Proposed Development

to; 1. Construct milking facilities to include parlour, dairy, store, plant room, office and associated handling / drafting facilities with slatted float channel. 2. Construct un-roofed slatted feed / collection yard to include slatted tanks, feed passages and concrete aprons. 3. Reconstruct and extend existing slatted shed to accommodate cubicles, un-roofed cubicles and slatted feed area to include slatted tanks and float channels. 3. Erect meal bin to include all associated works. Gross floor space of proposed works: 1. Milking facilities, etc. = 505.10 sqm, 2. Un-roofed feed/collection yard, etc. = 1,291.84 sqm, 3. Un-roofed cubicles, etc. = 599.36 sqm, 4. Meal bin = 7.07 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Sept 2019

  2. Decision: CONDITIONAL

    18 Nov 2019

  3. Decision due

    20 Nov 2019

  4. Grant issued

    9 Jan 2020

Application Details

Location
Castlebin East ,
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway County Council
Site Area
1.54 ha

Timeline

Registration Date
26 September 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 November 2019
Grant Date
9 January 2020
Permission Expires
8 January 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
24310CONDITIONAL23 Oct 2024

to 1; construct extension to existing milking facilities shed to cover existing slatted collection area. 2; Construct extension to existing slatted/cubicle shed to cover existing slatted/cubicle area to include all associated site works at the above location. Gross floor space of proposed works: 458.21 sqm

Castlebin East , New Inn , Ballinalsoe

3m
25265CONDITIONAL3 Oct 2025

to construct a slatted shed with loose housing area to include concrete aprons and all associated site works

Castlebin East , New Inn , Ballinasloe

308m
2660005CONDITIONAL8 Jan 2026

to construct a new dwelling house with wastewater treatment plant, polishing filter, domestic garage and all associated site works

Cloonatloukaun , New Inn , Ballinasloe

345m
2561317CONDITIONAL12 Sept 2025

to construct a new dwelling house with wastewater treatment plant, polishing filter, domestic garage and all associated site works

Cloonatloukaun , New Inn Ballinasloe , Co. Galway

437m
2460912REFUSED22 Jul 2024

of the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 196.00 sqm

Castlebin South , New Inn , Co. Galway

452m
2361355CONDITIONAL13 Nov 2023

for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm (house)

Castlebin South , New Inn , Ballinalsoe

463m
2461157CONDITIONAL3 Sept 2024

for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 200 sqm (house)

Castlebin South , New Inn , Co. Galway

490m
211692CONDITIONAL16 Sept 2021

the construction of an above ground installation (AGI) facility, for the maintenance of an existing gas pipeline. Proposed development will include below ground and above ground pipework, internal road accessed from L7445 road and all associated civil and earthworks. The site will be fenced by a 2.4m high security palisade and 1.2m cattle fence, with associated planting strip as visual screening. The development does not contain any new buildings or enclosures. Total site area is c. 1977 sqm/0.1977 ha.

CASTLEBIN SOUTH ,

544m
2361354CONDITIONAL13 Nov 2023

for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm (house)

Castlebin South , New Inn , Co. Galway

573m
2460585CONDITIONAL21 May 2024

for the construction of a dwelling house, waste water treatment system and all associated site works. Gross floor space of proposed works: 204 sqm

Castlebin South , New Inn , Co. Galway

Planning a project of your own?