slatted tanks, feed areas and feed passage
Carrigcleena More Bweeng Mallow
The development consists of the retention of demolition of structures previously used for aggregate storage purposes, comprising of an aggregate storage structure measuring approx. 1,130m2, an aggregate storage structure measuring approx. 135m2 and an aggregate storage structure measuring approx. 180m2. Permission for retention of demolition of a canteen building measuring approx. 109m2 is also being sought, all within an application area of c. 0.164ha.
Carrigcleena More Bweeng Co. Cork
The development will consist of a readymix concrete batching plant and a concrete block production facility comprising of a concrete batching plant, mobile block making machine, block production area (4,285m2), block storage area (1457m2), closed circuit settlement system and all ancillary works within an application area of c. 1.1ha.
Carrigcleena More Bweeng Co. Cork
The development will consist of a readymix concrete batching plant and a concrete block production facility comprising of a concrete batching plant, mobile block making machine, block production area (4,285m2), block storage area (1,457m2), closed circuit settlement system and all ancillary works within an application area of c. 1.1ha.
Carrigcleena More Bweeng Co. Cork
The development will consist of a readymix concrete batching plant and a concrete block production facility comprising of a concrete batching plant, mobile block making machine, block production area (4,285m2), block storage area (1,457m2), closed circuit settlement system and all ancillary works within an application area of c.1.1ha.
Carrigcleena More Bweeng Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?