The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

19153

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

construction of an extension to dwelling, demolition of outbuilding, renovation of outbuilding and ancillary works, and installation of new septic tank and percolation area

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Feb 2019

  2. Further information requested

    16 Apr 2019

  3. Further information received

    28 Jun 2019

  4. Decision: CONDITIONAL

    24 Jul 2019

  5. Decision due

    25 Jul 2019

  6. Grant issued

    27 Aug 2019

Application Details

Location
Abington , Murroe , Co. Limerick.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council

Timeline

Registration Date
22 February 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
24 July 2019
Grant Date
27 August 2019
Permission Expires
26 August 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

108m
17616CONDITIONAL30 Jun 2017

to retain and complete substantially completed detached two storey dwelling house which was granted planning permission under Planning Ref No: 08/2213 & permission for new entrance, site boundaries, septic tank, percolation area, and detached garage, including all associated site works

Abington , Murroe , Co Limerick

185m
19133CONDITIONAL15 Feb 2019

a new dwelling, garage, septic tank, percolation area, entrance and associated works

Farnane , Murroe , Co. Limerick.

213m
201283CONDITIONAL4 Dec 2020

a dwelling house, garage, wastewater treatment system, site entrance and all associated site works above and below ground(ref. no. of outline permission 18/1115)

Abington , Murroe , Co. Limerick

220m
181115CONDITIONAL15 Nov 2018

a dwelling house, garage, wastewater treatment system, site entrance and all associated site works above and below ground

Abington , Murroe , Co. Limerick.

320m
201140CONDITIONAL6 Nov 2020

the demolition of a later mass concrete outbuilding to the North west of the dwelling house and its replacement with a single storey building containing 2 no. bedrooms, a small study and bathroom, linked to the main house via a single storey glazed garden room, minor amendments to the internal layout of the main house to provide an en-suite and walk in wardrobe at first floor level. No other changes are proposed. Castle Comfort House is a recorded Protected Structure (P.P.S. 83)

Castle Comfort House , Farnane , Murroe Co. Limerick

496m
21967CONDITIONAL8 Jul 2021

the construction of an entrance, single storey dwelling house, domestic garage, waste water treatment system with polishing filter together with all associated site works

Abington , Murroe , Co. Limerick

526m
22652CONDITIONAL9 Jun 2022

the construction of a vehicular entrance, dwelling house, domestic garage, home office outbuilding, domestic wastewater treatment system with polishing filter together with all associated site works

Abington , Murroe , Co. Limerick

531m
2561138CONDITIONAL6 Nov 2025

the construction of a vehicular entrance, dwelling house, domestic garage, home office outbuilding, domestic waste water treatment system with polishing filter together with all associated site works. Outline Planning Permission ref number 22/652

Abington , Murroe , Co. Limerick

566m
197017CONDITIONAL3 Jul 2019

Extension of Permission for Planning Ref. 13/705 and 18/530: change of house design granted planning permission under planning ref. 13/705 from a dormer dwelling house to a single storey dwelling house and associated site works

Abbington , Murroe , Co. Limerick.

594m
18530CONDITIONAL30 May 2018

change of house design granted planning permission under planning ref. 13/705 from a dormer dwelling house to a single storey dwelling house and associated site works

Abbington , Murroe

Planning a project of your own?

Find out in two minutes whether you need planning permission -- free, based on the exempted development regulations.

Do I Need Permission?