construction of a stone boundary wall with pedestrian access gate and all ancillary works to front of dwelling house
View the full application file on the council's planning portal →Application Timeline
Application received
23 Oct 2019
Decision: CONDITIONAL
3 Dec 2019
Decision due
17 Dec 2019
Grant issued
14 Jan 2020
Application Details
- Location
- 'The Cottage' , Coolcappa , Ardagh Co. Limerick.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Limerick County Council
Timeline
- Registration Date
- 23 October 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 3 December 2019
- Grant Date
- 14 January 2020
- Permission Expires
- 13 January 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of 2 no. new classrooms, internal alterations to existing classrooms and a new entrance with access ramp and all associated site works
Coolcappa National School , Coolcappa , Ardagh Co. Limerick.
the construction of a slatted shed, feed passages and concrete apron
Coolcappagh , Ardagh , Co. Limerick
filling proposed land with suitable material to the proposed levels and all associated site works
Coolcappa , Ardagh , Co. Limerick
making modifications to existing dwelling, including amendments to the front elevation and a two storey extension to the side and rear of the existing dwelling, demolition of existing garage and construction of a new garage and all associated works
Ballinamuddagh , Coolcappa , Ardagh Co Limerick
construction of a dwelling house, site entrance, septic tank and percolation area along with all associated site works
Ballykenry , Ardagh , Co. Limerick.
a dwelling house, waste water treatment system, percolation area, site entrance and all associated site works
Gortroe , Rathkeale , Co. Limerick
a dwelling house, waste water treatment system, percolation area, site entrance and all associated site works
Gortroe , Rathkeale , co.Limerick
the extension at the rear of the existing garage, boundary walls, entrance walls and all associated site works
Gortroe , Rathkeale , Co. Limerick.
six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-site substation to the existing Carrons substation to the west of the site. Grid Connection Option B: Loop into the existing 38kV onsite overhead line via the proposed 38kV substation. A new temporary site entrance off the L1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the L1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the Ahacronane River by an internal site access track to the northwest of turbine T1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of Foynes to the wind farm site entrance via L6188, N69, L1222, L1220 and L1219. The Applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the Renewable Energy Directive III (Di
within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan , Carrons and Lisbane , Co. Limerick
a new toilet block and install a waste water treatment system, percolation area and all associated site works
Rathgoonan , Ardagh , Co. Limerick.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?